Key Takeaways
- Turnaround to breakeven: FY22 swung from a ₹2,717 Cr loss to a ₹410 Cr profit, aided by a ₹667 Cr tax refund, while revenue grew 23% YoY.
- Material costs crushed margins: Material cost hit an all-time high of 72% of revenue, up from a historical ~60%, as steel and copper spikes outpaced capped price-variation clauses.
- Thermal pipeline is real and urgent: A visible pipeline of over 7,700 MW of coal-based plants is expected to order soon, accelerated by the power-supply crunch.
- Diversification bets are placing: Record defence orders of ₹1,500 Cr, entry into Vande Bharat propulsion, and the largest-ever nuclear turbine island order mark a pivot beyond thermal.
- What to watch next quarter: Whether the 7,700 MW thermal pipeline actually converts to orders, the pace of FGD ordering as deadlines loom, and any relief in the commodity cost-to-revenue ratio.
The Turnaround: Profitability Restored, but Quality Check Needed
- Breakeven achieved: FY22 delivered PBT of ₹437 Cr and PAT of ₹410 Cr, reversing a loss of ₹2,717 Cr in FY21, despite the first quarter being hit by the second COVID wave.
- Tax refund did heavy lifting: The PBT-to-PAT gap was just ₹27 Cr because a ₹126 Cr tax refund, won from pre-2010-11 disputed cases at the tribunal, flowed through both interest income and the current tax line.
- Revenue engine restarted: FY22 revenue rose 23% YoY on stronger execution, with Q4 up 13% YoY.
- Cost-cutting was real: Manufacturing, admin, and selling expenses fell to 7% of turnover in FY22 from 9% in FY21, and to 5.5% in Q4, the lowest in many years, driven by an aggressive cost-reduction drive.
- Provisions swung favorably: Provisions turned negative at ₹(1,526) Cr because no merit-based provisions were required this year versus ₹1,827 Cr last year, and better withdrawals occurred.
- Engineering optimization helped: Internal engineering efforts saved ₹600-700 Cr, partially offsetting the material cost blow.
Subodh Gupta: "If you see the financials of BHEL (prior financials), it was always in the range of 60%. So that really further impacted us. Otherwise, things are well under control and whatever we have already factored into this material cost into our current financials also."
The Margin Story: Material Costs Are the Villain
- Material cost spike: Material costs consumed 72% of revenue, an all-time high versus a historical ~60%, driven by sharp rises in steel, copper, and other metals.
- PVCs are an imperfect shield: Price variation clauses exist in roughly 50% of orders, but pass-through is capped and index-based indices lag actual commodity price spikes, limiting recovery.
- Time extensions may unlock some PVC benefit: Requests for time extensions due to COVID have been submitted to customers; once approved, some additional PVC benefit will accrue.
- Other expenses turned negative in Q4: A provision write-back of ₹(842) Cr, partially offset by other expenses of ₹423 Cr and power and fuel of ₹125 Cr, plus an exchange rate variation gain of ₹91 Cr, pushed other expenses below zero.
- Contract assets swelled: Contract assets rose to ₹26,940 Cr from ₹24,079 Cr, partly because ₹3,600 Cr of additional project funding came from unfavorable payment terms in past NTPC contracts, effectively a forced financing of projects by BHEL.
Subodh Gupta: "Those will be coming but after some time because we cannot show under investment in the company. So those are also reflected as contract asset. Otherwise, it's indirectly a funding for the projects from BHEL."
Thermal Power: A Pipeline That Must Convert
- Visible pipeline of 7,700 MW: Management named Talcher, Talabira, Adani, Bhandora, Singrauli, and Lara as projects expected to order in the very near future, with the power-supply crunch likely speeding up decisions.
- Advanced-stage tenders: Roughly 4,000 MW is in advanced bidding, including Talabira (3x800 MW) and Adani Bhandora (2x800 MW), with another 3,000-4,000 MW expected within one year, including Talcher (2x660 MW), Singrauli (2x800 MW), and Lara phase-2 (2x800 MW).
- FGD ordering is inevitable but invisible: Out of 1,67,000 MW identified by CEA for FGD, approximately 1,10,000 MW is already finalized, and BHEL holds a ~30% market share, but state and private sector ordering has not yet begun and visibility is absent.
- FGD dampener: The government and Ministry of Power are considering a two-year extension on compliance timelines, which may slow the ordering pace.
- Payment terms improving: Government guidelines issued in October and NTPC's amended tender terms for future projects like Talcher are moving toward more favorable payment structures, with 90% payment available and 10% deferred for PG test and trial operation.
Dr. Nalin Shinghal: "So, as I already said, we are seeing a pipeline of almost 7,700 Megawatt, you know because Talcher, Talabira, Adani, Bhandora then Singrauli, Lara, all these are there, so we are expecting these ordering to happen in the very near future with you know the crunch on the power-supply side, this is going to be speeded up."
