Key Takeaways
- Flat quarter, margin up: Revenue dipped 1% YoY as labour shortages and a cyclone hit site activity, but EBITDA margin rose 115 bps to 23.13% on softer raw material prices.
- The Wada ramp is the whole story: The new plant started commercial production mid-April and dragged utilization to 65% overall; old plants ran at ~80%, so all near-term growth depends on how fast Wada fills up.
- ISI certification just unlocked demand: Certification arrived only in the last couple of days, meaning Wada could not sell into the government and institutional tender market through all of Q1; August should see a step-up.
- JV with SCG adds a second growth leg: Machinery orders are placed, construction starts in 10–15 days, and commercial production is targeted for end-Q4 FY24, bringing panels, a new-to-India product with monopoly pricing potential.
- What to watch next quarter: Whether Wada utilization jumps from ~65% toward the 70% September target now that ISI is in hand, and whether the 30% annual revenue growth ambition starts showing up in the quarterly prints.
The Wada Ramp: Where the Growth Sits
- Old plants maxed out: The two legacy plants ran at ~80% capacity, which is why the top line has been flat for several quarters; all incremental volume must come from the new Wada unit.
- Q1 was a soft start: Wada began commercial production only in mid-April, so Q1 captured barely six weeks of output from the new capacity, and even that was constrained by the absence of ISI certification.
- ISI certification was the gate: The company could not sell to government projects, institutions, or tender-based buyers without it; certification arrived only in the last couple of days, so the Q2 base is fundamentally different from Q1.
- July already better: Umbergaon and Kapadvanj plants hit 85–90% utilization in July, and Wada is expected to improve from August onward now that ISI is in hand.
- Cyclone and labour compounded the softness: Cyclone Biparjoy cost roughly a week to ten days of working in North Gujarat, and post-holy-period labour shortages at construction sites added to the drag.
Mohit Saboo: "I think by end of September '23 we should reach almost 70% of our capacity utilization and thereby the Wada plant we'll take up the expansion also at Wada plant after that."
Margin Drivers & Cost Structure
- Raw material tailwind: The 115 bps YoY EBITDA margin improvement to 23.13% was driven primarily by a decline in raw material prices, not operating leverage.
- Structural cost advantages: The company runs a fleet of 65–70 own trucks, operates three units in similar vicinity to extract quantity discounts from vendors on cement, lime, and other raw materials, and earns carbon credits, all of which support higher EBITDA margins than some competitors.
- Rejection rate edge: Company rejection levels run at 4–4.5% versus competitor levels of 6–7%; the fully automatic Wada plant is expected to go below 2%, which flows directly to cost of goods.
- PAT margin optically lower: PAT margin declined YoY because Wada just started, adding finance cost and depreciation, while the prior-year Q1 had almost negligible tax due to accumulated losses at the acquired sick unit (Star Bigbloc subsidiary).
- Management steers the conversation to EBITDA: When asked about net profit margin targets, the CFO explicitly redirected investors to EBITDA margins, arguing interest, depreciation, and taxation are not fully controllable.
Mohit Saboo: "So, as I mentioned more than net profit margin I think we should be calculating on the EBITDA margins that the company is concentrating more on."
The SCG Joint Venture & Panels Opportunity
- JV structure and timeline: SIAM Cement Bigbloc Construction Technologies Private Limited, the JV with Thailand's SCG, is setting up a greenfield unit at Kapadvanj; machinery orders are placed, the contractor is finalized, and construction begins in the next 10–15 days.
- Commercial production target: Management intends to start commercial production by end of Q4 FY24, with no significant revenue contribution expected in FY24; the ramp to ~75% utilization is expected over the following six months.
- Panels are the differentiator: The JV will manufacture AAC panels alongside blocks; panels are a further advancement of technology not yet prevalent in India, and capacity is fungible between blocks and panels based on market demand.
- Pricing strategy for panels: Initial pricing is set to deliver similar EBITDA levels as blocks, but management intends to scale up prices later given the product's superiority and the company's first-mover, near-monopoly position.
Mohit Saboo: "As of today, panels is our new product which is hardly being sold in the market. And the current prices that we intend to put out for the panels in the market will be keeping our similar EBITDA levels as we are doing for the blocks industry. And going ahead since it's a better product and we'll have sort of a monopoly, so we'll look at scaling up the prices for the panels."
Demand Environment & Market Conversion
- The real addressable market is red brick displacement: Management's core thesis is converting the market from red bricks to AAC blocks; red brick prices have risen due to NGT strictness, kilns shifting 30–50 km away from cities, strict highway overloading rules (bricks weigh 3x blocks), labour cost increases, and GST since April 2022.
- Transport economics favour AAC blocks: The rate of red bricks is almost three times that of AAC blocks, so the transport cost differential is huge, strengthening the substitution case as fuel and compliance costs rise.
