Key Takeaways
- 46% revenue growth, guidance held: Revenue rose 46% YoY on disciplined execution and a diversified order book, and management reaffirmed its 35–40% FY27 growth guidance.
- Order book target raised to ₹5,000 crore: The company expects to close FY27 with an order book of around ₹5,000 crore, up from ₹3,647 crore currently, backed by a 60%+ win rate and a ₹3,000–4,000 crore bidding pipeline.
- Margins steady, HKRP drag temporary: EBITDA margin held at 12%, within the guided 11–12% band, while the HKRP JV contributed nothing in H1; management expects both HKRP profit and the full-year margin to land by year-end.
- Geographic and capability expansion underway: Entry into Odisha via a ₹212 crore order, qualification for 765 kV substations imminent, and a New Zealand subsidiary established as a slow-and-steady international step.
- What to watch next quarter: Whether the ₹5,000 crore closing order book target stays on track, HKRP’s H2 profit contribution materialises, and the working-capital improvement claimed by management shows up in the full-year cash flow number.
Growth & Order Book
- 46% YoY top line: Revenue growth was driven by disciplined project execution and the strength of a well-diversified order book, with execution momentum picking up post-monsoon from August onward.
- Order book stands at ₹3,647 crore: 100% of it is from the parent company, with no contribution yet from the HKRP JV. Outside Gujarat’s share has inched up from ~10% to 12%.
- ₹5,000 crore closing target: Management is “very much confident” of reaching the target, planned from the start of the year, with constant bidding in line. The pipeline is ₹3,000–4,000 crore, of which ~₹1,500 crore sits outside Gujarat.
- Win rate above 60%: The company converts more than three in five bids, supporting the order book ramp.
- H1 order wins: Major wins included PGVCL (₹800–900 crore), RVPNL (132 kV GIS substation in Jodhpur with cable connectivity), and Odisha Power Transmission Corporation Limited (₹212 crore for underground cable).
- L1 status of ~₹100 crore: This will convert to the order book once utilities release the final work order allotment.
- Carried-forward projects: Several projects with a two-year timeline are planned for commissioning around September or October next year, while many others will complete before March.
Adhish Patel: “outside Gujarat, the order book is moved from around 10% to now 12%. Gradually, this will move towards, in next two years, this might move towards 15 to 20%.”
Margins & Profitability
- EBITDA margin at 12%: Reflects improved operating efficiency and effective cost management, landing within the guided 11–12% band.
- PAT up 35% YoY to ₹79 crore: Supported by high operating leverage and stable financial costs.
- HKRP JV profit lower in H1: The share of profit from HKRP was significantly lower in H1 compared to the previous half; the business is H2-heavy and targeted profit margins are expected by year-end.
- HKRP standalone target: Around ₹150 crore revenue and roughly 20% PAT margin for FY27, with contribution flowing back to Rajesh in H2.
- BESS project impact marginal: The 65 MW/130 MWh standalone BESS project at Virpur is return- and IRR-driven; given Rajesh Power’s size, the revenue and margin contribution will be very marginal.
- Full-year margin guidance maintained: Management reiterated 11–12% EBITDA margin and 8–9% PAT margin for FY27, noting they have delivered strong results despite volatility.
Adhish Patel: “11 to 12% EBITDA margin, yes, for the company, for Rajesh Power.”
Working Capital & Cash Flow
- Positive operating cash flow achieved: Driven by stronger operational performance, improved collections and disciplined working capital management, a milestone the company aims to sustain alongside planned business expansion.
- Receivables rose sharply: Trade receivables increased to ₹324 crore in September FY27 from ₹174 crore in September FY26, partly because ~₹150–200 crore of H1 revenue was booked in September alone and converted to receivables.
- Collection cycle structure: 80% of billed money is received within 45 days; the next 10% arrives when items are installed on-site; the final 10% comes at project commissioning. Current retention (on-site installation) sits in other financial assets at ₹56–58 crore, while non-current retention (commissioning) is booked separately.
- Management claims improvement: The working capital cycle is becoming more prudent with higher control on collections and more extended trade terms from suppliers; H2 is expected to show better or similar working capital management.
- Unbilled revenue: Other current assets rose from ₹39 crore to ₹71 crore, driven by unbilled revenue of roughly ₹38 crore as per Ind AS.
- Cash flow target: The company is targeting cash flow positive for the full financial year FY27.
Adhish Patel: “The working capital cycle is becoming more prudent, and we are establishing the higher control on collections.”
Geographic & Capability Expansion
- Odisha entry: A ₹212 crore EPC order from Odisha Power Transmission Corporation Limited in June 2026 marked the company’s entry into Eastern India. The Odisha government has since announced over ₹16,000 crore of investment in 765 kV, 400 kV and 220 kV substations, underground cable projects and transmission lines.
- 765 kV qualification imminent: The company will qualify to bid for 765 kV voltage level substations after commissioning its 400 kV project in a couple of months; entry is targeted very soon, though not immediately this year.
- 765 kV economics: Very few players execute at this capability level, so the opportunity size is increasing while the number of capable players is shrinking; management expects higher revenues from that segment.
- New Zealand subsidiary: A 100% wholly owned subsidiary has been established following a team visit, feasibility study and advanced-stage discussions for two or three opportunities; no specific investment number yet.
- Outside Gujarat trajectory: The ex-Gujarat order book share is expected to move toward 15–20% in the next two years, with Odisha seen as the next lever beyond Gujarat for power and distribution.
