Key Takeaways
- Revenue surged 60% but margins compressed: Total income hit ₹368 crores, yet gross margin fell to ~30% from 34.5% as the deliberate pivot to lower-margin ground-mounted EPC took hold.
- Manufacturing is now live and the integration story begins: The 1.2 GW module facility was commissioned in March, with a target of 50–60% captive consumption to lift blended margins back above 15%.
- The order book provides near-term visibility: A 303 MW confirmed order book, nearly all executable in FY27, plus a 300 MW pipeline under active discussion that management hopes to 60% convert within 2–3 months.
- Finance costs spiked on the manufacturing setup: Interest expense tripled to ₹10.5 crores, driven by ~₹100 crores of working capital and a ₹50 crore term loan for the new line; absolute cost stays in this range before declining as a percentage of revenue.
- What to watch next quarter: Conversion of the 300 MW pipeline into booked orders, the pace of captive module offtake from the new line, and whether gross margins begin to inch up from the ~30% floor.
The EPC Mix Shift: Scale Over Margin
- Revenue exploded on large ground-mounted projects: C&I and ground-mounted revenue jumped to ₹227 crores from ₹114 crores, driving the 60% top-line growth. H2 FY26 alone delivered ₹251 crores, up 70% YoY.
- Gross margin compressed by design: The shift toward ground-mounted EPC, which carries structurally lower margins than distributed residential or kit sales, pulled gross margin down to ~30% from 34.5%. Absolute gross profit still grew 40% YoY to ₹111 crores.
- The trade-off is better cash conversion: Large EPC contracts give management better control over receivables cycles compared to government distributed programs, where extended collection periods were a drag. For a ₹150 crore project, working capital requirement stays under ₹30–35 crores.
- Concentration is a feature, not a bug: Executing 200–250 dispersed sites for NTPC last year taught management that non-concentrated sites multiply decision-makers and timeline risk. Concentrated sites mean a smaller stakeholder group to convince and move through execution.
Ankit Garg: "The working capital dynamics of large EPC contracts while carrying somewhat lower gross margins give us better control over cash conversion and allow us to operate at meaningful larger scale."
Manufacturing Integration: The Margin Recovery Engine
- 1.2 GW module line commissioned in Ahmedabad: Fully automated, capable of 4,000 panels per day at up to 23.5% cell efficiency, including G12 panels up to 725 Wp. AI-powered quality control and RFID traceability are installed. Production began mid-March, with initial output routed to distribution sales.
- Captive consumption is the margin thesis: Management targets 50–60% of production consumed in-house, split across own EPC projects (40–50%) and the solar kit business. A confirmed 65 MW of captive offtake already sits inside the EPC order book.
- Manufacturing margins targeted above 15%: On a cost-plus basis, the company expects overall margins from the manufacturing segment to stack up at a bare minimum of 15%, which would pull the blended corporate margin upward as volumes ramp.
- ALMM-II creates a temporary cell-sourcing gap: A significant portion of the current order book relates to projects bid before August 31, 2025, where non-domestic cells remain permissible. The company is at an advanced stage of securing domestically manufactured cells for residential EPC and kits, and expects enough Indian cell capacity to be installed within 6–8 months to stabilize supply.
- Utilization sits at 45% today: The rate was reduced in the last 10 days of the quarter as ALMM-II applicability kicked in and the company assessed market response. Ramp-up depends on pipeline conversion and kit expansion.
Himanshu Garg: "It is a bit tricky situation at this point in time. But given we generally operate at a cost-plus model, so we target at gross margins or rather the overall margins to be above 15%."
Order Book & Pipeline: Visibility and Conversion Risk
- 303 MW confirmed order book, nearly all executable in FY27: Management stated almost 100% of the book will be executed within the year, though declined to split it between H1 and H2, calling that bifurcation difficult.
- 300 MW-plus pipeline under active discussion: The company is hopeful that at least 60% will convert within the next 2–3 months, with ground-mounted conversion expected over 3–6 months. No specific conversion rate was given: one 100 MW order swinging either way makes a single-point estimate meaningless.
- A ₹185 crore, 50 MW AC ground-mounted project in Maharashtra was secured during the quarter, adding ballast to the EPC backlog.
- PM Surya Ghar Scheme provides a demand floor: Solarium holds the second-largest vendor position among 20,000-plus empaneled players under the scheme, which carries a stated government ambition of 1 crore households by 2027.