- New territories opened: Marketing has started in Nashik, Nandurbar, Madhya Pradesh (Indore, Dhar), and Rajasthan (Udaipur and other small towns), and the company is exploring opportunities to set up plants in North and South India to become a pan-India player.
- Customer base expanding: The company added new projects of Adani and added Reliance Life Sciences to its list of esteemed customers during the quarter.
- Event-led demand optionality: Management flagged that India might bid for the Commonwealth Games (2026, which Australia was planning to host) with Ahmedabad as the selected destination, and India will be bidding for the Olympics; either could create a jump in demand, though no timeline is committed.
Manish Saboo: "We just want the market to convert from red bricks to AAC blocks and to the upcoming capacities as well."
Sales Model & Pricing Architecture
- Two-tier distribution: In smaller towns, sales go predominantly through dealers; in big cities, the company sells directly to builders, contractors, and corporates. Marketing teams are deployed across Bombay, Pune, Vapi, Silvassa, Baroda, Ahmedabad, Indore, Rajkot, Nashik, Nandurbar, and Duliajan.
- Pricing tiers by customer type: Corporate customers such as Lodha and L&T receive roughly 2–3% lower prices than direct builders; dealer pricing on credit terms is similar to corporate pricing.
- Monsoon is manageable: Normal rains are manageable for operations; the Biparjoy Cyclone last quarter was the exception, affecting roughly a week to ten days of working in the North Gujarat region.
Carbon Credits & Other Income Streams
- Carbon credit applications in progress: The company has applied for carbon credits for the Ahmedabad Star Bigbloc subsidiary at GCC; for the Wada plant, paperwork is almost finalized and the application should be submitted soon.
- Volume target, not revenue: Management plans to generate 200,000–300,000 carbon credits every year, with 45,000–50,000 credits expected in the next two months at a current market price of \$3–\$5 per credit, but declined to give a revenue projection.
- Wada Phase II subsidy: The Wada plant carries a CAPEX subsidy of 60% (maximum ₹30 crores), spread over 10 years at ₹3 crores per year, released through interest subvention, electricity duty exemption, electricity rate deduction, and gross GST. Phase II expansion will commence after receiving the eligibility certificate, which takes roughly 45 days to 2 months.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Capacity utilization | Reach ~70% overall utilization | End of September '23 |
| Wada plant utilization | 65–70%+ utilization at Wada unit | Q3 FY24 onwards |
| Annual revenue growth | Approximately 30% increase | FY24 |
| EBITDA margin range | 20–25% sustainable | Long-term |
| Wada Phase II expansion | CAPEX ₹18–20 crores, capacity from 250k to 500k cubic meters | After eligibility certificate (45 days to 2 months) and reaching 70% utilization |
| JV construction start | Contractor finalized, construction begins | Next 10–15 days |
| JV commercial production | Greenfield unit operational | End of Q4 FY24 |
| JV utilization ramp | ~75% utilization | End of FY24; FY25 around 70–75% |
| Wholly-owned utilization | 80–85% on consolidated capacity of ~0.1 crore cubic meters | FY25 |
| Sales volume (next year) | ~7,50,000 to 8,00,000 cubic meters | FY25 |
| Quarterly utilization growth | Increase by at least 5–10% QoQ | Ongoing |
| Debt-equity ratio | Maintain between 1 and 1.5 | Ongoing |
| Carbon credit generation | 200,000–300,000 credits annually | Ongoing |
Key Metrics
| Metric | Q1 FY24 |
|---|---|
| Operating revenue | ₹54.9 cr, declined 1% YoY |
| EBITDA | ₹12.7 cr, grew 4% YoY |
| EBITDA margin | 23.13%, improved 115 bps YoY driven by decline in raw material prices |
| PAT | ₹6 cr, PAT margin approximately 10.75% |
| Revenue growth target (FY24) | ~30% YoY |
| EBITDA margin target (sustainable) | 20% to 25% |
| Total capacity | 825,000 cubic meters per annum including newly commercialized Wada plant |
| Capacity utilization (overall) | 65%, affected by lower utilization at newly commercialized Wada plant |
| Capacity utilization (legacy plants) | 85% to 90% for Umbergaon and Ahmedabad units |
| AAC block market share | 8% to 10%, versus red bricks at 85% plus |
| AAC block selling price | ~₹4,100 per cubic meter, red bricks at ₹4,500–₹5,000 per cubic meter |
| Rejection levels (company) | 4% to 4.5% at plant level; Wada plant expected below 2% |
| Carbon credits generated (Umbergaon) | ~60,000 credits annually; targeting 200,000–300,000 credits per year going forward |
| Carbon credits pending receipt | 45,000 to 50,000 credits applied up to November 2022, expected in next two months; market price ~\$3–\$5 per credit |
| Debt-equity ratio | ~1.1 as on FY23 balance sheet; target range 1 to 1.5 |