Diversification: Planting Flags Beyond Thermal
- Defence order book hit a record: FY22 defence order booking reached ₹1,500 Cr, the highest ever, up from a historical run-rate below ₹500 Cr, and management expects further growth this year as geopolitical urgency drives indigenization.
- Nuclear milestone: BHEL received its largest-ever nuclear order for the EPC of the Turbine Island package for six units of 700 MWe Pressurized Heavy Water Reactors from NPCIL under fleet-mode procurement, plus orders for Reactor Header Assemblies and Steam Generators.
- Vande Bharat entry: The company secured its first order for 16 sets of 3-phase IGBT-based propulsion systems for Vande Bharat Express Trains from ICF Chennai, marking entry into the domestic semi-high-speed mobility segment, with a focus on building this segment in a very big way.
- Railways and defence are the near-term bets: Management is bullish on these two sectors for FY23 and the next 24 months, with technology tie-ups in the pipeline to support the railway segment.
- Hydrogen capability building: A dedicated business group has been set up, a 5 kW fuel cell developed, and discussions are underway with international majors for electrolyzer technology tie-ups.
- Coal gasification moving: Four plants were announced in the budget, and BHEL is already moving with leading power, coal, and lignite producers, expecting the initiative to speed up further.
- Solar module manufacturing ruled out: Management explored entering solar module manufacturing but decided against it at this point.
Dr. Nalin Shinghal: "We have explored that, but at this point I think the call is not to get into this."
Balance Sheet & Cash Flow: Quietly Strengthening
- Cash position improved: Net cash and bank balances rose to ₹2,409 Cr from ₹1,868 Cr at the end of FY21.
- Working capital released: ₹586 Cr was released in FY22 despite a 24% revenue rise, with net positive cash generation from operations of ₹660 Cr versus ₹560 Cr in FY21.
- Receivables at a decade low: Current trade receivables fell to ₹6,229 Cr, the lowest in 10 years, while total trade receivables at ₹33,169 Cr were only marginally higher than March 2021 despite the revenue jump.
- CapEx plan is modest: FY23 CapEx is planned at ₹231 Cr, with longer-term investments earmarked for ISRO tankages (₹200+ Cr), upgraded steam generator manufacturing (₹140 Cr), and coal gasification.
- Asset monetization in process: The government has set up a separate body to handle asset monetization; BHEL has identified certain properties and is awaiting procedural clarity, which management expects quite soon.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Thermal order inflow | 7,700 MW visible pipeline (Talcher, Talabira, Adani, Bhandora, Singrauli, Lara) to convert to orders | "Very near future," most by FY24 |
| Defence order growth | Order booking to increase further from FY22 record of ₹1,500 Cr | FY23 |
| FGD ordering pickup | State and private sector ordering to begin, given country's commitments | No specific timeline; visibility not yet there |
| Asset monetization | Procedural clarity expected on identified properties | "Quite soon" |
| PVC benefit from COVID extensions | Additional PVC benefit to accrue once time extension requests are approved by customers | Upon customer approval |
| CapEx | ₹231 Cr planned | FY23 |
Key Metrics
| Metric | Q4 FY22 |
|---|---|
| Revenue from operations | ₹7,600 cr, up 13% YoY |
| EBITDA | ₹1,280 cr |
| Profit before tax | ₹1,098 cr, vs loss of ₹1,385 cr in Q4 FY21 |
| Profit after tax | ₹909 cr, vs loss of ₹1,033 cr in Q4 FY21 |
| Manufacturing, admin, selling & distribution expenses | 5.5% of turnover, vs 7% in Q4 FY21 |
| Other expenses | ₹(385) cr, including provisions of ₹(842) cr, ERV gain of ₹91 cr |
| FY22 total order booking | ₹23,693 cr |
| Total outstanding order book | ₹1,02,542 cr (Power: ₹85,664 cr, Industry: ₹11,836 cr, Exports: ₹5,042 cr) |
| FY22 material cost | 72% of revenue, all-time high vs historical ~60% |
| FY22 defence order booking | ₹1,500 cr, highest ever |
| Thermal power project pipeline | ~7,700 MW total, with ~4,000 MW in advanced bidding |
| Nuclear order (6x700 MWe TGs) | ₹10,800 cr |
| FY22 commissioning/synchronization | 4,119 MW of power plants plus 1,460 MW of steam generators |
| Cash and bank balances, net of borrowings | ₹2,409 cr, vs ₹1,868 cr at end of FY21 |
| Trade receivables | ₹6,229 cr, lowest in 10 years; total receivables including contract assets ₹33,169 cr |