Key Takeaways
- Swarnagiri proves the model: Q2 PAT jumped to ₹13.91 Cr from ~₹6 Cr in Q1, delivering ~50% PAT margin and ~70% EBITDA margin on ~135 kilos of gold production, validating management's long-standing projections for gold mining profitability.
- Kyrgyzstan crosses the start line: The Altyn Tor plant was commissioned on 12th September 2026 and produced its first doré bar, with 1.2 kilos dispatched to test the full refinery-to-sale cycle, though winter operations remain untested and production guidance is still pending.
- The Ganajur catalyst is now in the Supreme Court's hands: The case, which management calls the strongest among all batch matters due to its seamless progression from reconnaissance to mining lease approval, was heard on 17th November and posted for 1st December, with a senior counsel now arguing Deccan's case separately.
- Consolidated losses are narrowing but persist: H1 consolidated loss stood at ₹9.28 Cr as all tier-two projects and subsidiaries remain pre-commercial, though the trend is improving as Swarnagiri's contribution grows.
- What to watch next quarter: Whether Altyn Tor delivers winter production data in the next 15–20 days, the Supreme Court's direction on Ganajur at the 1st December hearing, and how much of the ₹134 Cr inventory converts to Q3 revenue after October–November sales.
Swarnagiri: The Proof of Concept
- Production ramp validated: Output rose from 89 kilos in Q1 to ~135 kilos in Q2, reaching ~40 kilos/month, consistent with the guided 40–45 kilos/month trajectory. Full-year FY27 production is expected at 450–500 kilos, close to 500.
- Recovery rates delivered: The gold circuit achieved 90–95% recovery, attributed to extensive test work carried out over years.
- Margins at scale: PAT margin of ~50% and EBITDA margin of ~70% were achieved in H1, though management cautioned that falling gold prices could compress Jonnagiri EBITDA to the 65–67% range given a production cost of ~₹4,000/gram versus a market price of ₹13,000–14,000.
- Inventory held for price advantage: ~133 kilos of doré plus bullion, valued at ₹134 Cr on the books at production cost (including ROM and gold in circuit), was held back ahead of the festive season; significant sales occurred in October–November and will reflect in Q3 results.
- Resource growth underway: Ongoing drilling could increase the overall resource from 12 tons to 30 tons in another one-and-a-half years, significantly increasing project value. A potential listing of Swarnagiri is being contemplated over the next two to three quarters.
- Long-term scale: Production could reach ~1 ton per annum with new approvals, and eventually ~2 tons once all resources are identified. No further equity infusion from Deccan is expected since Swarnagiri is now self-funding from revenues.
Dr. Hanuma P Modali: "This quarter has clearly demonstrated the profitability of the gold mining operation that is from the Swarnagiri Gold Mines... So that speaks a lot about the technical capability of the team and the way that the work has been carried out. And as a result, we are able to see on table now whatever that has been predicted."
Kyrgyzstan: Commissioned, but Winter Is the Test
- First gold produced: The Altyn Tor plant was commissioned on 12th September 2026 and produced its first doré bar, the first time a doré bar has gone directly from the Altyn Tor project; previously only gravity concentrates were produced under government operation.
- End-to-end cycle being tested: 1.2 kilos of doré were dispatched to the government-owned refinery to test the full process: refinery to bullion to sale to the National Bank to money receipt.
- Winter operations are uncharted territory: This is the first time the entire plant is being operated during winter; management expects to understand production capacity in the next 15 to 20 days once the complete circuit runs with actual ore, not tailings.
- Near-term plan: ~30,000 tons of ROM and semi-processed material are currently being run through the circuit for commissioning; results expected by end of December. After full circuit commissioning, the plan is to process tailings for the next 2–5 years, keeping operational costs low.
- Ramp-up potential: Once underground mining begins with higher grades of 2.5–3 g/t, production capacity could double from the projected 700–750 kilos. Management called a ramp-up to 300 kg next year and 600+ kg thereafter "perfectly achievable," but is non-committal on the first year due to untested winter operations.
- PAT margin expectation: Management expects PAT margins around 30–35%, maximum 40%, with exact numbers available after one more quarter of results.
- Equity consolidation: Deccan is working to increase its equity in the Kyrgyzstan project, likely through acquisition from other shareholders, to consolidate more cash generated there into Deccan. Current net stake is about 49%.
Dr. Hanuma P Modali: "I also would like to say this is the first time this entire plant is being operated during winter. So, it is not that we are not going to face any challenges, but we would like to see and you have to give me that much of time, at least another 15, 20 days, how this is going to happen."
Ganajur: The Supreme Court Catalyst
- Case status: The matter is part of batch matters in the Supreme Court; the last hearing was on 17th November, where the court observed all connected matters (L&T, Dalmia, Shree Cements, ~8–9 companies including Indocil) will be heard holistically. The matter was posted for 1st December at the Union of India's request for postponement.
