Key Takeaways
- FY26 delivered 17% revenue growth and 52% net profit jump, powered by a 3.75x capacity expansion since the JV and strong operating leverage as new terminals came online.
- The LPG import disruption is a temporary blip, not a structural crack: volumes fell 50% in March on Strait of Hormuz ship strandings but had already recovered to a 30-35% shortfall by May, and the parent's distribution arm absorbed the slack.
- Ammonia is the next growth leg, and it is derisked: the Pipavav terminal has one-third of capacity locked under a 15-year take-or-pay contract with Hindustan Zinc, and ITOCHU has taken a 10% stake with a path to 25%.
- The capex runway is long and funded: a ~$500 crore pipeline through 2030, with FY28 spend alone approaching INR5,000 crores, to be met by internal accruals, measured debt at ~0.6x gearing, and a second-phase QIP when the big spending years arrive.
- What to watch next quarter: the ammonia terminal commissioning in July, the pace of LPG import normalization, and the revenue contribution from JNPT Phase 1 liquid capacity as it comes online through H1 FY27.
Capacity Build-Out & the Growth Engine
- Liquid terminaling led the charge: the segment grew 27.8% YoY in FY26 and 31% in Q4, driven by capacity additions and a favorable product mix that lifted revenue per cubic meter.
- Gas terminaling grew more modestly at 8.6% YoY, with cumulative throughput rising from 0.33 to 0.39 crore tons; Q4 gas throughput hit 0.1 crore MT, up 14.6% YoY.
- The JV has multiplied capacity rapidly since November 2021: liquid storage up 3.75x and LPG static capacity up 4.5x, with more coming.
- JNPT Phase 1 is the next catalyst: 318,000 CBM of liquid capacity expected to commission from July 2026, with most operative by H1 FY27 and completion likely by October 2026; revenue contribution begins in Q2.
- Kandla CRL4 adds another 94,148 cubic meters of liquid capacity, on track for commissioning next year.
- Mangalore's 75,000 cubic meters of liquid capacity added last year is now fully operational, with additional land secured for a further 60,000 cubic meters.
- Kochi will also expand: plans to add up to 60,000 cubic meters on newly allotted land, with detailed timelines once plans are finalized.
- The port count is set to grow from 7 to 12 by 2030, and the company intends to move into inland depots and backward into jetties, plus enter new products: ethane, propylene, and natural gas infrastructure.
Chandaria: "We always follow demand, we are not somebody who will do flag planting and do anything prematurely. We don't let demand follow us."
LPG: Disruption, Recovery & the Pipeline Advantage
- The Strait of Hormuz conflict stranded LPG ships from March, cutting import volumes 50% in March; the shortfall narrowed to 30-35% by May and management expects normalization soon.
- Vertical integration with parent Aegis Logistics cushioned the hit: the parent's distribution volumes grew substantially in Q4, helping maintain utilization of Aegis Vopak's LPG terminal despite lower imports.
- Pipeline connectivity is transforming the LPG evacuation model: the Jamnagar-Loni pipeline is now complete at Kandla, and the Kandla-Gorakhpur pipeline connection is expected in H1 FY27, both bringing higher throughput and efficiency.
- Pipavav's pipeline connection to the Central India KGPL pipeline is expected in Q2 FY27, while the Mangalore-Hassan-Cherlapalli pipeline is targeted for FY28.
- Rail evacuation is also expanding: an LPG rail gantry is under active construction at Mangalore, expected earlier than FY28, and a liquid rail gantry is being built at both Mangalore and Pipavav.
- Kandla became VLGC-compliant with its first VLGC receipt in December, and a new VLGC-capable jetty at Pipavav is expected mid-FY27, further improving throughput economics.
- Management guided for 30-40% YoY throughput growth in the current year, implying confidence that the LPG disruption is transitory and new capacity will drive volumes.
