Key Takeaways
- Revenue up 22% YoY, but margins compressed: Sales reached ₹32.57 crores on higher cement volumes and a 245% surge in solar revenue, yet EBITDA margin fell from the 33–35% range to ~27% as fuel costs nearly 2.5x'd.
- A transformative CAPEX cycle is imminent: A ~₹110 crore plant optimization, promising to triple capacity at roughly one-fourth the industry's per-tonne capital cost, is in the final stage of feasibility study and could break ground within two quarters.
- Solar is now a material, two-plant business: The new 12 MWp plant stabilized and drove a 250% YoY jump in solar revenue, though QoQ profitability swung sharply because the segment is seasonal and management withholds power when pricing is weak.
- The fuel shock forced a complete shift to pet coke: Coal is now under 5% of the fuel mix, but the absolute cost per kilo calorie of pet coke still doubled YoY; management sees early signs of rationalization from August onward.
- What to watch next quarter: Whether the fuel cost relaxation materializes into margin recovery, finalization of the CAPEX plan and its financing mix, and the pace of the capacity utilization climb toward the 80% target.
The Expansion Bet
- Project scope: The plan is to optimize the existing kiln to produce 10–20% more and higher-quality clinker, raise additive content (slag, fly ash) from 30% to 50–60%, and lift total grinding capacity to 2,800–2,900 tonnes per day, nearly tripling output.
- Capital efficiency advantage: Project cost is pegged at ~₹110 crores, implying a capital cost of roughly ₹2,000 per metric tonne versus the industry norm of ₹8,000–9,000, because the company is optimizing an existing plant rather than building from scratch.
- Timeline: Earliest two quarters, latest three quarters, with a maximum of nine months from first digging to first bag; the technical feasibility study is almost at the verge of completion and finalization is expected within a month or two.
- Financial ambition: Incremental EBITDA from the expansion is targeted at ₹50–60 crores, driven by 20–25% fuel quantity savings and 20% power savings; total cement EBITDA post-CAPEX at 80% utilization is targeted at nearly ₹90–100 crores.
- Financing is undecided: Options include promoter equity via unsecured loans, private placement, bank debt, or a mix; the decision will follow finalization of feasibility and project cost, leaving the funding structure as an open question for investors.
- Post-CAPEX product strategy: Once the expansion stabilizes, management intends to explore ready-mix concrete, cement boards and panels, and 2D/3D construction, with the goal of utilizing the entire cement output to create products that carry better margins and lower taxes.
Management: "So, 100 crores is almost you can say what Rs.2000 per capital cost is much lesser compared to about Rs.8000 per metric tonne what is being established for cement plants."
Fuel Cost & Margin Mechanics
- The shock: Fuel costs increased by almost 2.5x due to the Ukraine war energy crisis, compressing EBITDA margin from the historical 33–35% band to ~27% in Q1 FY23.
- The shift: The company moved almost entirely from Southern African coal to pet coke; coal is now used only for initial kiln firing and constitutes less than 5% of the fuel mix.
- Why the shift wasn't enough: While pet coke was cheaper than coal on a per-kilo-calorie basis, its absolute cost still rose sharply: from ₹1.10 to ₹2.35 YoY for pet coke, and from ₹1.70 to ₹2.00 for coal. Raw material costs consequently rose from ₹15 crore to ₹20 crore QoQ.
- Recovery thesis: Management sees signs of fuel price rationalization from August onward as the Ukraine war impact slows, and hopes to return to similar EBITDA margins as in the past once fuel prices decline.
Katwa: "Based on that there were some impact on the company due to cost of fuel due to which the EBITDA margin which we consistently posted between 33% to 35% came down to around 27%. And this, we hope will not continue as we see that the fuel cost is already showing the signs of relaxation."
Solar Power: A Seasonal Second Engine
- Two-plant setup: The first solar plant sells power entirely to private parties at market prices without a government PPA; the second plant (10 MW AC / 12 MW peak DC), commissioned in December 2021, is used for captive consumption and has stabilized as per plan.
- YoY surge, QoQ swing: Solar revenue jumped 250% YoY to ₹5.67 crores in Q1 FY23 from ₹1.61 crores, but dropped sharply from Q4 FY22's ₹7.15 crores, while segment profitability fell from ₹5.80 crores to ₹1.50 crores over the same period.
- Seasonality is structural: Q4 typically sees higher sales and better pricing as industries rush to meet renewable power obligations; management holds excess power in closing stock if pricing is unfavorable and sells more in Q4, making H2 the stronger half.
- Demand strength: Demand for solar power is high enough that the company rations supply to customers to secure the best monthly price.
- Post-expansion synergy: After the cement CAPEX, power consumption per unit will decline because new equipment is low-power-consuming; even though capacity nearly triples, power requirement will be less than two times, freeing surplus power for external sale.
