- ADD removal triggered a price war: The Ministry of Finance let anti-dumping duties on Chinese solar glass lapse in August 2022, forcing a ~13% domestic price cut to match a surge of cheaper imports.
- Margins collapsed on a cost-price squeeze: EBITDA margin fell ~1,000 bps YoY to 26.1% as input costs stayed high while selling prices dropped; management expects margins to stay low in Q3 before improving from Q4.
- Capacity expansion is the offset, but delayed: The 550 TPD third furnace is now expected in December 2022, a delay from earlier plans, while a fourth, larger 1,100-ton furnace has been approved but is 1.5–2 years away.
- Interfloat acquisition salvaged at a discount: After a fire and Europe's energy crisis deadlocked the original deal, Borosil restructured to acquire 86% for EUR0.75 crore (down from EUR3 crore cash) with reduced earn-out terms.
- What to watch next quarter: Whether the writ petition against the ADD decision gains traction, the pace of margin recovery as SG#3 ramps up, and any relief in European energy prices that could unlock Interfloat's potential.
The Anti-Dumping Duty Shock
- Duty lapsed, imports surged: The Ministry of Finance did not accept DGTR's recommendation to extend ADD on Chinese solar glass beyond August 17, 2022, rendering the countervailing duty on Malaysia ineffective as supply shifted back to China.
- Chinese pricing power hit directly: Lower domestic demand in China pushed FOB prices down, supported by 13% export subsidies, while a sharp drop in freight rates further reduced landed costs of imported glass into India.
- Domestic price cut was unavoidable: Borosil cut domestic selling prices by ~13% in September 2022 to stay competitive, even though average prices were still up over 18% YoY at ~INR139 per MM.
- Market share diluted by imports: Despite domestic demand growing 25–30% YoY, Borosil's domestic volume market share fell to ~22% because the incremental demand was met entirely by imports due to limited domestic capacity.
- Legal challenge underway: The company filed a writ petition in Gujarat court against the Ministry of Finance decision; the matter was listed for hearing on November 11, 2022.
Ashok Jain: "We are effectively dealing with them in that sense without an antidumping duty because the exports are coming from Malaysia and Vietnam."
Margin Compression & Cost Structure
- EBITDA margin halved YoY: Margins fell to 26.1%, down over 400 bps QoQ and ~1,000 bps YoY, driven by raw material inflation in soda ash and natural gas plus the September price cut, landing below the normalized 30% expectation.
- Input costs remain sticky: Gas prices are tied to the Ukraine-Russia conflict with no substantial relief expected soon, while new soda ash capacity is unlikely before end-2024, keeping that market tight.
- Cost-saving levers are partial: The company is altering batch mixes for raw material savings and using captive power generation, but these only mitigate, not offset, the inflation.
- Scale benefits incoming: Management expects ~3% cost savings from economies of scale when the third furnace commissions, contributing to the Q4 margin improvement narrative.
- Captive power to reduce electricity cost: A 10 MW solar-plus-wind captive plant (via SPV, 31% stake) is expected by December 2022, with plans for an additional 8 MW plant.
Ashok Jain: "So in this quarter, particularly, the margins are going to remain low. But Q4 onwards, some improvement can be expected in the margins."
Capacity Expansion: SG#3 and Beyond
- SG#3 delayed to December 2022: Global supply chain bottlenecks and heavy rains in Gujarat pushed commissioning back; once online, it adds 550 TPD, doubling total capacity to 1,000 TPD (equivalent to 6 GW).
- Fourth furnace approved, 1.5–2 years out: The board approved a 1,100-ton furnace plan; the company will observe the December expansion outcome, work on the plan in Q1 CY23, then proceed with a fund raise, targeting completion in 1.5–2 years.
- Fund raise of INR1,100 crore authorized: Shareholders approved the submission at the last AGM after a previous QIP approval expired; management will raise funds as and when necessary for the next phase.
- Domestic competitor capacity also delayed: Three competitor plants under construction are expected to add ~1,000 TPD, all slightly delayed and likely commissioning during calendar year 2023, still leaving total domestic supply short of demand.
Interfloat Acquisition: Restructured and De-risked
- Deal renegotiated after crisis: A fire from a gas leakage on July 31 and severe European gas prices deadlocked the original binding deal; the restructured terms saw the 86% shareholder exit for EUR0.75 crore (vs. EUR3 crore originally) and EBIT sharing reduced from 50% to 20%, with the remaining 14% shareholder retaining a call option after 4 years at 7x EBITDA.