Ammonia: The Next Leg, Derisked
- India's largest cryogenic third-party ammonia terminal at Pipavav (36,000 MT static capacity) is expected to be commissioned in July 2026.
- One-third of capacity is already contracted under a 15-year take-or-pay agreement with Hindustan Zinc for their upcoming DAP plant, which is expected to be commissioned in H1 of this fiscal year.
- ITOCHU Corporation has taken an initial 10% stake in the ammonia subsidiary (Aegis Terminal Pipavav Limited), with plans to raise it to 25% over the next three years, bringing strategic and financial validation.
- The ammonia opportunity extends well beyond fertilizer: management sees robust demand from industrial customers and specialty chemicals, and the same infrastructure will be usable for green ammonia when that market matures.
- A non-binding MoU with L&T for joint development of ammonia terminals at Kandla signals intent to replicate the model; discussions are progressing toward a formal framework agreement.
- Management is explicit about scaling cautiously: the plan is to digest the first terminal, then expand the ammonia footprint, rather than building ahead of demand.
Chandaria: "The prospects for the ammonia business are bright. We believe that to go gradually, and carefully with this first ammonia terminal. But I suspect that we would be expanding our ammonia footprint, the moment that we have digested this current one."
The Liquid Business: High Earnings Visibility
- Liquid terminals earn on capacity, not throughput: the company hires out tank capacity rather than contracting on volume, so the key metric is revenue per cubic meter of capacity, not physical occupancy.
- A 15-year take-or-pay agreement at Pipavav with a leading conglomerate locks in committed petroleum product volumes exceeding 0.05 crore MT per year, with operations expected to commence by year-end.
- The Haldia acquisition adds ~25,000 MT of LPG storage and marks entry into the East Coast LPG market, anchored by a long-term exclusive terminaling agreement with HPCL through 2038; additional land has been acquired for liquid storage expansion.
- Management declined to disclose the revenue split between long-term and spot agreements, stating the company operates as an open-source terminal and does not track such statistics.
Capex, Funding & the Vadhvan Option
- The planned capex pipeline is ~$500 crore through 2030, aligned with both traditional energy demand and emerging energy transition value chains.
- Near-term spending is accelerating: FY27 capex is USD120 crore, and FY28 is expected to be close to INR5,000 crores, with the heaviest spending concentrated in the last two years of the five-year plan.
- Funding combines internal accruals with measured debt, targeting a gearing ratio of ~0.6x; the company raised INR660 crore and INR1,030 crore through two series of NSE-listed NCDs in FY26.
- A second-phase QIP (equity dilution) is expected when the big capex years arrive, with the current INR4,000-5,000 crore annual pace likely continuing for the next two years before that step-up.
- Vadhvan is a high-optionality bet: a non-binding MoU to participate in developing liquid and gas handling facilities with a potential project outlay of ~INR20,000 crores, but it remains subject to all approvals and land allocation; if successful, it would add meaningful scale and significantly expand geographic reach.
- Construction stays in-house under Aegis Logistics supervision for terminals owned and operated by Aegis Vopak, an arrangement management argues delivers the cheapest and quickest build while leveraging Vopak's 400-year technical heritage.
