Key Takeaways
- Value over volume, and it is working: Trade share jumped from 74% to 78% sequentially, driving a meaningful EBITDA-per-ton bump even as overall volumes fell. July trade volumes are already up 8% YoY.
- Cost engine delivered a ₹206/ton QoQ drop to ₹4,241/ton, achieved after absorbing ₹110/ton of geopolitical cost escalation. The full-year target stays at ₹4,250/ton, with a further ₹250/ton reduction eyed for FY28.
- The South cluster is the deliberate drag: Volumes were consciously curtailed to shed low or negative-EBITDA tons, and the fix, shifting those tons into trade, will take 1 to 2 more quarters.
- Acquired assets are a mixed bag: Orient is running at 87% utilization with decent margins; Penna needs channel investment to lift utilization; Sanghi is improving but still absorbing capex.
- What to watch next quarter: Whether the 8% July trade volume momentum holds, the pace of South cluster turnaround, and how much of the ₹130–150/ton cost-savings cushion gets consumed by geopolitical cost pressure.
Volume Strategy: Trading Volume for Value
- The deliberate trade pivot: Overall volumes declined 2% YoY in trade and 21% YoY in non-trade because management consciously chased value over volume, reducing lower-margin non-trade tons while sustaining or improving trade market share. The trade sales share consequently rose from 74% to 78% sequentially.
- Why it makes economic sense: Variable cost dominates the cement cost structure, so producing at marginal or negative EBITDA destroys value. Management argues that even at lower capacity utilization, walking away from those tons leaves no value on the table.
- South took the biggest hit: The South cluster, a higher-clinker-factor and higher-cost market to service, saw the most aggressive volume curtailment, roughly 0.1 crore tons of low and negative-EBITDA volume. The plan is to improve cost to make those tons viable and then move them into the trade segment, a process expected to take 1 to 2 more quarters.
- North and West carried the quarter: North grew trade volumes 2% YoY while sharply reducing non-trade; West grew positively in both trade and non-trade, with key markets Mumbai and Gujarat delivering higher margins on non-trade volumes.
- July validates the bet: Trade volumes in July are running 8% ahead of the prior year, giving management confidence to maintain its full-year 8% volume growth target.
Bahety: "Market share has to be looked upon on an overall basis... we have sustained and rather only improved in terms of the market share on the trade segment. And so far as you may say that we have reduced our market share on the non-trade, which is like a very well calculated thought upon basically action plan."
Cost Reduction: The \$206/ton Quarter
- The headline number: Net operating cost fell to \$4,241 per metric ton, a sequential reduction of \$206/ton, achieved despite absorbing an estimated \$110/ton impact from geopolitical escalation in West Asia. Gross savings before that absorption were roughly \$316/ton.
- What drove the savings: Clinker factor improved by approximately 3% to 64%, saving roughly \$50/ton. Unit power cost dropped by \$1 per kWh (from \$5.9 to \$4.9) as renewable energy capacity rose by nearly 500 MW to 973 MW and WHRS capacity reached 228 MW. Primary lead distance fell by 20 km, trimming logistics cost by \$10/ton. Fixed costs were optimized despite lower capacity utilization of 65%.
- Fly ash is now a profit center, not just a cost line: A long-term agreement has been signed, and the company is consuming roughly 30% of fly ash in-house while selling surplus in the market. Profit from those sales brings down the overall effective cost of supply.
- Green power: selling now, consuming later: 45 crore units of green power were sold in Q1, generating \$140 crore in revenue with only ~5% opex, almost entirely dropping to the bottom line. This is a transition phase: the ultimate goal is 100% in-house consumption, expected within the next 3 quarters as plant connectivity to the central grid is completed. Captive consumption delivers better savings than market realization.
- Maintenance cost headwind: Scheduled maintenance covering almost 12% of kilns added an extra \$50/ton in cost this quarter. The company is engaging with auditors on equalizing this over four quarters per accounting standards but currently reports on an actual basis.
- The cost journey in perspective: From roughly \$5,000/ton at the time of the Holcim acquisition in September 2022, cost has now come down to \$4,241/ton. The full-year FY27 target is \$4,250/ton, with incremental cost inflation to be absorbed by incremental savings. The FY28 ambition is a further \$250 reduction to reach \$4,000/ton or below.
