Key Takeaways
- Earnings surge on capacity adds: Profit jumped 141.8% YoY as newly commissioned LPG terminals and improved liquid realizations drove a 26.2% revenue increase, while a 61% drop in interest costs amplified the bottom line.
- The growth story is now about pipeline connectivity: Five physical enablers, from the JLPL pipeline to a VLGC jetty, must come online to unlock normal throughput at the new gas terminals; until then, gas EBITDA per ton sits below target.
- A transformative acquisition and port expansion signal scale ambition: The proposed HALPG buy adds 25,000 MT of LPG capacity on the East Coast, while a non-binding MoU for Vadhavan Port targets a Rs. 20,000 crore investment and a jump from 6 to as many as 12 ports by 2030.
- The CAPEX runway is steep and funded: Management is on track for a cumulative USD 1.2 billion by next year and targets USD 5 billion by 2030, backed by a gearing ratio of 0.6x against a 3.5x EBITDA cap.
- What to watch next quarter: The JLPL pipeline connection going live, any volume uplift it delivers, and concrete steps on the HALPG acquisition and new port announcements.
The Throughput Bottleneck: Five Enablers to Watch
- Gas EBITDA per ton is temporarily depressed: At just under INR 1,100, it trails the INR 1,200 target because the new cryogenic terminals at Pipavav and Mangalore are running below normal throughput, waiting on evacuation infrastructure.
- Five enablers will unlock normal operations: JLPL pipeline connectivity (expected next quarter), KGPL pipeline (PNGRB permission received, commissioning by Q4), a VLGC jetty at Kandla to double parcel sizes, a Mangalore LPG Rail Gantry and Bottling Plant (construction started), and the JNPA LPG cryogenic storage and bottling plant (work in full swing).
- Recovery timing is back-end loaded: Management sees throughput improvement from Q4 onwards as JLPL and a portion of KGPL come into play, alongside VLGC berthing at Kandla.
- Liquid realizations are already improving: Blended liquid revenue realization rose to INR 2,500 from around INR 2,250, helped by a better product mix and the JNPA contribution, with further upside expected next quarter.
Murad Moledina: "So, it is a very exciting time going ahead. It is just the timing which we have to wait for the connections and operations."
The HALPG Acquisition: East Coast Entry
- Proposed 75% stake in Hindustan Aegis LPG Limited: The acquisition, subject to shareholder approval, consolidates 25,000 metric tons of LPG capacity at Haldia and marks the company's entry into the East Coast market.
- Long-term contracted cash flow: HALPG holds an exclusive terminalling agreement with HPCL valid until 2038, providing visible, contracted revenue for over a decade.
- Strategic fit with existing Haldia presence: The buy complements the high-utilization liquid capacity already operating at Haldia and the newly allotted 3-acre plot for future expansion.
Raj Chandaria: "I think this is a significant long-term asset that aligns well with our growth ambitions."
Port Expansion: Vadhavan and Beyond
- Vadhavan Port MoU signed: A non-binding MoU targets investment of around Rs. 20,000 crores, with intentions to develop additional liquid or gas capacity once land is allotted.
- Port count set to double: Management aims to expand from the current 6 ports to 8-12 ports by 2030, with a new port announcement expected in a quarter or so.
- Ammonia emerges as a new vertical: India's first independent Ammonia Terminal is under construction at Pipavav with a 15-year take-or-pay agreement with Hindustan Zinc, and a non-binding MoU with L&T targets a second ammonia terminal at Kandla for green ammonia facilities; management envisions 8-10 ammonia terminals by 2030.
Raj Chandaria: "We now have intentions to expand our presence to two new ports, and additional liquid or gas capacity will be developed once land is allotted in these ports."
CAPEX Trajectory and Funding
- Near-term milestone in sight: Cumulative CAPEX is on track to reach USD 1.2 billion (Rs. 10,000 crores) by December 2026 or March 2027.
- Long-term ambition: Management targets aggregate CAPEX of around USD 5 billion by 2030, spanning liquid capacity expansion to roughly 0.3 crore CBM by December 2026, gas infrastructure, and new port developments.