Moledina: "So, the best is that as a group, we construct in-house our own infrastructure cheapest, quickest. We have technical skill of our parent Vopak, who is a AAA ESG company, has been doing this business last 400 years, present in 23 countries, have long relationships with who's who of the world, all big multinationals."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Throughput growth | 30-40% YoY throughput growth for the current year | FY27 |
| JNPT Phase 1 liquid capacity | 318,000 CBM commissioning begins; most operative by H1, likely complete by October 2026 | From July 2026 |
| Ammonia terminal commissioning | India's largest cryogenic third-party ammonia terminal at Pipavav (36,000 MT) | July 2026 |
| Hindustan Zinc DAP plant | Triggers ammonia offtake under 15-year take-or-pay contract | H1 FY27 |
| Kandla-Gorakhpur LPG pipeline connection | Improves throughput and efficiency at Kandla | H1 FY27 |
| Pipavav KGPL pipeline connection | Connects Pipavav to Central India pipeline network | Q2 FY27 |
| Pipavav VLGC-capable jetty | Enables VLGC handling at Pipavav | Mid-FY27 |
| Pipavav petroleum operations | Commence under 15-year take-or-pay agreement | By year-end (CY26) |
| Mangalore-Hassan-Cherlapalli pipeline | Improves evacuation from Mangalore | FY28 |
| ITOCHU stake increase | From 10% to 25% in Aegis Terminal Pipavav Limited | Over next 3 years |
| Port count expansion | From 7 to 12 ports | By end of 2030 |
| Capex pipeline | ~$500 crore total | By 2030 |
| Gearing ratio target | ~0.6x | Ongoing |
| Second-phase QIP | Equity dilution to fund big capex years | When capex pace steps up |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Revenue from operations | ₹243.5 cr, +22.2% YoY |
| Liquid terminaling revenue | ₹121.1 cr, +31% YoY |
| Gas terminaling revenue | ₹122.4 cr, +14.6% YoY |
| Operating EBITDA | ₹179.2 cr, +24.2% YoY |
| Net profit | ₹73.9 cr, +15.3% YoY |
| Quarterly gas throughput | 0.1 crore metric tons |
| FY26 revenue from operations | ₹923.1 cr, +17% YoY |
| FY26 liquid terminaling revenue | ₹440.5 cr, +27.8% YoY |
| FY26 gas terminaling revenue | ₹482.6 cr, +8.6% YoY |
| FY26 operating EBITDA | ₹686.5 cr, +19.4% YoY |
| FY26 net profit | ₹341.9 cr, +52.1% YoY |
| FY26 cumulative gas throughput | 0.39 crore metric tons, up from 0.33 crore in FY25 |
| Throughput growth guidance (FY27) | 30% to 40% year-on-year expected |
| Final dividend per share (FY26) | ₹0.2, ~2.0% on face value of ₹10 |
| Liquid storage capacity growth since JV formation | 3.75x (since Nov 2021) |
| LPG static capacity growth since JV formation | 4.5x (since Nov 2021) |
| Aggregate capex by end of FY27 | ~USD 120 crore |
| Planned capex pipeline by 2030 | ~USD 500 crore |
| Gearing ratio target | ~0.6x |
| JNPT expansion total capex | ~₹1,675 cr |
| JNPT additional liquid storage under expansion | ~318,100 cubic meters, most operational in H1 FY27 |
| JNPT additional LPG capacity under expansion | 77,236 metric tons |
| Kandla liquid storage capacity | ~952,000 cubic meters |
| Kandla LPG capacity | 48,000 metric tons |
| Pipavav total LPG capacity | 70,800 metric tons (post commissioning of 48,000 MT cryogenic terminal in Jun 2025) |
| Pipavav ammonia terminal static capacity | 36,000 metric tons, India's first independent ammonia terminal |
| Mangalore liquid storage capacity | 193,000 cubic meters (post addition of 75,000 cubic meters) |
| Mangalore cryogenic LPG terminal capacity | 82,000 metric tons, commissioned Jun 2025 |
| Vadhvan potential project outlay | ~₹20,000 cr |
| NCDs raised during FY26 | ₹660 cr (Series 1) and ₹1,030 cr (Series 2), both NSE listed |
| LPG import volume shortfall (Mar 2026) | 50% down due to Strait of Hormuz situation |
| LPG import volume shortfall (May 2026) | 30% to 35% down, improving |
| FY28 capex expectation | close to ₹5,000 cr |
| Liquid terminal blended earning benchmark | ₹3,000 per CBM regarded as very good |
| Pipavav ammonia terminal contracted capacity | one-third of capacity on 15-year take-or-pay with Hindustan Zinc |
| Target port presence by 2030 | 12 ports, up from current 7 |