- Data centre opportunity: The company is targeting data centre firms as a partner to bring power from the grid to their premises, driven by a data centre boom in Gujarat and Maharashtra; currently in pilot phase with no number target yet.
Utsav Panchal: “We will very soon be qualified to bid for 765 kV voltage level substations after we'll be commissioning the 400 kV project in a couple of months.”
HKRP & Technology Bets
- HKRP integration deepening: The strategic investment in HKRP Innovations Limited strengthens capabilities in smart grid monitoring, automation and digital energy management solutions, moving the company beyond electrical infrastructure execution to intelligent energy infrastructure.
- Three SCADA/DMS projects under execution: Across all three Gujarat DISCOMs (UGVCL, DGVCL, PGVCL), covering entire SCADA and distribution management system projects along with greenfield command and control centres.
- Pan-India SCADA/DMS opportunity: Total opportunity size exceeds ₹3,000 crore; states currently tendering include Maharashtra, Assam, Kerala, UP, Bihar and Uttarakhand.
- HKRP transaction limit raised: A higher limit of ₹500 crore for purchase of goods from HKRP Innovations was taken to avoid repeated AGM approvals for new project wins.
- BESS as infrastructure layer: The 65 MW/130 MWh standalone BESS project at Virpur represents entry into utility-scale battery storage; management views BESS as an essential infrastructure layer on its own, not merely an extension of renewables.
- BESS EPC focus: The company is targeting BESS EPC projects only, not as a developer, with around ₹200–300 crore of EPC projects in the pipeline.
Utsav Panchal: “We are moving beyond electrical infrastructure execution company to building capabilities in the intelligent energy infrastructure.”
Demand Environment
- Gujarat distribution tendering strong: Yearly tendering momentum in Gujarat’s distribution segment exceeds ₹5,000–6,000 crore, and the company is well placed to deliver.
- GEC-III opportunity: Expected to create a significant pipeline in intrastate transmission, grid strengthening and renewable power evacuation, aligning with the company’s T&D, substation, underground cabling and energy storage capabilities.
- Gujarat Wire-Free City Mission: Particularly relevant given the company’s experience in underground cabling, medium-voltage covered conductor networks, RMUs, distribution transformers and turnkey distribution EPC.
- Execution timelines: PGVCL projects carry an 18–24 month execution window; the unexecuted order book of ~₹3,600 crore plus ~₹400 crore is to be executed within 18–24 months, with some projects completing before March and others by September or October of the next year.
- No distribution work outside Gujarat yet: The current order book and active bidding contain no distribution work outside Gujarat; Odisha and other geographies are transmission-focused for now.
Utsav Panchal: “The next phase of India's power transmission and power infrastructure expansion will not be defined by generation capacity alone. It will increasingly be defined by how effectively we can transmit power, distribute it, store it and manage it.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue growth | 35–40% YoY (also the longer-term guide for next 4–5 years) | FY27 and beyond |
| EBITDA margin | 11–12% | FY27 |
| PAT margin | 8–9% | FY27 |
| Closing order book | Around ₹5,000 crore | FY27 end |
| HKRP standalone revenue | Around ₹150 crore at 20% PAT margin | FY27 end |
| Operating cash flow | Positive for the full year | FY27 |
| 765 kV qualification | Qualified to bid after commissioning 400 kV project | In a couple of months |
| Ex-Gujarat order book share | Move toward 15–20% | Next two years |
| BESS EPC pipeline | ₹200–300 crore of EPC projects | Not dated |
Key Metrics
| Metric | H1 FY27 |
|---|---|
| Revenue | ₹929 cr, +46% YoY |
| EBITDA | ₹112 cr, +33% YoY |
| EBITDA margin | 12%, reflecting improved operating efficiency and cost management |
| PAT | ₹79 cr, +35% YoY |
| PAT margin | 8.5%, supported by operating leverage and stable financial costs |
| Net worth | ₹484 cr, grew more than 8x from ₹59 cr in FY23 |
| Fresh order inflows | ₹1,250 cr during H1FY27 |
| Unexecuted order book | ₹3,647 cr as of 30 Sep 2026 |
| Additional order inflows (Oct 2026) | ₹450 cr |
| Current bid pipeline | ₹3,500–4,000 cr |
| Current L1 status | ~₹100 cr |
| Ring main units installed (H1) | 2,700+, cumulative >17,000 units |
| Distribution transformers installed (H1) | 300+, cumulative >6,500 units |
| LT, HT and 11 kV cables laid (H1) | 905 km, cumulative 11,400 km |
| Medium-voltage covered conductor laid (H1) | 10,800 km, cumulative ~35,000 km; ~25,000 km under execution [6–7] |
| Air-insulated substations commissioned (H1) | 4, cumulative 104 substations |
| Extra-high-voltage cables laid (H1) | 157 km, cumulative >2,700 km |
| Poles erected (H1) | 12,000 |
| FY27 revenue growth guidance | 35–40%, maintained |
| FY27 EBITDA margin guidance | 11–12%, maintained |
| FY27 PAT margin guidance | 8–9%, maintained |
| FY27 closing order book target | ~₹5,000 cr |
| HKRP standalone revenue target (FY27) | ~₹150 cr |
| HKRP standalone PAT margin target (FY27) | ~20% |
| BESS EPC bidding pipeline | ₹200–300 cr |
| Ex-Gujarat bidding pipeline | ~₹1,500 cr |
| Win rate | 50–60% across all geographies and business segments |
| Outside Gujarat order book share | 12%, up from ~10%; expected to reach 15–20% in two years |