Bahety: "This INR206 plus INR110, if I have to gross it up, actually, my savings is INR316 actually. On the cost side. I have digested that INR110. And after that, our cost has come down by INR206 per ton."
Cost Savings Runway: The \$130–150/ton Cushion
- The identified levers for the rest of FY27: Lead distance reduction of another 15 km is expected to deliver \$35/ton. Raw material logistics optimization, including BCFC rates and fly ash sorting, should contribute \$30/ton. Energy savings from increased RE power consumption, a 5 kcal/kg clinker heat consumption reduction, and a 2–3 unit/ton cement power consumption reduction are projected to generate \$50/ton. Other expenses offer headroom of \$10–15/ton.
- The geopolitical hedge: Management estimates a potential \$100/ton cost rise from the geopolitical situation. The \$130–150/ton savings cushion, plus inventory buffers of one month of clinker and three months of coal, are positioned as the mitigation.
- Green power consumption ramp: Roughly 50% of the 45 crore units sold in Q1 are expected to be consumed in-house in Q2, with consumption increasing every quarter as capacities and grid connectivity come online. The green power share target is 60% by FY28, up from 48% on a revenue-plus-consumption basis.
- AFR/TSR ramp: The thermal substitution rate target is 12–15% for FY27, up from the current 7%, with a long-term goal of 25%. Investments have already been made, and confidence in hitting 15% is high.
Bahety: "I'm holding an inventory of clinker of almost a month, and I'm holding the coal inventory of almost 3 months. So I'm very well mitigated from that perspective. And on top of it, the initiatives to bring down the cost by INR100 to INR150, which will be a good mitigation to absorb any kind of surprises from any external factors."
Acquired Assets: A Three-Speed Integration
- Orient Cement: the bright spot. Capacity utilization is at 87% and margins are decent. Management says the acquisition valuation is justified when the Master Supply Agreement treatment between Orient and Ambuja is factored in; standalone numbers do not reflect this. Only minimal investment is expected prospectively.
- Penna: the work-in-progress. Capacity utilization needs improvement. The investment required is less on capex (under \$100–150 crores for AFR and WHRS) and more on channel network development and trade sales focus to enable margin expansion. The Jodhpur clinker unit of 0.3 crore tons has started trial production; commercial production will be considered from the September quarter.
- Sanghi: improving, still investing. Utilization for both clinker and cement is moving up. Investments are ongoing in a WHRS line and jetty expansion totaling roughly \$600 crores. One kiln shutdown occurred in the normal course. Every prospective quarter is expected to show better utilization and improved margins.
- The non-trade drag on acquired assets: Performance dipped at acquired assets because non-trade volumes were increased, and most of that volume was at negative or marginal EBITDA, dragging overall company performance. The strategic pivot to trade is designed to correct this.
- Temporary plant suspensions, not mothballing: Some manufacturing operations with roughly 3.5 million tons of annual capacity have been temporarily closed for roughly six months to execute a thorough optimization plan covering efficiency factors, WHRS investments, debottlenecking, railway infrastructure, fly ash availability, coal consumption, and heat factor technical efficiencies. Alternate supply plants are catering to the markets so no market loss is occurring. No decision on permanent closure has been made.
Bahety: "We don't want to lose any asset if we are able to turn it around. And that is the whole endeavour and efforts to see how best we can turn them around."
Capacity Expansion: ~1 Crore Tons Coming in FY27
- FY27 additions: Installed capacity is expected to reach 11.9 crore tons by year-end, with 1.02 crore tons being added. Key projects include Dahej (0.12 crore tons, trials started), Salai Banwa in UP (0.24 crore tons, commissioned), Bhatinda in Punjab (0.12 crore tons, commissioned), Jodhpur from Penna (0.2 crore tons, commissioned), Kalamboli in Mumbai (0.1 crore tons, expected Q2), and Warisaliganj in Bihar (0.24 crore tons, expected September).
- Maratha clinker: FY28. The 0.4 crore ton clinker line is expected to commission in Q1 FY28. A contractor issue that caused delay is now under control, and projects are closing off. There are no structural issues; the timeline also balances utilization with Sanghi clinker via marine infrastructure.
