Key Takeaways
- Revenue doubled on product mix shift: Sales jumped to ₹237 crores in FY26 as the company deliberately pivoted toward higher-value, higher-margin products like CT PT, busducts, and meter cubicles, while legacy SMC/FRP declined on geopolitical disruption.
- Margins hit a sustainable 15% floor: EBITDA margin reached 15%, driven by the ability to now choose orders based on margin rather than chasing volume; management calls this level sustainable and aims to push higher.
- The order book is deliberately short: To protect profits from raw material volatility, management is taking orders of ₹20-50 crores with 2-3 month durations instead of bulk annual contracts, passing through price escalations on every cycle.
- Railways clearance is the nearest catalyst: Vande Bharat part approvals are expected by end of June 2026, with the expanded in-house lab completing within days; this unlocks a multi-year growth vector management expects to contribute meaningfully within three years.
- What to watch next quarter: Whether Railways clearance actually arrives by June, the pace of export order conversion following the Dubai electrical fair in September, and whether the revised H1 FY27 target of ₹200 crores plus holds against ongoing geopolitical headwinds.
Product Mix Transformation
- The deliberate shift upward: Revenue doubled because the company added CT PT, bus ducts, panels, and meter cubicles, products that carry much better EBITDA margins than the legacy SMC boxes. The combined service offering, supplying an SMC box plus these parallel products, improved customer satisfaction and pulled through revenue growth even as SMC/FRP orders weakened.
- SMC/FRP hit by geopolitics, not demand: SMC revenue fell from ₹90 cr to ₹64 cr because resin and petroleum-based raw materials became unavailable during March, precisely when government orders typically close. The decline was supply-side, not a loss of market.
- CT PT is the margin engine: Margins on CT PT are structurally higher because it is an engineering product, though they vary by order based on kV rating and installation specs. Standardized products target above 18% EBITDA. The company operates in 11 kV and 33 kV, with few approved competitors, and plans to gradually move up to 66, 120, and 240 kV.
- Meter cubicles gaining traction: Performance in meter cubicles has been very strong since the last month of the quarter; management plans to add more such products for the switchgear and electrical industry.
- Inventory build is deliberate, not a warning: Inventory jumped to ₹85 crores (~100 days) because management stocked three months of raw materials anticipating worsening geopolitical disruption. Raw materials are being consumed according to plan.
Neel Shah: "Initially, we wanted to capture the market, so we sometimes took business at lower margins. Now, we are in a driving position in the market. We choose orders based on our margins and then supply them."
Order Book & Pricing Strategy
- Short-duration orders as a shield: Instead of taking bulk orders of ₹200-300 crores at once, the company now takes orders of ₹20-50 crores to serve over two months. This allows price escalation pass-through at each re-order, protecting profit margins from raw material fluctuations driven by the geopolitical situation.
- Pricing power is evident: The company was earlier selling at ₹350-360 per unit and is now selling at ₹450; customers are ready to buy at these rates. Management's focus is on delivering on time while maintaining quality and margins, not just accumulating orders.
- Order book composition: The current order book includes ₹120-plus crores for CT PT, bus ducts, and meter cubicles, approximately ₹80 crores for SMC, with the remainder in FRP and tarpaulin. The target is to first supply and complete an order book around ₹450-500 crores.
- Execution over accumulation: Management is taking clearance for current orders and increasing prices to supply materials, explicitly stating they do not want to give an impact on profit and revenue.
Neel Shah: "Instead of taking a bulk order of INR200 crores to INR300 crores at once, we are taking orders of INR20 crores, INR25 crores, or INR50 crores to serve over the next two months."
Railways & New Growth Vectors
- Railways clearance imminent: Approvals for Vande Bharat parts are almost complete; samples and products were submitted but delayed due to technical issues. Clearance is expected by end of June 2026. The lab expansion, part of the IPO plan, will be completed within 4-5 days from the call date.
- Three-year railways ambition: Trial orders will slowly get bigger. Management expects a good jump next year and, within three years, wants railways to provide a meaningful part of revenue as the company targets becoming a ₹1,000-plus turnover company.
- Export push beginning: The first export experience has been in Oman and Gulf countries. Samples have been sent to the US and Germany. From September onwards, the company is participating in the Dubai electrical fair and visiting other countries, targeting Gulf, Africa, Europe, and the US. UL 94 certification is required for the US; ASTM and NEMA compliance is already followed in the FRP division.