- Furnace repaired, but life limited: The hot repair was completed and production resumed by August 22–23, but management cautioned that remaining furnace life cannot be expected to be very long and a proper cold repair must be done.
- Cold repair planned, disruption managed: Currently targeting February for the cold repair, with an estimated 60-day downtime (90 days total to restart); Borosil will supply glass from India to Interfloat's European customers during the outage.
- European energy cost exposure: Interfloat's EBITDA margin was just 5% in 9M CY22 due to extremely high energy prices; management sees positive signals from German government on capping energy prices for industry, which could restore decent margins.
- Strategic rationale intact: A local manufacturing presence in Europe positions Borosil to serve EU's ambition of 25 GW domestic manufacturing, while technology transfer (higher throughput, faster speeds) from India to Germany and new product capabilities from Germany to India create synergy.
Ashok Jain: "When the plant in Germany is taken for cold repair, we will be supplying goods from India to those customers, so that they are not starved off the material."
Demand Environment & Policy Tailwinds
- Domestic demand structurally robust: Solar glass demand grew 25–30% YoY in Q2, driven by domestic module manufacturing picking up after customs duty on module imports took effect from April 1, 2022.
- Project import route closed: The Union government shut the route that allowed circumvention of BCD on solar cells and modules by paying lower duties, which is expected to curb imports and boost domestic manufacturing and glass demand.
- PLI scheme mandates local sourcing: MNRE's second tranche guidelines (INR19,500 crore) include a component for local sourcing of ancillaries like solar glass, with higher incentive payouts for domestic procurement.
- Export markets favor India: Europe, USA, and Turkey are trying to reduce dependence on Southeast Asia; India gets preference over Malaysia and Vietnam under the China-plus-one strategy because those plants are effectively Chinese operations.
- Export share temporarily elevated: Export proportion is currently above the historical ~20% because export prices have been better and local prices decreased after the ADD removal.
Ashok Jain: "The Chinese manufacturers only have set up those Malaysian and Vietnam plants. So these are basically Chinese companies only, and they do not consider them as separate operation like India or like that. So in that sense, India gets a preference, even over Malaysia and Vietnam."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| SG#3 furnace commissioning | 550 TPD capacity addition, doubling total to 1,000 TPD | December 2022 |
| Captive power plant commissioning | 10 MW solar+wind plant via SPV (31% stake) | December 2022 |
| Margin recovery begins | Improvement from cost-saving efforts and SG#3 scale benefits | Q4 FY23 onwards |
| Fourth furnace plan finalization | Work on 1,100-ton furnace plan | Q1 CY23 |
| Fourth furnace completion | 1,100-ton furnace operational | 1.5–2 years from now |
| Interfloat cold repair | 60-day repair, 90 days total to production restart; glass supplied from India during outage | Targeting February |
| Next expansion review | Decision on effective steps for next phase | Q4 FY23 |
| ADD/basic customs duty relief effort | Seek relief to improve margins and reduce payback for next expansion | No timeline |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Net revenue from operations (standalone) | ₹169 cr, +5% YoY |
| H1 FY23 revenue | ₹339.2 cr, +14% YoY |
| EBITDA | ₹44.1 cr |
| EBITDA margin | 26.1%, down over 400 bps QoQ and ~1,000 bps YoY |
| H1 FY23 EBITDA margin | 28.1% |
| Profit before tax | ₹32.9 cr |
| Profit after tax | ₹24.3 cr, -26% YoY (₹34.1 cr in Q2 FY22) |
| H1 FY23 PAT margin | 16% |
| Average selling price (solar tempered glass) | ~₹139 per MM, +18% YoY, flat QoQ |
| Domestic selling price cut in September 2022 | ~13% |
| Sales volumes decline (Ind AS basis) | 11% YoY; actual decline ~2% |
| Export sales | ₹47.9 cr, 28.3% of turnover |
| Domestic volume market share | ~22% |
| Third furnace (SG#3) capacity addition | 550 tons per day, commissioning December 2022; total capacity to reach 1,000 tons per day (6 GW) |
| Interfloat Group revenue (9 months CY22) | €5.47 cr |
| Interfloat Group EBITDA margin (9 months CY22) | 5% |
| Local manufacturer price premium vs imports | ~10% currently, up from ~5% historically |
| Expected normalized EBITDA margin | 30% |