Residential & Solar Kits: A Lower-Fixed-Cost Pivot
- Operational challenges forced a strategy reset: Scaling end-to-end residential installations proved difficult, so the company launched branded solar kits that shift more scope to Sarathi partners and reduce dependency on fixed cost.
- Kits target 20,000 empaneled EPC vendors under PM Surya Ghar: Each kit bundles modules, ACDB, DCDBs and 20–25 components customized per customer. Solarium acts as the single point of supply, leveraging its distribution capabilities and local market knowledge. Expansion into multiple additional states is planned very soon.
- Sarathi partner network now spans 450-plus partners across 25-plus cities, forming the last-mile backbone for kit distribution and installation support.
- Monthly kit run-rate ambition: Management expects the combined solar kit business to reach a ₹16–18 crore monthly run rate by the end of the calendar year.
Ankit Garg: "So, in our kit business, wherein we have already set up our distributional capabilities, we know the consumer, we know the local EPC player, there are more than 20,000 empaneled EPC players who are working into this sector... with the launch of kits, we will be able to cater that 20,000 EPC empaneled vendors under PM Surya Ghar Yojana, wherein we will be their single point of supply."
Profitability & Balance Sheet: The Cost of Scaling
- EBITDA grew 31% to ₹35.3 crores, margin at 9.6%: The three-year EBITDA CAGR stands at 82% since FY23. Management expects EBITDA margins to settle in a 10–12% range going forward, with no further fall anticipated as the model shifts toward lower fixed costs.
- Finance costs tripled to ₹10.5 crores: The jump reflects borrowing for the module manufacturing facility: ~₹100 crores of working capital plus a ₹50 crore term loan repayable over six years. In absolute terms, interest cost will remain in the same range or marginally increase; as a percentage of revenue, it will decline as operations ramp.
- Trade receivables swelled to ₹152.6 crores from ₹90.9 crores, a direct consequence of the EPC-heavy revenue mix and associated working capital build-up. Management says it remains attentive to working capital discipline as the order book scales.
- Other current liabilities rose from ₹4 crores to ₹36 crores, driven by ₹19 crores in creditors for fixed assets (CAPEX not in trade payables), ₹2 crores in employee payables, and ₹5.5 crores in customer advances.
- No major CAPEX planned for FY27: The investment cycle is largely complete; focus now shifts to execution and ramp-up of the manufacturing asset.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Order book execution | Almost 100% of 303 MW executed | Within FY27 |
| Pipeline conversion | Hopeful of at least 60% conversion of 300 MW-plus pipeline | Next 2–3 months |
| EBITDA margin range | 10–12% | FY27, with exit at that level confirmed |
| Manufacturing utilization | Ramp from current 45%; 50–60% captive consumption target | No date; tied to pipeline conversion and kit expansion |
| Solar kit monthly run rate | ₹16–18 crores | By end of calendar year |
| Manufacturing margins | Bare minimum 15% overall margins on cost-plus basis | As volumes ramp (no date) |
| Interest cost | Absolute ₹ terms remain in same range or marginally higher; decline as % of revenue | As operations ramp |
| CAPEX | No major CAPEX foreseen | FY27 |
| Cell supply stabilization | Enough domestic cell capacity expected to be installed | Next 6–8 months |
| BESS entry | Enter as EPC player into larger BESS integration | Once ground-mount standalone operations stabilize |
Key Metrics
| Metric | FY26 |
|---|---|
| Total income | ₹368 cr, +60% YoY |
| Revenue CAGR (3-year) | 55% since FY23 |
| Gross margin | ~30%, vs 34.5% in FY25 |
| EBITDA | ₹35.3 cr, +31% YoY |
| EBITDA margin | ~9.6% on total income |
| EBITDA CAGR (3-year) | 82% since FY23 |
| PAT | ₹20.5 cr, marginally above ₹18.6 cr in FY25 |
| PAT margin | ~5.6% of total income |
| Finance cost | ₹10.5 cr, vs ₹3.5 cr in FY25 |
| Executed order book | >₹300 cr |
| EPC forward pipeline | >300 MW under active discussion |
| Manufacturing utilization | ~45% (current) |
| Residential monthly run rate | ₹10–12 cr (last 3–4 months), excluding solar kit |
| Sarathi partner network | >450 partners across >25 cities |
| Trade receivables | ₹152.6 cr, up from ₹90.9 cr in FY25 |
| Total assets | ₹459 cr, up from ₹234 cr in FY25 |