Cement Demand & Pricing
- Volume and price: Q1 FY23 cement volumes grew 7% QoQ, while net average realized price rose marginally by ~2% QoQ to ₹4,015 per tonne.
- Pricing outlook: Management expects a significant price increase from Q3 onwards, arguing that most cement plants have not yet responded to higher coal prices due to a subdued market, and that price rises typically occur in Q3 and Q4.
- Demand tailwind: Robust government infrastructure development initiatives are expected to sustain cement demand; India remains among the lowest per capita cement consumers, trailing Sri Lanka, Bangladesh and Nepal, and the Cement Research Institute expects 11–14% CAGR from 2023 to 2030.
- Geographic focus: The company exited the Kerala market this quarter due to high logistic costs and reduced coastal market presence; the strategy is to sell within a 200 km radius for better realization, while expanding into government-related contracts and deeper into villages.
- Customer concentration: Dependence on top customers is being reduced as the company broadens its reach; management did not directly address a question on the certainty of long-term orders from those top clients.
Management: "I feel cement is the only product which is not replaceable right now, and will continue to grow."
Competitive Moat & Location
- Limestone scarcity as a barrier: There are no major limestone deposits in the company's operating region, which deters large-capacity players seeking deposits large enough to support 2-3 crore tonnes of capacity; the location advantage is structural and durable.
- Freight advantage: Most sales are on an ex-works or ex-tile basis, with logistics costs largely borne by dealers, keeping the company's own logistics costs minimal and supporting better net realizations within the target radius.
Management: "So that location advantage no one is going to take away from us."
Balance Sheet & Utilization
- Capacity utilization climbing: Utilization improved from 63% in FY22 to 68% in Q1 FY23, with a target to reach the industry average of 80% in the next three to four quarters.
- Debt trajectory: Long-term borrowings increased primarily due to the high capital cost of the solar plant, but solar EBITDA covers the associated debt by two to three times; long-term debt is expected to decline quarter-on-quarter and year-on-year, with repayment funded entirely from internal profit generation.
- Depreciation step-up: Depreciation and amortization rose to ₹3.18 crores in Q1 FY23, reflecting the capitalization of the new ₹45 crore solar power plant, which began depreciating this quarter.
- PAT support from deferred tax: Profitability achieved last year allowed deferred tax assets to contribute to PAT, significantly improving debt-equity and current ratios.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Cement capacity utilization | Reach 80% (up from 68% in Q1 FY23) | Next 3–4 quarters |
| Cement CAPEX finalization | Technical feasibility study completion and project cost finalization | ~1–2 months |
| Cement CAPEX execution | First digging to first bag; capacity nearly triples | Max 9 months from start; earliest start in 2 quarters |
| Cement CAPEX EBITDA contribution | Incremental ₹50–60 cr from expansion; total cement EBITDA target ₹90–100 cr at 80% utilization | Post-CAPEX stabilization |
| EBITDA margin recovery | Return to historical 33–35% range | Conditional on fuel price decline; signs of rationalization seen from August |
| Cement pricing increase | Significant price rise expected | Q3 FY23 onwards |
| Long-term debt reduction | Decline quarter-on-quarter and year-on-year | Ongoing; funded from internal accruals |
| Value-added product entry | Explore RMC, cement boards, panels, 2D/3D construction | After CAPEX completion and stabilization |
Key Metrics
| Metric | Q1 FY23 |
|---|---|
| Revenue | ₹32.57 cr, up 21% YoY |
| EBITDA | ₹9.37 cr |
| EBITDA margin | ~27%, down from 33–35% historically, due to fuel costs |
| Profit before tax | ₹2.96 cr, up nearly 21% YoY |
| Profit after tax | ₹26 cr, compared to ₹5.19 cr in Q1 FY22; includes deferred tax asset benefit |
| Cement sales volume | 61,000 metric tonnes |
| Cement average selling price | ₹4,115 per metric tonne, up nearly 2% YoY |
| Cement capacity utilization | 68%, up from 63% in FY22 |
| Solar power revenue | ₹5.67 cr, up 245% YoY from ₹1.61 cr in Q1 FY22 |
| Solar power average realization | ~₹6.70 per unit, up from ₹6.10 per unit in FY22 |
| Depreciation and amortization | ₹3.18 cr, reflecting capitalization of ₹45 cr solar plant |
| Total outstanding liabilities | ~₹165 cr |
| Short-term debt (outside liabilities) | ~₹24 cr; net of cash balances, current liabilities ~₹18–19 cr |
| Cement expansion CAPEX (planned) | ~₹110–120 cr, targeting additional EBITDA of ₹50–60 cr; timeline ~3 quarters from first dig |