- Deccan's case strength: Management asserts this is the only case among those being heard that progressed from reconnaissance permit to prospecting license to mining lease through a seamless transition under the old policy. The state recommended it in 2010, the Ministry of Mines granted prior approval in 2015, Karnataka's legal branch gave a clear opinion that the mining lease must be granted, and the Ministry reaffirmed approval in 2017.
- Separate legal strategy: Deccan has joined as an intervener in the Indocil case and engaged a well-known senior counsel to argue its case separately, presenting that Deccan's application is fundamentally different from and stronger than Indocil's. The Supreme Court judges have pronounced they will hear everyone involved.
- Timeline if granted: Even if the mining lease is granted in the next few months, management estimates ~6 months for MoEF clearance and IBM approvals, plus land acquisition, plus a minimum 18 months of construction, totaling ~2 years minimum. If granted by March 2027, the plant could run by March 2030, though land acquisition could add another 6–12 months.
- Economics at scale: A 1,000-ton plant producing ~3.2–3.3 kilos of gold per day (~1 ton per annum) could deliver EBITDA margins upwards of 70%, close to 75–80% depending on the gold price, because higher grade means lower opex.
- Revenue mix impact: Management expects 60% of revenues to come from gold over the next five years, but if Ganajur comes, it will significantly alter the entire equation.
Dr. Hanuma P Modali: "This is the only one among all the cases that are being heard, which has progressed from reconnaissance permit to prospecting license to ML. So through a seamless transition, at least that is the old policy. So that has clearly, as I am hearing, that seems to be the big strength of our application."
Exploration Pipeline: Drilling Delayed, Portfolio Advancing
- Fundraise closing: ~₹137 Cr was raised via board approval in August and EGM in September; BSE approval was received very recently and funds are being collected, expected to close in 3–4 days. The money is primarily for drilling operations across the portfolio.
- Bhalukona (gold, India): 2,000 meters of diamond drilling completed across 15 holes; a mineralized zone over 1.3 km has been identified. A metallurgical process flow sheet is in progress, and management plans to launch a mining application by H1 2027. Full production is likely in 2029, with pilot-scale operation possible by 2028. The plant could be a 3,000 ton per day operation, twice the size of Jonnagiri.
- Logrosán (tungsten-tin, Spain): 5,400 meters of drilling completed; every completed hole intersected potentially economic tungsten and tin mineralization. The Maria license is also being drilled for gold and antimony, with first antimony results at about 1,000 ppm. A few more holes are planned before lodging a mining application.
- Finland (gold): Drilling of 1,000–1,500 meters is planned but could not commence due to delay in BSE approvals; will start once money comes in. The final aim is an 800 ton per day processing plant producing 700–800 kilos per year, based on successful drilling and resource proving.
- Mozambique: 1,500–2,000 meters of drilling planned with targets identified; will drill this quarter once money comes. Management strongly believes Mozambique can go into commercial operations very soon, at least in 2028. The regolith profile is being evaluated for tantalum, which could enable very quick production.
- Three acquisitions under due diligence: Two gold projects (one in Finland, one brownfield near Terek) and one graphite project are in advanced stages of negotiation.
- Graphite downstream vision: A beneficiation test proved 94% recovery with flaky graphite up to 5 mm flake size. The idea is to bring lithium and graphite concentrates to India and set up a downstream unit to supply advanced material to battery makers, potentially accessing PLI scheme benefits covering 20–30% of required capital.
Dr. Hanuma P Modali: "Once you lose the ground, a geologically potential ground, you are never going to get it back. You can raise more money if you have a good ground. But if you do not have any ground, you cannot raise money also."
Financial Position: Profitable Core, Consolidated Losses Narrowing
- Standalone vs consolidated: Standalone revenue is higher than consolidated because standalone includes interest income on a ₹276 Cr loan to Kyrgyzstan at 15% and consultancy fees billed to Avelum at a small margin, both eliminated on consolidation.
- Consolidated loss drivers: All tier-two projects and subsidiaries except Swarnagiri (an associate company) are pre-commercial production and incur losses; Avelum is incurring significant capital expenditure while close to production.
- Narrowing trend: Consolidated losses narrowed significantly during Q2 due to increased contribution from Swarnagiri, and management expects this narrowing to continue in ensuing quarters until tier-two projects reach commercial production.
- Funding strategy: Once drilling results clarify capex needs, management will look at raising money through debt or equity. For critical mineral projects, the first option is offtake arrangements where the offtake company provides development funds, avoiding dilution. Downstream players have already approached Deccan for offtake arrangements for nickel, lithium, and tungsten.
- No specific PAT guidance: When asked for expected consolidated PAT for 2027 and 2028, management declined to provide numbers, offering only the qualitative explanation that losses are narrowing.
