Key Takeaways
- The quarter Deccan became a producer: Geomysore (26% associate) sold gold from trial production and turned profitable, flowing into Deccan's books as India's first private gold mine commissioned since independence.
- Kyrgyzstan is weeks from first doré: The gravity circuit is running and the Merrill-Crowe system commissions in June; management expects doré bars next month and full-scale commercial production from August.
- A nickel-copper-PGE discovery changes the narrative: The first drill hole at Bhalukona hit 60m of mineralized layers with massive sulphides, and management is fast-tracking a mining lease application by October 2026.
- The balance sheet is clean but the funding gap is real: ₹315 crores raised via rights issue cleared all debt, but ₹55 crores was diverted to maintain the Geomysore stake, leaving a deficit for Kyrgyzstan that a fresh ₹100 crores raise aims to fill.
- What to watch next quarter: Whether doré bars actually flow from Kyrgyzstan in June/July, the Spain tungsten drill results due within 10 days, and the structure and pricing of the promised larger fund raise.
The Producer Transition
- Jonnagiri delivered first profits: Geomysore set up a refinery, sold bullion from trial production, and became profitable, a milestone management calls "defining" after years of market frustration over delays.
- Production is ramping slowly: March and April each produced roughly 30 kg of gold; FY2027 is guided at 600 kg, FY2028 at 800 kg with a peak around 1 ton per year.
- Expansion needs more permits: Moving beyond the current 2,000 tpd plant requires a public hearing and additional approvals; management expects clarity in 6–8 months, with any expansion reflected in FY2028 figures.
- No dividends yet from the associate: Geomysore projects ₹120 crores PAT but will retain all cash for expansion; an IPO in 1–2 years is a possibility but no decision has been taken.
- Land acquisition is still underway: Three more blocks remain to be acquired at Jonnagiri; the district collector has ordered conversion of government and ceiling land for the company.
Hanuma Prasad: "This quarter has been a very defining quarter for us, wherein we got into some kind of revenue and the profits, not revenue exactly, the profits we were able to show. There have been a lot of question marks, doubts, whether all these projects, because this is the first gold project in India, whether this is going to happen or not and added to that there were delays and there is obviously frustration in the market which all that we could sustain and we could deliver."
Kyrgyzstan: The Near-Term Catalyst
- Commissioning is in its final stage: The gravity circuit is already producing gold concentrates; the Merrill-Crowe circuit commissions in June for doré bar production; the full-scale leach circuit and tailing dam are targeted for end-July, with commercial production from August 2026.
- First doré bars expected next month: Management stated that by June 2026, doré bars will be generated through a leasing circuit, putting the project technically into production, with July described as "very, very hopeful" and no hurdles foreseen.
- An inauguration is being planned: The company is targeting either August 15 (India Independence Day) or August 31 (Kyrgyz Independence Day) 2026 for the formal inauguration, with investors to be informed in advance.
- Cash flows return to Deccan quickly: The investment went in as debt at 15% interest; as soon as revenues start, money flows back as debt repayment with 15% interest, avoiding dividend tax leakage for at least 1–1.5 years.
- Delays traced to money transfers and weather: Indian banks held overseas direct investment transfers for 15 days to a month; a September delay meant winter from October froze civil construction for 3–4 months at minus 30 degrees. Management acknowledged planning for civil work could have been better.
- Gold is sold to the National Bank of Kyrgyzstan: Doré bars are sold to the National Bank at LBMA price minus refining charges; the bank holds a right of first refusal.
- A resource update is imminent: A revised resource estimate will be submitted to the state reserve company by end-June, with a revised mine design and life-of-mine plan by August 2026.
- Underground mining is a 3–4 year story: More drilling is needed to design an underground operation, which will take 1.5–2 years; funding will come from the project's own revenues, with additional capital of ₹50–100 crores for shaft and decline development.
Hanuma Prasad: "By next month, once we generate some amount to doré bars through leasing circuit, technically we are into the production. By July, I am very, very hopeful. I really do not foresee any hurdles at this stage."
Bhalukona: The Discovery That Could Reshape the Portfolio
- A nickel-copper-platinum-palladium discovery: The first drill hole intersected 60 metres of combined mineralized layers with massive sulphides; seven holes have been completed, all with mineralized intersections, and management believes the deposit is open-pit mineable.
- Management is personally bullish: Hanuma Prasad called it one of his personal favourites, noting the company generated a dossier on the area as far back as 2004–2005, and described it as "one of the significant steps" that "will take the Company long way into the future."
- A mining lease application is on a war footing: The company must apply for a mining lease by October 2026; drilling and project readiness are targeted by April 2027, with a possible six-month extension.
- Production is pencilled around 2029: After the mining lease application is filed and the processing plant is designed by April 2027, construction takes roughly 1.5 years, implying production somewhere around 2029.
