Key Takeaways
- Revenue exploded, margins halved: H1 FY27 revenue of ₹310 Cr already exceeded all of FY25, but gross margin compressed from 44% to 21.6% as the mix tilted toward lower-margin Large EPC and module sales.
- The factory sat idle, then sprinted: The 1.23 GW plant carried six months of fixed costs against only ~2.5 months of manufacturing revenue because ALMM enlistment arrived only in July 2026; by September utilization hit 75–80%.
- Order book swelled on two mega wins: The order book jumped from ~₹300 Cr to ₹720.9 Cr, driven by two 50 MW AC ground-mount contracts from Mahagenco worth a combined ₹375 Cr.
- Residential strategy pivoted hard: Management cut the monthly residential run rate from ₹10–12 Cr to ₹4–5 Cr, unwilling to burn cash on warehouse-heavy execution; Solar Kits and a Gujarat zero-cost model are the new bet.
- What to watch next quarter: Whether the promised H2 margin recovery to 9–10% EBITDA materializes as plant utilization rises, whether receivables of ₹281.9 Cr actually come down, and whether the Gujarat residential push delivers the "multiple excess" growth management hinted at.
The Mix Shift That Reshaped the P&L
- Revenue mix drove the margin story: Large EPC and module sales, which carry lower gross margins than residential installations, dominated H1 revenue; pricing discipline within each segment did not change, so the margin compression is entirely a mix effect.
- EBITDA margin landed at 8.3%: Management attributes roughly ₹4.5–5 Cr of the shortfall to unabsorbed plant fixed costs during the three months the factory was idle pre-ALMM; had those volumes been produced and sold, EBITDA would have been in the 9.5–10% range.
- Operating leverage showed up elsewhere: Employee and other expenses together rose only 17% against revenue growth of 165%, confirming that the cost structure scales more slowly than the top line.
- Finance and depreciation costs jumped: Finance cost rose to ₹8.3 Cr from ₹4.4 Cr on the plant term loan and EPC working capital; depreciation rose to ₹3.4 Cr from ₹0.5 Cr as the plant entered a full half of depreciation.
- Receivables ballooned but management says it is timing: Trade receivables rose to ₹281.9 Cr from ₹152 Cr in March, which management says is largely in line with revenue growth and mostly pertains to module supply that started only in August-September after ALMM enlistment.
Ankit Garg: "The mix has moved towards Large EPC and module sales, which carry lower gross margins than residential installations. Our pricing discipline in each business has not changed, and the plant carried 6 months of fixed costs against a roughly2-2.5 months of manufacturing revenue."
The ALMM Bottleneck and Its Aftermath
- ALMM enlistment was the quarter's pivot point: The 1.23 GW module line at Miroli was enlisted on the ALMM-I list only in July 2026, meaning modules could not be supplied before then; the plant was largely unutilized for the first couple of months of H1.
- Utilization ramped fast once the gate opened: By September, plant utilization reached about 75–80%; management aims to raise it further now that enlistment is in place.
- Captive consumption was low in H1 but is set to surge: Only about ₹90 Cr of modules were captively consumed in H1 because the factory was not operational early on; the two large EPC contracts will consume ~130 MW DC of in-house modules, and management foresees 50–70% captive consumption "very soon."
- DCR cell supply fears are receding: Domestic DCR cell capacity increased from 20 GW to 42 GW in the last six months; management has tied up with a domestic supplier and says "dark times will be behind us" as the supply-demand gap closes over the next 6-9 months.
- ALMM-II timeline got breathing room: The government extended the strict implementation timeline from June to31 December 2026, and the ₹260 Cr module order book is entirely for non-DCR projects that can use imported cells even after that date, so there is no walk-away risk if projects slip into January.
- ALMM capacity is overstated: M10 modules, which contribute almost 35% of rated ALMM capacity, are about to be excluded as the supply chain has shifted to G12-R and M10-R; once that shift happens, listed capacity will go down.
Himanshu Garg: "Over the last 6 months' time, the overall cell supply has increased quite significantly. While we are speaking, it is to the tune of 50 GW plus. And over the next 6-9 months, the expectation is that... those dark times will be behind us."
The Residential Pivot: From Warehouses to Kits
- The old model was burning cash: Management observed that scaling end-to-end residential execution required significant forward investment per warehouse and city, with a fixed cash burn before each location reached profitability; given public-market capital constraints, they chose not to burn.
- Monthly residential run rate was cut deliberately: Revenue fell from ₹10–12 Cr to ₹4–5 Cr (excluding Kits) as management pulled back from distributed execution; the residential segment remained the highest-margin business at the unit level, but the fixed-cost burden made the immediate P&L unhealthy.
- Solar Kits are the new vehicle: Launched in mid-August, the 25-item branded Kit carries five years of insurance cover and is designed for empanelled vendors to install; between mid-August and30 September, Kits did about ₹4.5–5 Cr in revenue.
- Distribution is scaling city by city: Exclusive city distributors were appointed starting in July across Surat, Rajkot, Anand, Pune, Kota, and Kolkata; management plans to expand to more states and cities.
- Gujarat is the wildcard: A zero-cost residential solar installation model was launched in Gujarat about a month ago, layered on top of a new ₹28,000 state subsidy; management says if execution delivers in Gujarat alone, numbers could "increase in multiple excess" over the next 6 months, but it is too early to call out numbers.
- Solarium is now the number two residential player: Per management, behind Solar Square, with over11,400 installations recorded on the PM Surya Ghar national portal and a4.8/5 rating.
