Shri Keshav Cements & Infra Ltd Q1 FY2024 Concall Summary

Source transcript PDF: https://assets.stockscans.in/docs/fgogt6h6np0t544lzi15enad.pdf

Key Takeaways


The Cement Problem: An Obsolete Kiln

Venkatesh H. Katwa: "Industry is giving almost Rs.1,000 EBITDA per metric ton, but we are struggling with less than Rs.100 EBITDA per metric ton. The only reason we are making a healthy EBITDA of the balance sheet is because of solar generation and sale of solars."

The Expansion: What Gets Built and When


Margins: The Fuel Switch and What Comes Next

Margin driverDetail
Fuel switch to petcoke100% petroleum coke since June/July 2022, replacing higher-cost coal; this drove the ~440 bps EBITDA margin expansion to 32.36%.
FIFO tailwind still to comeFuel consumed in Q1 was purchased in October-November at higher prices; as lower-cost inventory flows through, margins should continue improving even without further price declines.
Power cost trajectorySolar power currently costs ~Rs.1.80/unit, of which Rs.1.60 is interest cost on the solar plant debt. As that debt repays over 3-4 years, power cost is expected to fall below 25-30 paise/unit.
Management’s margin ambitionTargeting 40-42% EBITDA margin (from 32%) based on current cement realizations and raw material costs, and expects to "significantly improve" margins by 20-25%.
Venkatesh H. Katwa: "Yes, it is likely to be sustainable because even these EBITDA margins we are able to get it with the fairly high cost of fuel, because the fuel consumed in this Q1 based on FIFO method comes from when we have purchased fuel in October and November. So, with the reduction in fuel prices, we're expecting to continue or even better the EBITDA margins."

Demand and Utilization


Market and Brand Strategy Post-Expansion

Venkatesh H. Katwa: "Even with the new capacity, Pune and Bangalore could be in the range of our supply zone. However, cement is a product with very low value to weight ratio, which means that logistic cost do weigh down on the product."

Balance Sheet and Credit Quality


Guidance & Commitments

CommitmentSpecificsTimeline
New kiln commissioning0.1 crore ton capacity addition; kiln as final phaseJune 30, 2024 ("Q2 of 2024")
Capacity utilizationReach at least 70-75%"Coming quarters"
EBITDA marginReach 40-42% (from 32.36%)No date; based on current realizations and input costs
Power cost reductionFall below 25-30 paise/unit (from Rs.1.80) as solar debt repays3-4 years
Dealer networkExpand from 600 to 800-1,000 dealersPost-expansion
Market shareIncrease by at least 2.5xNo date
Credit rating improvement50 bps interest cost reduction on all loans if achievedConditional on improved ratios
Plant shutdown for CAPEX tie-in20-25 day old kiln shutdown; sales unaffected via pre-built stockDuring commissioning phase

Key Metrics

MetricQ1 FY24
Total income₹31.74 cr
EBITDA₹10.27 cr, +10% YoY
EBITDA margin32.36%, +440 bps YoY
Net profit₹2.68 cr
Net profit margin8.42%
Cement division revenue₹23.31 cr
Solar division revenue₹6.03 cr
Cement sales volume55,981 tons, ~62% capacity utilization
Cement production volume~56,300 tons
Solar capacity utilization>99%
Total debt on books₹165 cr, down from ₹180 cr in Q4 FY23
Outside debt to banks₹140 cr
Debt-to-equity ratio<2.5, down from <6–7 in FY23 and >9 in FY22
Average cost of existing debt~9.85%
New Canara Bank loan sanctioned₹80 cr at 9.5% interest, for capacity expansion
Retail touch points600 dealers
Sales team size~18 people
Quarterly marketing budget<₹25 lakhs