- The resource target is 70,000–80,000 tonnes nickel equivalent: Management anticipates proving this to a depth of 200 metres, based on drill holes showing continuity of mineralization, though these are described as "very, very broad geological numbers."
- Capital required is ₹400–500 crores: Setting up the processing plant would need this amount; concentrate would be sold to domestic smelters like Adani or Vedanta, whose license borders Deccan's.
- Beneficiation test work begins this year: Plans and designs will be developed after test work results are in; no specific date was given for completion.
Hanuma Prasad: "I firmly believe that it is one of the significant steps in terms of the Company. It will take the Company long way into the future."
The Rest of the Portfolio: Early-Stage, Underfunded
- Spain tungsten drilling is underway with results imminent: Four holes (1,500 metres) have been completed, all intersecting tungsten and tin mineralized zones; assay results are expected in the next week or 10 days. A mining lease application must be launched by October or November 2026.
- Kalevala (Finland) is stalled: No significant work was done this year as funds were focused on Kyrgyzstan and Bhalukona; drilling planned for July is unlikely until Kyrgyzstan commissioning is complete. A central processing plant concept for three projects delivering ~6–7 tons of ore is envisioned.
- Mozambique has drill targets but no drilling: Surface work for lithium and tantalum identified 4–5 pegmatite zones and drill targets are ready, but drilling has not started due to the Kyrgyzstan focus; management may contemplate drilling "very soon."
- Tanzania is down to two tenements: Three licenses were relinquished after sampling could not identify continuous zones; two tenements with encouraging values are retained, and the company plans to return for more exploration this year.
- Ganajur remains stuck in litigation: The case is in the High Court and Supreme Court; detailed hearings are expected after the court reopens. Management is coordinating strategy with Indocil and making policy-level approaches to state and central governments, including the PMO and NITI Aayog.
- If Ganajur is resolved, production is 2.5–3 years away: Based on Jonnagiri experience, approvals would take 12–15 months and construction 15 months, for a total of roughly 30 months, potentially cut by 8–9 months if environment clearance comes within six months.
Hanuma Prasad: "Hopefully, this may be the right time that the Government of India probably would recognize that there is no point in holding the already proven minds under the litigation. They may find a way. I mean, it is just a hope, but I assure you the management is fully working with both state and central governments and various other means to get to a logical end on this particular project."
Funding: Clean Balance Sheet, Large Ambitions
- The rights issue cleaned the slate: ₹315 crores was raised; ₹219 crores repaid all outstanding debt, making the company debt-free by end-March.
- But a funding deficit emerged: ₹55 crores was diverted, with shareholder permission, to participate in Geomysore's rights issue to maintain the 26% stake, leaving a shortfall for Kyrgyzstan.
- A ₹100 crores near-term raise is in final stages: The outer limit is ₹100 crores, with actual requirements around ₹60 crores for the next 2–3 years plus working capital for the next 2–3 months. Funding is being sourced from multiple lenders and investors, including key shareholders and promoter group entities.
- A much larger raise is planned: After Kyrgyzstan commissioning, Bhalukona drill results, and tungsten project results, management plans a significantly larger fund raise, with modality and structuring to be worked out "very soon." An FPO around Dhanteras (October/November 2026) was suggested by an investor and management responded "definitely we can Dhanteras."
- The 2030 vision needs ₹800–1,000 crores: Two projects (Bhalukona and Spain) require this amount; management will wait for drilling results until August before making a plan, likely a mix of equity via FPO plus debt, which should be easier with two operating mines.
- No hedging policy exists: The company has no clear hedging or risk management policy for gold price falls; it uses discounted price assumptions (₹15,000/gram for India, $4,000 for Kyrgyzstan) in estimates, arguing the discount itself provides a buffer.
- Promoters are being tapped for funding: Management confirmed talking to one of the key promoters (Australians) about both debt and preferential allotment, but declined to disclose further details.
People, Structure & Operating Model
- A core engineering team will be retained: The process engineering team that designs plants (the "brains") will be kept after Kyrgyzstan completion to design plants for Bhalukona or other projects; site engineers will be recruited into local project companies; contract workers will be released and recalled as needed.
- Key personnel are in place: Andrew Weeks (President, Mining & Exploration) leads the mining division from Bengaluru; Naushad Ahmed heads Kyrgyzstan operations with 200 people; Alexander Mikhailov (30 years experience) heads Spain and Finland; Krishna Kumar heads Mozambique.
- Kyrgyzstan is hiring: Four engineers have already been recruited and 15 more will be added in the next two months into the Kyrgyzstan company.
- Gold sales are domestic where required: Jonnagiri's refined gold (999 bars) is sold to bullion refiners and jewellers in India at IBJA price and cannot be exported; Kyrgyzstan's doré is sold to the National Bank of Kyrgyzstan.
- Geomysore value unlocking is uncertain: A reverse merger was attempted but did not happen due to valuation issues; management keeps talking about it but "cannot really guarantee when this is going to happen, or when will it ever happen." A separate Geomysore listing is a thought but no concrete decision has been taken or discussed at the board.