- Funding mix is conservative: Growth will be funded through a balanced mix of equity, internal cash generation, and prudent debt, with the current gearing ratio at 0.6x against a maximum cap of 3.5x EBITDA.
- Liquid capacity additions are granular and underway: A 60,000 CBM expansion each at Kochi and Mangalore is targeted for commissioning by December 2026, possibly sooner; a new 94,148 CBM liquid terminal at Kandla is scheduled for next year; and part of the new JNPA liquid terminal is expected before the end of this financial year.
Murad Moledina: "I think 500 crore is quite, we would... There is so much to do."
Segment Performance: Liquids Carry, Gas Waits
- Liquid terminalling delivered strong growth: Revenue from liquid terminalling rose 28.3% YoY, driven by high utilization at Haldia, Kochi, and Pipavav, plus improved realizations from product mix and JNPA.
- Gas terminalling grew but below potential: Revenue from gas terminalling was up 23.7% YoY, but throughput is constrained by the missing evacuation enablers; blended LPG realization was a shade above INR 1,200 with EBITDA just over INR 1,100, both expected to improve as multimodal evacuation scales.
- Interest cost collapse amplified profit: A 61% YoY decline in interest costs, reflecting the full-quarter impact of debt repayment, helped profit grow 141.8% YoY to Rs. 53.9 crores.
- Depreciation rose on asset additions: The increase reflects new assets coming on stream and JNPA's higher lease rent under INDAS 116, which is non-cash but flows through both depreciation and interest lines.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| JLPL pipeline operational | Connectivity to boost gas throughput at Kandla | Q3 FY26 (Dec 2025) |
| KGPL pipeline operational | PNGRB permission received; commissioning underway | Q4 FY26 (end of March) |
| VLGC berthing at Kandla | Doubles parcel size from 22,000 to 45,000 MT | Q3 FY26 |
| JNPA liquid terminal partial commissioning | Part of new liquid terminal online | Before end of FY26 |
| Pipavav Ammonia terminal completion | India's first independent Ammonia Terminal | Before Q1 of next fiscal year |
| Kochi liquid expansion | Additional 60,000 CBM | By December 2026, possibly sooner |
| Mangalore liquid expansion | Additional 60,000 CBM | By December 2026, possibly sooner |
| Cumulative CAPEX of USD 1.2 bn | On track | By Dec 2026 or Mar 2027 |
| Aggregate CAPEX of USD 5 bn | Long-term target | By 2030 |
| Port presence expansion | From 6 to 8-12 ports | By 2030 |
| HALPG acquisition | 75% stake, 25,000 MT LPG capacity at Haldia | Subject to shareholder approval |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue from operations | ₹187.6 cr, +26.2% YoY |
| Revenue from liquid terminalling | ₹106 cr, +28.3% YoY |
| Revenue from gas terminalling | ₹81.5 cr, +23.7% YoY |
| Operating EBITDA | ₹137.4 cr, +25.8% YoY |
| Profit after tax | ₹53.9 cr, +141.8% YoY |
| Interest costs | -61% YoY, driven by repayment of bank borrowings |
| Gas throughput | 0.07 cr metric tons, vs 0.05 cr metric tons in Q2 FY25 |
| Gas EBITDA per ton | Just under ₹1,100, vs target realization of ₹1,200 |
| Liquid revenue realization per CBM | ₹2,500, improved from ~₹2,250 in prior quarter and prior year |
| Liquid EBITDA realization per CBM | ~₹1,700, broadly stable; JNPA mix improvement expected to lift this |
| Other comprehensive income | ₹86.68 cr, representing margin on Pipavav Terminal commissioning (net of tax) |
| Cumulative CAPEX target | USD 1.2 bn by next year (Dec '26 / Mar '27); USD 5 bn by 2030 |
| Target gearing ratio | 0.6x currently, with a maximum cap of 3.5x EBITDA |
| Combined static LPG capacity | 225,800 metric tons across 4 terminals (Pipavav, Kandla, Mangalore, Haldia) |
| Liquid capacity (current) | 0.17 cr CBM, up from 0.15 cr CBM last year |