Key Takeaways
- Execution-led quarter, weather a drag: Consolidated EBITDA rose 13% YoY to ₹4,144 crores, but prolonged monsoon suppressed Mumbai energy sales growth to just 2% and slowed smart meter installations.
- Smart meter engine is scaling: 42.5 lakh meters installed in H1; the company targets 1 crore by year-end and a run-rate of 30,000 installations per day.
- Capex inflection is imminent: ₹17,000–18,000 crores of capex will be capitalized this year, unlocking an annualized EBITDA contribution of ~₹2,800 crores that begins flowing in H2.
- Transmission pipeline remains deep: ₹60,000 crores of projects are under construction, with another ₹80,000–90,000 crores of bidding opportunities identified over the next 1–1.5 years.
- What to watch next quarter: Whether the installation rate hits 30,000/day, the pace of capex capitalization and its conversion into tariff/EBITDA, and any order from MERC on the Navi Mumbai parallel license.
Smart Meter Business: Scale & Momentum
- Installation trajectory: 42.5 lakh meters installed in H1; the company will cross 1 crore installations by year-end. The Q2 slowdown was weather-driven (rains in Maharashtra, Uttarakhand, Assam, Bihar), and the daily run-rate has since recovered to 20,000, with a target of 30,000.
- Order book: 2.46 crore meters under contract, representing ₹29,000 crores of revenue potential.
- Market share dynamics: Order market share is 18–19%, while installation market share is higher at 23–24%, reflecting faster execution relative to peers. Management expects both shares to rise as new geographies are added.
- Billing conversion: 73 lakh meters commissioned, 67 lakh billed; a one-month lag exists between installation and commissioning due to testing by the distribution company.
- Addressable pipeline: About 10 crore meters of additional opportunity expected within a year from Tamil Nadu, Karnataka, Telangana, Madhya Pradesh, and Punjab. The Tamil Nadu bid is in technical evaluation; Telangana and Karnataka proposals have been submitted under RDSS.
Patel: "our market share is about 18-19% in terms of orders, our installation market share is about 23-24% and we will continue to have that kind of better installation rate as compared to all other players"
Capex & Capitalization: The H2 Inflection
- Full-year capex: ₹17,000–18,000 crores, of which ₹6,000 crores was incurred in H1. The back-end weighting is deliberate: four new projects where all approvals are in place are now accelerating.
- Transmission capex: ₹3,300 crores in H1, with ₹7,000–8,000 crores planned for H2.
- Capitalization surge: Only ₹2,300 crores capitalized in Q1; about ₹13,000 crores will be capitalized in H2. Three projects will be commissioned, with a fourth possible.
- Revenue translation: The ₹15,000 crores of transmission capex capitalized this year will add ~₹1,800–1,900 crores of tariff, plus ₹230 crores from already-commissioned projects, for a total transmission tariff addition of ~₹2,100 crores. Distribution capex of ₹1,500–1,600 crores will add ₹250–275 crores of EBITDA. Smart meters will contribute ₹800 crores of additional EBITDA.
- Growth duration: Management expects similar numbers to continue with growth every year for at least three to four years, based on the order pipeline.
Transmission: Pipeline, Wins & Execution
- Under-construction pipeline: ₹60,000 crores of projects are now in the ordering and construction pipeline.
- Bidding opportunity: ₹80,000–90,000 crores of projects identified by CTU and the central government over the next 1–1.5 years, with potential additions from states like Maharashtra. Management declined to give a precise H2 bidding number.
- Market share ambition: Currently operating at about 25% market share; the aim is to maintain that level.
- HVDC wins: Success attributed to established OEM relationships and terrain/ROW knowledge from already executing four projects in the Khavda-Olpad area. Management declined to comment on why competitors are not winning.
- Bhadla-Fatehpur HVDC: SPV and LOI received, all contracts finalized, construction begun at Bhadla; transmission line erection starts next month. Commissioning is expected in December or January.
- Right-of-way: The legal framework is now in place with most states notifying ROW policy and fair compensation, but the process still involves collector orders and public hearings, which take time. The company uses both routes in parallel.
Patel: "currently, we are operating at about 25% and we would like to continue to have that kind of market share"
Distribution: Mumbai, New Licenses & Demand
- AEML performance: Mumbai utility reported its lowest-ever distribution loss of 4.30% in H1. Transmission availability was 99.7%, generating ₹30 crores of incentive income in Q2 and ₹59 crores in H1.
- Demand suppressed by weather: Normal Mumbai growth is 5.5–6%; this year it was only 2% due to prolonged monsoon. Management stated the country-wide demand sluggishness is "only because of rain," with cyclone predictions on the east coast also a factor.
- AEML deleveraging: The utility continues to generate surplus; it bought back $44 million of USD bonds last quarter, reducing cost of capital. Short-term working capital loans were also paid down. Debt maturity now stands at 7.5 years.
