Key Takeaways
- Profit nearly doubled in 9M: Profit surged 90% YoY to INR163.2 crores, driven by liquid terminalling growth of 26.6% and new capacity coming online.
- Take-or-pay de-risks the buildout: A 15-year agreement for over half a million metric tons annually at Pipavav, plus the Hindustan Zinc-backed ammonia terminal, locks in utilization before construction finishes.
- The pipeline unlocks the terminal: Two LPG pipelines connecting Kandla to inland demand centers are nearing completion; management expects a sharp volume increase once both are commissioned.
- Capex ambition is now explicit: Aggregate capex is projected to reach $1.2 billion next year and approximately $5 billion by 2030, with Vadhavan Port alone carrying a potential INR20,000 crores outlay.
- What to watch next quarter: Whether the Jamnagar-Loni pipeline connection commissions by February end as promised, the Q4 seasonal LPG volume surge materializes, and any concrete framework agreement emerges from the L&T ammonia MoU.
The Growth Engine: Capacity, Pipelines & Product Mix
- Liquid realization improved structurally: The JNPA terminal has stabilized operations, driving a better product mix and higher realization rates that management expects to stay and further improve. This is not a take-or-pay effect.
- Two new LPG terminals contributing: Pipavav and Mangalore cryogenic LPG terminals, commissioned in June 2025, are now fully operational and contributing to revenues from Q3 onwards.
- Haldia acquisition opens the East Coast: The HALPG acquisition adds 25,000 metric tons of LPG storage with an exclusive terminalling agreement with HPCL valid until 2038. HPCL volumes have grown from 0.04 crore to over 0.15 crore and are approaching the 0.25 crore capacity.
- Kochi and Mangalore liquid expansions underway: Development of an additional 60,000 cubic meters of liquid capacity at each location is now in progress on newly allotted land.
- JNPT first phase nears: The first phase of new liquid capacity at JNPT is scheduled to come online in Q1 of FY27, contributing to the target of around 0.25 crore-plus liquid capacity by FY27 end.
- VLGC operations began at Kandla: The first ever VLGC docked at Kandla Port on December 31st, making it a VLGC-compliant facility. Management anticipates a sharp increase in volumes following this, with further uplift once the pipelines are commissioned.
Murad Moledina: "I think there will come a time very soon when we should get saturated at Haldia. That would open doors for us to look into expansion possibilities at that particular point of time."
The Pipeline Thesis: Connecting Supply to Demand
- Jamnagar-Loni connection imminent: Construction is in its last few meters and the pipeline is expected to commission by February end. It has also been approved for a capacity doubling, though that upgrade will take 2-3 years.
- Kandla-Gorakhpur pipeline by mid-2026: The worst-case scenario for commissioning is June 2026, and it will be operationalized at both Kandla and Pipavav. Full utilization is expected to take 2-3 years.
- Rail gantry at Mangalore: Work has started and will take 9 months, targeting operational status by September 2026.
- Multi-modal evacuation is the moat: The business model pairs world-class LPG infrastructure with bottling plants and multi-modal evacuation, which management argues drives quicker utilization and EBITDA.
Contracted Cash Flows: Take-or-Pay & Strategic Partnerships
- 15-year take-or-pay with an undisclosed conglomerate: The agreement covers handling petroleum products at Pipavav, managing over half a million metric tons annually starting around October 2026. Management declined to disclose whether the customer is existing or new.
- Ammonia terminal backed by Hindustan Zinc: India's first independent ammonia terminal at Pipavav (36,000 metric tons) is progressing well and is supported by a 15-year take-or-pay agreement, with completion expected before Q1 of the next fiscal year.
- Strategic partner sought for ammonia: Management is in talks to introduce a strategic partner into the ammonia asset to help upscale the segment, though no timeline was given.
- L&T MoU for green ammonia: A non-binding MoU has been signed with Larsen & Toubro to jointly develop ammonia terminals at Kandla, supporting L&T's upcoming green ammonia facilities. Discussions are ongoing to finalize a framework agreement.
Raj Chandaria: "I'm very proud to announce that we have entered into a 15-year long-term take-or-pay agreement with a large conglomerate, whose name we're not disclosing at this moment, for handling their petroleum products at Pipavav."
The Capex Supercycle: $5 Billion by 2030
- Capex roadmap quantified for the first time: Aggregate capex is projected to reach $1.2 billion by next year, with a long-term roadmap of approximately $5 billion to be achieved by 2030.
- Vadhavan Port is the elephant: A non-binding MoU has been signed to invest in the proposed Vadhavan Port with a potential project outlay of approximately INR20,000 crores. Management called this figure "really quite short" and said there is a lot to do if land and permits are obtained. Specific project breakdowns were not provided.