Critical Minerals & Strategic Positioning
- Portfolio thesis: Management believes critical minerals will change the fundamentals of the mining business over the next 10–20 years, driven by geopolitical risk mitigation and national growth requirements. The strategy is to move into intermediate-stage processing (e.g., lithium concentrate to hydroxide) using National Critical Mineral Mission funds and sell to battery makers.
- Revenue mix: Management believes 60% of revenues will come from gold at least in the next five years, with critical minerals as a long-term play.
- Offtake-based funding: Downstream offtake arrangements are being explored as an alternative funding route, particularly for critical mineral projects, to avoid project-level dilution. The idea is to increase Deccan's stake in projects rather than dilute.
- Technology investment: The company is building a small AI team within the exploration team for data analysis and targeting, and satellite/hyperspectral imaging is already in use across all commodities to narrow potential areas from ~1,000 sq km to 200–250 sq km, though management noted it contributes 5–10% of the exploration phase and cannot replace ground work.
- Promoter developments: Management is pursuing an increase in stake by one particular promoter within the group, and noted there are a couple of big names within the group, at least one of which could come in as a new promoter figure, though details are still being worked out and management cannot say anything concretely on this issue.
Dr. Hanuma P Modali: "It is going to change the fundamentals of the mining business as such in the next 10 to 20 years, because it is not just making money out of it, but this is a kind of, it is required for the country against the geopolitical risk or, I mean, even for the growth of the country, these metals are required."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Swarnagiri FY27 production | 450–500 kilos, close to 500 | FY27 (full year) |
| Kyrgyzstan winter production data | Clear idea of production capacity once complete circuit runs | Next 15–20 days |
| Kyrgyzstan Q3 results | Results from processing ~30,000 tons of ROM and semi-processed material | End of December (Q3 FY27) |
| Kyrgyzstan PAT margins | 30–35%, maximum 40% | Exact numbers after one more quarter of results |
| Fundraise closure | ~₹137 Cr collection completed | 3–4 days |
| Finland drilling start | 1,000–1,500 meters | Once money comes in from BSE approvals |
| Mozambique drilling start | 1,500–2,000 meters | This quarter, once money comes |
| Bhalukona mining application | Launch application based on G2 or G1 resource | H1 2027 |
| Bhalukona pilot production | Smaller amounts of concentrate for sale to Indian copper refineries | Possible by 2028 |
| Bhalukona full production | 3,000 ton per day processing plant | Likely 2029 |
| Mozambique commercial production | Small production possible | 2028 or 2028–29 |
| Finland and Spain production | Bigger plants | Around 2029 or 2030 |
| Ganajur plant operation (if ML granted) | ~2 years minimum from grant; if granted by March 2027, plant runs by March 2030 | ~2 years from ML grant |
| Swarnagiri resource growth | Overall resource increase from 12 tons to 30 tons | Another one-and-a-half years |
| Swarnagiri potential listing | Possibility of listing | Next two to three quarters |
| Consolidated profitability | Losses expected to continue narrowing | Ensuing quarters |
| Analyst/investor meets | Conducted this quarter | Before December 15th |
| Monthly production disclosure | Altyn Tor monthly production announced; Swarnagiri numbers sought from associate | Ongoing |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Gold production (Swarnagiri) | 135 kilos, up from 89 kilos in Q1 FY27 |
| Gold recovery rate (Swarnagiri) | 90% to 95% in the gold circuit |
| Profit after tax (Swarnagiri, standalone) | ₹13.91 Cr, against ~₹6 Cr in Q1 FY27 |
| PAT margin (Swarnagiri) | ~50% |
| EBITDA margin (Swarnagiri) | 70% |
| Refined bullion sold (Swarnagiri) | 50.4 kilos |
| Total bullion sales (Swarnagiri, H1 FY27) | ~109 kilos |
| Inventory (Swarnagiri) | ~133 kilos of doré plus bullion, valued at ₹134 Cr at production cost |
| Standalone profit from operations (Swarnagiri, H1 FY27) | ~₹80 Cr on sale revenue of ~₹160 Cr |
| Deccan share of profit (Swarnagiri, H1 FY27) | ~₹20.57 Cr |
| Consolidated loss (H1 FY27) | ₹9.28 Cr, narrowing due to increased contribution from Swarnagiri |
| First gold doré dispatched (Altyn-Tor, Kyrgyzstan) | 1.2 kilos, sent to refinery as a test consignment |
| Altyn-Tor target (FY27) | ~180 kilos |
| Altyn-Tor PAT margin guidance | 30% to 35%, maximum 40% |
| Funds raised | ₹137 Cr, for exploration projects (Finland, Bhalukona, Spain, Mozambique) |
| Ganajur Supreme Court hearing | 1st December 2026 |