- Navi Mumbai parallel license: The regulatory process is complete and the matter is closed for order; MERC now needs to issue its order. Capex is estimated at ₹10,000 crores over about 5 years, with deployment phased across 25 circles to achieve universal service obligation in each before moving to the next.
- Parallel license strategy: Management believes the major differentiator versus an incumbent is reliability and quality of supply, so it would likely build its own network rather than ride on existing infrastructure, even if regulation eventually permits the latter. Applications are also in for Mundra and Ghaziabad/Jewar.
Patel: "The major differentiation between you and the incumbent distribution company would be reliability of supply and quality of services. Now the moment you ride on the existing network, probably you might not be able to differentiate on those two aspects."
New Businesses: Cooling & Data Centers
- District cooling: The company is deploying India's largest district cooling facility in Mundra (88,000 tons of refrigeration capacity) and received LOIs from two third-party developers in H1. Management sees "humongous potential" but is spending significant time creating market awareness, as the concept is not well known in India.
- Google data center tie-up: AESL expects to provide energy solutions and timely connectivity, similar to work done for a Microsoft data center. Management said it is too early to quantify the monetizable opportunity.
Patel: "it is not only -- in fact, we spend a lot of time on creating market and awareness for the cooling solution because so far it is not very known concept in the Indian market"
Balance Sheet & Leverage
- Leverage target: Expect leverage to be in the range of around 4x by year-end.
- Refinancing: The company is working to refinance 2026 bonds well ahead of maturity, potentially through a mix of dollar and rupee bonds. It is AA+ rated in the Indian market, where AA+/AAA bonds generally price below 8%.
- Fundraise stance: No plans for equity fundraise; debt will be raised only for under-construction projects and refinancing.
- AEML bond buybacks: Will continue based on surplus generated.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Smart meter installations | Cross 1 crore cumulative installations | By year-end FY26 |
| Smart meter daily run-rate | Reach 30,000 installations per day | Not specified; resources lined up |
| Capex capitalization | Capitalize ₹17,000–18,000 crores, contributing ~₹2,800 crores annualized EBITDA | Flowing in H2 FY26 |
| Transmission project commissioning | Commission at least 3 projects, adding ~₹1,700–1,800 crores revenue | H2 FY26 |
| Transmission tariff addition | ~₹2,100 crores total additional tariff (₹1,800–1,900 crores from new capitalization + ₹230 crores from already commissioned) | FY26 |
| Smart meter EBITDA addition | ₹800 crores of additional EBITDA | FY26 |
| Distribution EBITDA addition | ₹250–275 crores from ₹1,500–1,600 crores capex capitalization | FY26 |
| Leverage | Around 4x | By year-end FY26 |
| Transmission market share | Maintain ~25% | Ongoing |
| Bhadla-Fatehpur HVDC commissioning | Project commissioned | December 2025 or January 2026 |
| Bhadla-Fatehpur transmission line erection | Erection activity begins | Next month (from call date) |
| AEML capex | ~₹1,000 crores | H2 FY26 |
| Refinancing of 2026 bonds | Refinance well ahead of maturity; mix of dollar and rupee bonds | Ahead of 2026 maturity |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Total income (H1) | ₹13,793 cr, +16% YoY |
| Consolidated EBITDA (H1) | ₹4,144 cr, +13% YoY |
| Consolidated PBT (H1) | ₹1,404 cr, +34% YoY |
| Adjusted PAT (H1, ex one-time deferred tax reversal) | ₹1,096 cr, +42% YoY |
| Consolidated capex (H1) | ₹5,976 cr, +1.4% YoY |
| Full-year capex guidance | ₹17,000–18,000 cr, contributing ~₹2,800 cr annual run-rate EBITDA |
| Transmission availability (H1) | 99.7% |
| Transmission incentive income (Q2) | ₹30 cr |
| Transmission incentive income (H1) | ₹59 cr |
| Transmission order pipeline | ~₹60,000 cr |
| Smart meter order book | 2.46 cr meters, revenue potential ₹29,000 cr |
| Smart meters installed (cumulative) | 73 lakh, 67 lakh billed |
| Smart meter installation rate | 20,000 per day, targeting 30,000 |
| Smart meter revenue per meter per month | ₹105–109, 80–85% EBITDA margin |
| Smart meter EBITDA (H1) | ₹253 cr |
| AEML distribution loss (H1) | 4.30%, lowest ever |
| AEML energy sales growth | +2% YoY, subdued by prolonged monsoon |
| C&I aggregate load demand | 717 MW |
| Cooling capacity under implementation | 88,000 tons of refrigeration |
| Net leverage | 4.4x at end of Q2, targeting ~4x by year-end |
| AEML bond buyback (Q2) | $44 mn of USD bonds |
| Dahanu plant EBITDA (excluded this year) | ₹92 cr in prior-year comparable period |
| One-time deferred tax reversal (prior year, excluded) | ₹314 cr |