- Financial guardrails stated: The company intends to maintain a debt gearing ratio of 0.6 times, with overall leverage not to exceed 3.5 times EBITDA.
- Capex details withheld: When asked for a forward capex roadmap for next year, management declined to provide one, instead recapping past investments: INR5,000 crores in assets post-IPO, INR1,000 crores for Haldia, and INR1,675 crores for JNPA.
- Additional land acquired at Haldia: Three acres have been acquired for expanding liquid activities at Haldia.
- Cryogenic gas tank under assessment at JNPT: The company is evaluating development of a 36,000 metric ton cryogenic gas tank.
Murad Moledina: "INR20,000 crores is really quite short, don't worry. If at all we get the land and the permits to do that, there is a lot to do."
Business Model & Pricing Mechanics
- Pure-play infrastructure provider: The company takes no trading or title risk; revenue is tolling fees based on throughput, the volume in and out of the terminal.
- Liquid upside comes from complexity: Growth in the liquid segment follows demand, with upside driven by shifting the product mix toward more complex, high-value products or products that evacuate faster than the standard 30-day period, plus capacity additions.
- LPG is a utilization story: The model relies on multi-modal evacuation and bottling plant connectivity to drive quicker utilization and EBITDA.
- Cost advantage from in-house development: Management claims an advantage in getting infrastructure built in the quickest time and at the cheapest cost due to in-house infrastructure development capability.
- LPG seasonality confirmed: Q1 is the leanest quarter, Q2 and Q3 are similar, and Q4 sees a surge. Q3 LPG volumes were almost identical to Q2.
- Throughput projections declined: When asked for a ballpark throughput figure, management stated, "We do not give projections of throughput because it depends on our customers."
Murad Moledina: "We are only a service provider, infrastructure provider. And it's only tolling fees sort of what you say. But it's called throughput. It's based on the volume in and out of my terminal."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Jamnagar-Loni LPG Pipeline commissioning | Construction in last few meters; connection expected | February end (next month) |
| Kandla-Gorakhpur LPG Pipeline commissioning | Worst-case scenario June 2026; operational at Kandla and Pipavav | June 2026 |
| Pipavav ammonia terminal completion | Backed by 15-year take-or-pay with Hindustan Zinc | Before Q1 of next fiscal year |
| Pipavav 15-year take-or-pay agreement start | Handling over half a million metric tons annually | Around October 2026 |
| JNPT first phase liquid capacity online | New liquid capacity phase 1 | Q1 FY27 |
| Liquid capacity target | Reach around 0.25 crore-plus | By FY27 end |
| Aggregate capex milestone | Reach $1.2 billion | By next year |
| Long-term capex roadmap | Approximately $5 billion | By 2030 |
| Mangalore rail gantry operational | Work started, 9-month construction | September 2026 |
| Kandla-Gorakhpur pipeline full utilization | Ramp to full utilization | 2-3 years from commissioning |
| Jamnagar-Loni pipeline capacity doubling | Approved upgrade to double capacity | 2-3 years |
| Haldia saturation and expansion trigger | Expected to reach capacity, opening expansion possibilities | Very soon (no date) |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue from operations | ₹197.5 cr, +22.3% YoY |
| Revenue from liquid terminalling | ₹116.5 cr, +37% YoY |
| Revenue from gas terminalling | ₹81 cr, +6% YoY |
| Operating EBITDA (9M FY26) | ₹403.2 cr, +18.1% YoY |
| Profit after tax (9M FY26) | ₹163.2 cr, +90% YoY |
| Liquid capacity | 0.17 crore cubic meters |
| Liquid capacity expected by FY27 end | 0.25 crore plus cubic meters (per an analyst's math) |
| Gas throughput (9M FY26) | 1.89 crore metric tons, crossed last year's full-year throughput of 0.19 crore metric tons |
| Total LPG throughput capacity | ~1.8 crore metric tons, including Haldia addition |
| Gas realization per metric ton | ~₹1,250, Q1: ~₹1,290, Q2: ~₹1,200, Q3: ~₹1,210 |
| Haldia terminal throughput | >0.15 crore metric tons, up from 0.04 crore at inception; capacity 0.25 crore |
| JNPA project capex | ₹1,675 cr, first phase of new liquid capacity expected Q1 FY27 |
| Aggregate capex projected by next year | $1.2 bn |
| Capex roadmap by 2030 | ~$5 bn |
| Debt gearing ratio target | 0.6x, overall leverage not exceeding 3.5x EBITDA |