Himanshu Garg: "Maybe we don't want to burn, to be honest."
The Two Mega EPC Wins and the Order Book
- Two single-site50 MW AC contracts from Mahagenco: Won in April 2026, valued at ₹188.5 Cr and ₹186.5 Cr, these are ground-mount projects for the Maharashtra State Government DISCOM; they are the primary drivers of the order book jump from ~₹300 Cr to ₹720.9 Cr.
- Both contracts were subcontracted: Management subcontracted execution to two other listed EPC companies, with module supply secured for Solarium modules at a fixed cost-to-price, yielding additional margin over and above the subcontracting spread.
- Execution timeline is end of March: The two subcontracted contracts are to be executed by end of March, and the larger part of the ₹720.9 Cr order book, more than60–70%, is expected within FY27.
- Strategic shift away from distributed rooftop tenders: Management stopped bidding for distributed rooftop tenders and now bids only for a small number of technically demanding single-site projects.
- Module order book is all non-DCR: The ₹260 Cr module order book pertains entirely to projects allowed to use non-DCR (imported) cells, so there is no walk-away risk if projects slip past the31 December ALMM-II deadline.
Balance Sheet and Cash Flow
- Receivables reduction is a stated H2 priority: Management says receivables are largely in line with revenue growth and mostly from the immediately preceding couple of months; as collections come in, cash flow is expected to improve and finance cost as a share of revenue to come down.
- Post-30 September collections were not disclosed: An analyst asked how much had been collected from the ₹282 Cr receivables after30 September; management declined to provide the number on the call, offering to share it separately over email.
- Inventories fell sharply: Inventories came down to ₹40.7 Cr from ₹99.7 Cr as modules were dispatched into EPC and external orders.
- No further borrowing expected: Finance cost should remain on similar lines as seen over the last couple of months, and no equity raise is on the cards currently; management will evaluate if a requirement arises for the next set of growth.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| H2 EBITDA margin recovery | Confident of9–10% range, in line with prior call guidance | H2 FY27 |
| Full-year PAT margin recovery | Expect to recover to about5–6% range in H2 after H1 was around3.4–3.5% | H2 FY27 |
| Order book execution | More than60–70% of the ₹720.9 Cr order book to be executed | Within FY27 |
| EPC subcontract execution | Two subcontracted50 MW contracts to be completed | End of March |
| Plant utilization | Aim to raise utilization now that ALMM enlistment is in place | H2 FY27 |
| Receivable reduction | Bringing receivables down is a priority; finance cost as a share of revenue to come down as collections come in | H2 FY27 |
| Residential run rate (including Kits) | Expected about ₹8–10 Cr over next1–2 months | Next1–2 months |
| Captive module consumption | Foresee50–70% captive consumption "very soon" as projects in hand captively consume modules | "Very soon" |
| DCR cell supply-demand gap | Expect the gap to be largely filled as companies come up with cell lines | Next6–9 months |
Key Metrics
| Metric | H1 FY27 |
|---|---|
| Revenue from operations | ₹310.5 Cr, up 165% YoY from ₹116.9 Cr in H1 FY26 |
| Total income | ₹312.4 Cr, including other income of ₹1.9 Cr |
| Gross profit | ₹67.2 Cr, up 29% YoY from ₹51.9 Cr |
| Gross margin | 21.6%, compared to 44.4% in H1 FY26, reflecting mix shift towards EPC and module sales |
| EBITDA | ₹25.6 Cr, up 57% YoY from ₹16.4 Cr |
| EBITDA margin | 8.3%, compared to 14% in H1 FY26 and 7.5% in H2 FY26 |
| Profit before tax | ₹13.9 Cr, up 22% YoY |
| Profit after tax | ₹10.5 Cr, up 14% YoY from ₹9.2 Cr |
| PAT margin | 3.4% |
| Basic EPS | ₹5.04, compared to ₹4.42 in H1 FY26 |
| Total order book | ₹720.9 Cr, comprising ₹461.1 Cr EPC and ₹259.8 Cr module supply |
| Manufacturing sales revenue | ₹213.4 Cr, contributing 36.5% of revenue |
| C&I and Government projects revenue | ₹147.9 Cr, contributing 47.6% of revenue |
| Residential revenue | ₹37.6 Cr, contributing 12.1% of revenue |
| Product sales revenue | ₹11.6 Cr, contributing 3.7% of revenue |
| Total borrowings | ₹189.1 Cr, comprising ₹73.6 Cr long-term loans and ₹115.5 Cr short-term loans |
| Trade receivables | ₹281.9 Cr, up from ₹152 Cr in March 2026 |
| Finance cost | ₹8.3 Cr, compared to ₹4.4 Cr in H1 FY26, reflecting term loan and working capital for manufacturing and EPC |
| Depreciation | ₹3.4 Cr, compared to ₹0.5 Cr in H1 FY26 as the plant is now being depreciated for a full half |
| Plant utilization in September | 75%–80%, after ALMM enlistment in July 2026 |
| Residential installations recorded on PM Surya Ghar portal | Over 11,400, with a rating of 4.8 out of 5 |
| Solar Kits revenue | About ₹4.5–₹5 Cr, between mid-August and 30 September 2026 |
| Captive module consumption | About ₹90 Cr worth of modules in H1 FY27 |
| Residential segment gross margin | 35%–37% |
| C&I and Government segment gross margin | About 25% |
| Manufacturing segment gross margin | 14%–15% |
| Solar Kits gross margin | 15%–18%, with foreseen EBITDA margin of 10%–12% |