Hanuma Prasad: "Once Kyrgyzstan is completed, that team will start working on designing the plant for maybe Bhalukona or something else. So that team would be retained. They will not go anywhere."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Kyrgyzstan first doré bars | Generate doré bars through leasing circuit, technically into production | June 2026 |
| Kyrgyzstan full-scale commercial production | Leach circuit and tailing dam ready | End-July 2026, commercial from August 2026 |
| Kyrgyzstan resource update | Revised resource estimate to state reserve company | End-June 2026 |
| Kyrgyzstan mine design and life-of-mine plan | Revised plan submitted | August 2026 |
| Jonnagiri production | 600 kg gold | FY2027 |
| Jonnagiri production | 800 kg, possibly 1 ton | FY2028 |
| Jonnagiri resource expansion | Achieve 0.1 crore ounces (32 tons) | Next year or so |
| Bhalukona mining lease application | File formal application | October 2026 |
| Bhalukona project readiness | Drilling complete, project ready | April 2027 |
| Bhalukona production | First production | Around 2029 |
| Spain tungsten mining lease application | Launch application | October or November 2026 |
| Spain tungsten assay results | Announce to market | Next week or 10 days |
| Ganajur production (if case won) | Approvals 12–15 months + construction 15 months | 2.5–3 years from favourable ruling |
| Near-term funding | ₹100 crores (outer limit) for Kyrgyzstan, Bhalukona, tungsten, Mozambique | Next 2–3 months |
| Larger fund raise | Modality and structuring to be worked out | After Kyrgyzstan commissioning and drill results |
| Geomysore dividends | ₹120 crores PAT retained for expansion; no dividends in first year | Possibly FY2028 |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Rights issue proceeds | ₹315 cr raised |
| Debt repaid | ₹219 cr, company became debt-free by end of March |
| Jonnagiri gold produced (cumulative, by end of March) | ~100 kg of refined gold |
| Jonnagiri monthly production (March, April) | ~30 kg each month |
| Jonnagiri revenue guidance FY2027 | ~₹900 cr at 75% EBITDA, based on current prices |
| Jonnagiri PAT guidance FY2027 | ~₹470 cr, of which 26% (~₹120 cr) attributable to Deccan |
| Jonnagiri production forecast FY2027 | 600 kg |
| Jonnagiri production forecast FY2028 | 800 kg, could reach 1 ton |
| Kyrgyzstan production forecast FY2027 | ~160 kg (conservative estimate) |
| Kyrgyzstan production forecast FY2028 | 300–350 kg |
| Kyrgyzstan revenue guidance FY2027 | ~₹300 cr, PAT ~₹100 cr, Deccan share ~₹60 cr |
| Kyrgyzstan all-in sustaining cost | $1,054 per ounce, including royalty |
| Kyrgyzstan PAT margin at peak | ~45%; FY2027 roughly 30% |
| Bhalukona drilling completed | 1,200 m of diamond core drilling, 7 holes, ~1.3 km mineralized zone covered |
| Bhalukona best intercept | 2.6 m at 1.01% Ni, 0.29% Cu, 0.2 g/t Pd |
| Bhalukona overall nickel grade | ~0.4–0.5% Ni |
| Bhalukona mineralized depth proved | Up to 200 m in drill holes 2 and 3 |
| Spain tungsten project drilling | 4 holes, ~1,500 m completed; results pending |
| Spain tungsten project stake acquisition cost | €1.76 million to reach 51% |
| Funding deficit for Kyrgyzstan completion | Up to ₹100 cr outer limit; actual requirement ~₹60 cr |
| Other income breakup | ~₹19 cr interest income (~₹18.3 cr), balance from currency exchange gain |
| Gold price assumption for projections (India) | ₹15,000 per gram (discount to market) |
| Gold price assumption for projections (Kyrgyzstan) | ~$4,000 per ounce (~$500 below LBMA) |
| Jonnagiri royalty and government payments | 5.28% of top line (4% royalty + 1.28% DMF/NMET) |
| Kyrgyzstan royalty | 5% to government |
| Jonnagiri EBITDA margin | Upwards of 70–75% |
| Jonnagiri cost of production | ~₹3,000 per gram of gold produced |
| Bhalukona anticipated nickel-equivalent resource | 70,000–80,000 tonnes (per an analyst's math) |
| Bhalukona processing plant capex estimate | ₹400–500 cr |
| Jonnagiri mine life (east pit) | ~10 years, extendable to 12–15 years |
| Jonnagiri resource target | 32 tons (0.1 crore ounces) in next year or so |
| Kyrgyzstan tailings and low-grade stockpiles available | 0.16 cr tons, average grade ~1–1.1 g/t |
| Kyrgyzstan mine grades (beyond 4–5 years) | >3 g/t, production could reach 700–800 kg |