- Mundra clinker: ~2029. Expected 18–24 months from now.
- Beyond FY27: The plan is to add 0.8 to 1.0 crore tons of cement capacity every year from FY28 onwards, with a capex run rate of \$6,000–\$7,000 crores. WHRS capacity will increase from 228 MW to 376 MW in FY28 across existing and new kiln lines. RE capacity will rise from 975 MW to 1,132 MW.
- Coal block timeline: The first coal block is expected to be operational in roughly 30 months, with a 5–6 year payback on investments. Management declined to quantify tonnage savings, calling it too early.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth | 8% growth for FY27, trade-focused; July already at 8% YoY trade growth | FY27 |
| Trade mix | Trade sales to be upwards of 75% going forward | Ongoing |
| Cost per ton | \$4,250/ton for full year; Q2 net basis in line with or slightly better than Q1 | FY27 |
| Cost per ton (medium-term) | Further \$250/ton reduction to reach \$4,000/ton or below | FY28 exit |
| Green power consumption | Move to 100% in-house consumption of RE power | Next 3 quarters |
| Green power share | 60% green power share | FY28 |
| AFR / TSR | 12–15% thermal substitution rate | FY27 |
| AFR / TSR (long-term) | 25% thermal substitution rate | Long-term |
| WHRS capacity | Increase from 228 MW to 376 MW | FY28 |
| RE capacity | Increase from 975 MW to 1,132 MW | Not specified |
| Cement capacity | Reach 11.9 crore tons installed capacity | FY27 exit |
| Cement capacity addition | 0.8–1.0 crore tons per year | FY28 onwards |
| Capex run rate | \$6,000–\$7,000 crores per year | FY28 onwards |
| Maratha clinker commissioning | 0.4 crore ton clinker line | Q1 FY28 |
| Mundra clinker project | New clinker capacity | ~2029 (18–24 months) |
| Coal block operational | First coal block producing | ~30 months (2–2.5 years) |
| South cluster turnaround | Move curtailed volumes into trade; improve cost to make viable | 1–2 more quarters |
| Temporarily suspended plants | Optimization and turnaround evaluation; no permanent closure decision | ~6 months total suspension |
Key Metrics
| Metric | Q1 FY27 |
|---|---|
| Revenue | ₹9,500 cr |
| Operating EBITDA | ₹1,589 cr |
| EBITDA margin | 16.7%, improved 331 bps QoQ |
| EBITDA per ton | ₹931 |
| Profit after tax | ₹660 cr |
| Net worth | ~₹72,000 cr |
| Net operating cost per ton | ₹4,241, reduced ₹206 QoQ; full-year guidance ₹4,250 |
| Volume growth (total) | -7% YoY |
| Trade volume growth | -2% YoY; July MTD +8% YoY |
| Non-trade volume growth | -21% YoY |
| Trade sales share | 78% of overall sales, up from 74% QoQ |
| Premium products share | 34% of trade sales |
| Blended cement share | 85% of sales |
| Capacity utilization | 65% |
| Installed capacity | 10.9 crore tons; target 11.9 crore tons by end of FY27 |
| RE power capacity | 973 MW, up ~500 MW YoY; target 1,132 MW |
| WHRS capacity | 228 MW; target 376 MW |
| Clinker factor | 64%, improved ~3% YoY |
| Lead distance | 249 km, reduced 20 km YoY |
| Power cost per kWh | ₹4.9, reduced from ₹5.9 |
| Manpower cost per ton | ₹222 |
| Capex (FY27 plan) | ~₹6,500 cr; Q1 spend ~₹1,500–1,600 cr |
| Green power share (consumption basis) | 34%; 48% including sold units |
| AFR/TSR level | 7%; FY27 target 12–15% |
| Temporarily suspended capacity | ~0.35 crore tons annual capacity |
| RMC segment EBITDA | ~₹33 cr; margin 7% |
| Power sales revenue | ~₹140 cr (45 cr units sold) |
| Fly ash sales revenue | ~₹15 cr |
| Exceptional item (VRS) | ~₹24 cr, no impairment |