Key Takeaways
- Double-digit growth, clean quarter: Consolidated revenue rose 13% YoY to Rs.3,421 Crores, with PAT up 46% on a lower base, driven by newly commissioned projects and higher distribution demand.
- Transmission pipeline is the story: An upward of Rs.1,26,971 Crores in project bids is expected over 12–24 months, with management calling Q3 FY24 "very heavy with reverse auctions" and large HVDC bids imminent.
- Smart metering order book swells: LOAs for 1.48 crore meters (Rs.17,400 Crores contract value) were received this quarter, and revenue begins within 3–4 months of capex, keeping the cash cycle tight.
- Rating outlook overhang persists: Both agencies hold a negative outlook tied to wider-group noise; management says it is "over-communicating" and expects positive developments shortly, but gave no specific resolution triggers or timeline.
- What to watch next quarter: Whether the promised flood of transmission bids materializes, progress on the $1 billion equity raise by year-end, and any actual improvement in the rating outlook.
Transmission: The Growth Engine
- Network growth outpaces the country: AESL added 769 circuit kilometers in H1, growing its network 5% versus 1% for India overall; capacity grew 15% versus 2% nationally.
- Operational revenue up 8%: Transmission revenue reached Rs.941 Crores, helped by newly commissioned lines and Rs.26 Crores in incentive income from system availability above 99.68%.
- Three lines commissioned this quarter: The 756 ckm Warora-Kurnool line (India's largest inter-regional 765 kV link), the 1,000 MVA Karur line for green evacuation in Tamil Nadu, and the 74 ckm Kharghar-Vikhroli line bringing 400 kV closer to Mumbai.
- Under-construction pipeline advancing: Projects including MP-II package, Khavda-Bhuj, and WRSR will add over 1,300 ckm to the operational portfolio, with significant progress expected in coming quarters.
- Bidding cycle turning now: A backlog in awards from the GIB issue in Rajasthan cleared around Q1/Q2 calendar 2023; bidding and reverse auctions are now underway, and management expects large bids including HVDC lines in the next quarter.
- HVDC Mumbai on track for 2025–26: Total capex of Rs.6,600–7,000 Crores, with Rs.1,100–1,200 Crores spent so far; most equipment ordered and heavy spending planned over the next 18 months.
- Bhadla-Fatehgarh HVDC ambition: Management stated the company is "very keen" and "rightfully capable" to execute this project, and is working all quarters including strategic supplier discussions to secure equipment.
Dayal: "I am not too worried about month, year or two. Yes, whatever has happened is a smaller number but what is going to happen in the next two quarters there will be a lot of catching up that will take place as well so there are big ones lined up including HVDC as well."
Distribution: Demand Rises, Losses Fall
- Energy demand up 9% YoY: AEML sold 244.6 crore units, driving a 15% increase in distribution revenue to Rs.2,480 Crores, also helped by customer acquisitions.
- Distribution losses improved: Losses fell to 5.81% from 6%, attributed to seasonal factors including higher billing and more billing days.
- PAT jumped 155% YoY: Distribution PAT reached Rs.25 Crores, partly due to one-time bookings made in the same quarter last year.
- Parallel license applications progressing: Applications submitted to MERC for Navi Mumbai and to UPRC for Gautam Buddha Nagar; additional information requested by the commissions has been submitted.
Smart Metering: A Capital-Light Growth Vector
- LOAs for 1.48 crore meters won this quarter: Contracts from Maharashtra, Andhra Pradesh, and Bihar carry a combined value of Rs.17,400 Crores.
- Revenue cycle is short: Revenue begins as soon as meters are installed, typically 3–4 months after capex is incurred, not after full project completion. The cash-to-capex cycle is "very, very limited."
- Ordering has begun: Meter ordering started for the first project in South Mumbai (West region) and the Assam project.
- Supply chain is domestic: The entire technology and infrastructure is locally available, and the company can comply with 65% local value addition norms; some communication components may need import but the ecosystem is evolving.
- Capex phasing: The 30-month construction window means most spending will fall in the next year and the year after; management declined to give a specific capex number for the Rs.23,200 Crore order book, citing variability by technology, topography, and project size.
Mehta: "The revenue will start earning as and when the meters are installed so it is more like a churning of a working capital deployment which is required or the capital which is required so in three months to four months time as and when the capex is incurred we will immediately start earning the revenue so that is the beauty of this project is that the cash to capex cycle is very, very limited."