- System houses and hand molds: The company is creating its own system houses with approvals in many labs, expected in two to three months. Hand molds for industrial vehicles are also under development, with trial orders already taken in many places.
- 2000-ton press machine: The machine should arrive in the next 2-3 months and will be used for large railway products and samples sent to Germany and the US; dyes will be developed based on approvals received.
Neel Shah: "Next year we will make a good jump in railways and beyond that, maximum in three years we want to become a 1,000-plus company. Whose turnover is 1,000-plus, in which railways will also be providing a good part."
Margins & Raw Material Management
- 15% is the new floor: Management states the 15% EBITDA margin is sustainable and they want to work at this minimum level, targeting even better margins due to buying power and market position. The improvement came from choosing higher-value orders rather than taking low-margin business to capture market share.
- Raw material pass-through mechanics: For copper and steel, costs are passed on based on the situation at the time of supply. For resin, a hit was taken on fluctuations last March, but now shorter-duration orders are taken at new rates, preventing recurrence.
- Resin remains the vulnerability: Problems exist only with resins and petroleum products; all other products are being received on time. CRGO cores are externally sourced from Korea, China, Japan, and Taiwan with no current import issues.
- PAT margin outlook cautious: Management will maintain the current PAT margin in FY27; if it can improve by 1-2% that would be good, but given geopolitics, maintaining the current level looks like the better situation.
Neel Shah: "In FY27, we will maintain this. If it can be better, then actually the situation is such that we wanted to do better than this by 1% to 2%. But due to geopolitics, if we work by maintaining this, it looks like a better situation."
Capacity, Capex & Working Capital
- Capacity expansion underway: SMC capacity will increase to 6,000 tons plus; the FRP unit will add 300 tons of production; busducts, CT PT, and panels businesses will grow accordingly. The second plant in Nashik has already started and products are being readied.
- IPO capex is the first priority: The first target is deploying the ₹25 crores IPO capex for machines and facilities. Future planning depends on the vision ahead; new product launches are planned every six months.
- Working capital cycle stable: A 40-45 day working capital cycle is sustainable per government and MSME rules; the cycle will either improve or stay at that level. No additional working capital funding is required this year if the cycle is maintained, with IPO cash funds available. Assessment will be done after September's six-month results.
- Geographic concentration: Maharashtra, Gujarat, and Karnataka are the three main states for sales.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Railways clearance | Vande Bharat part approvals expected | End of June 2026 |
| FY27 revenue | ₹450 crores plus | FY27 |
| H1 FY27 revenue | ₹200 crores plus (revised down from ₹250 crores plus) | H1 FY27 |
| Order book completion | Current order book of ₹450-500 crores to be supplied | Within first 6 months |
| EBITDA margin | 15% minimum, targeting above | FY27 |
| PAT margin | Maintain current level; 1-2% improvement if conditions allow | FY27 |
| Three-year revenue ambition | ₹1,000-plus crores turnover | Approximately FY28-FY29 |
| Lab expansion completion | Part of IPO plan | Within 4-5 days from call date |
| 2000-ton press machine | Installation for railway products and export samples | Next 2-3 months |
| System houses | Indo system house products with lab approvals | Two to three months |
| Export push | Participation in Dubai electrical fair; samples sent to US and Germany | September 2026 onwards |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Revenue | ₹222 cr (CTPT segment), SMC declined to ₹64 cr from ₹90 cr |
| Full-year EBITDA margin | Close to 15%, up from ~11% in H2 FY25 |
| PAT | More than doubled YoY for FY26 |
| Order book (as of Mar 31) | ₹237 cr |
| Fresh orders (Apr 1–May 22) | ₹125 cr |
| FY27 revenue target | ₹450 cr to ₹500 cr |
| FY27 EBITDA margin target | Above 15%, with standardized products above 18% |
| Working capital cycle | 40 days, improved from 83 days |
| Inventory | ₹85 cr, representing ~100 days |
| SMC capacity target | 6,000 tons plus |
| FRP additional production target | 300 tons |
| Planned capex (IPO) | ₹25 cr |
| Three-year revenue target | ₹1,000 cr plus |
| H1 FY27 revenue target | ₹200 cr plus, revised from ₹250 cr plus |
| Revenue potential from full-fledged capex | Above ₹750 cr |