Balance Sheet & Funding
- Financial closures achieved: The HVDC line under construction in Mumbai reached financial closure with first drawdown this quarter; four more projects had closures concluded, with Rs.750 Crore drawn for two of them.
- KVTL nearing completion: The line is connected to the grid and awaiting legal circuit completion, targeted this quarter; once done, funds will become available for HVDC construction.
- US private placement targeted for early next year: The $360 million deal is in paperwork stage; management is waiting for an opportunistic timing window.
- Derisking strategy post-commissioning: After one year of operational history, management plans to refinance construction facilities with long-term ultra bonds at fixed interest to lock in known cash flows.
- Regulatory asset base set to rise: Capitalization of around Rs.1,200 Crores is expected by March 2024; the current reduction in the regulatory asset base (to Rs.7,870 Crores) reflects depreciation in H1, with minimal capitalization due to the monsoon season.
Equity Raise & Rating Outlook
- $1 billion equity raise still on for year-end: Shareholder approval is already obtained; management stated current growth is fully supported by equity from cash generation, and the raise would prepare for a higher capex growth opportunity.
- Rating outlook remains negative: Both agencies placed the outlook on negative due to noise around the wider group and potential increase in loans; ratings themselves are intact.
- Management claims over-communication: The company says it is actively engaging with agencies and expects "certain positive developments" shortly as the noise subsides, but declined to confirm any specific triggers the agencies are waiting for.
- AEML bond pricing acknowledged as unfair: Management noted yields do not reflect fair value and said it will work towards correcting this, but stated there are currently no plans or announcements to support bonds in the market.
Soni: "I think we have been actively communicating in fact I would say we are over communicating with the agencies given the last six to seven months through which we have been."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Transmission bidding surge | Large bids including HVDC lines; Q3 FY24 "very heavy with reverse auctions" | Next 3–6 months |
| Equity raise | $1 billion raise | Year-end 2023 |
| US private placement | $360 million deal conclusion | Early next year |
| Regulatory asset base addition | ~Rs.1,200 Crores capitalization | By March 2024 |
| KVTL commissioning | Legal circuit completion | This quarter |
| HVDC Mumbai commissioning | Full project completion | 2025–2026 |
| Rating outlook improvement | Positive developments expected "shortly" | No specific date |
Key Metrics
| Metric | Q2 FY24 |
|---|---|
| Consolidated revenue | ₹3,421 cr, +13% YoY |
| Consolidated EBITDA | ₹1,443 cr, +6% YoY |
| Consolidated PBT | ₹370 cr, +48% YoY |
| Consolidated PAT | ₹284 cr, +46% YoY |
| Transmission operational revenue | ₹941 cr, +8% YoY |
| Transmission EBITDA | ₹907 cr, +9% YoY |
| Transmission PAT | ₹259 cr, +8.5% YoY |
| Transmission cash profit | ₹501 cr, +4% YoY |
| Distribution segment revenue | ₹2,480 cr, +15% YoY |
| Distribution PAT | ₹25 cr, +155% YoY |
| AEML energy demand | 244.6 cr units, +9% YoY |
| AEML distribution losses | 5.81%, improved from 6.0% in Q2 FY23 |
| AEML collection efficiency | 79.2% |
| AEML share of RE procurement | 38%, up from prior year |
| Transmission system availability | >99.68%, generating ₹26 cr incentive income |
| Transmission network added (circuit km) | 219 ckm in Q2, reaching 19,862 ckm total |
| AESL network growth (H1 FY24) | 5% YTD, adding 769 ckm, vs 1% for country |
| AESL capacity growth (H1 FY24) | 15% YTD, vs 2% for country |
| Upcoming transmission pipeline | ₹1,26,971 cr, expected to materialize over 12–24 months |
| Smart metering pipeline | 1.94 cr meters, 8 projects, contract value ₹23,200 cr |
| Smart metering LOAs received in Q2 | 1.48 cr meters, contract value ₹17,400 cr |
| AEML regulatory asset base | ₹7,870 cr, with ~₹1,200 cr addition expected by Mar 2024 |
| AEML gross debt (excl. subordinated QIS debt) | ₹9,350 cr, cash balance ₹1,183 cr, net debt ₹8,167 cr |
| HVDC Mumbai project capex incurred to date | ₹1,100–1,200 cr, total committed ₹6,600–7,000 cr |
| H1 FY24 capex | ~₹2,500 cr, on track for annual guidance of ₹5,500–6,000 cr |
| US private placement target | $360 mn, for commissioned transmission assets, targeted early next year |
| Onshore project loan pricing | 9.5%–10% |