Key Takeaways
- 42% YoY revenue surge, margin doubled: Sales hit ₹378.88 crores consolidated, with EBITDA margin jumping to 33.2% from 19.9% YoY, driven by a 29% rise in average selling prices and production efficiencies.
- Interfloat impairment cleans up Europe: A ₹33.87 crore exceptional charge was taken against the German subsidiary, which has been shut since December 2024; management expects no further write-offs and will decide its fate next quarter.
- Demand outstrips supply by a wide margin: Domestic solar glass consumption is ~50 GW against installed capacity of just 18 GW, creating a multi-year import substitution runway even as 30 GW of new capacity is built by March 2027.
- Margins look sustainable at current levels: Management is "fairly confident" of holding the 33% EBITDA margin, supported by a captive power plant coming online this month and a 3% debottlenecking target.
- What to watch next quarter: The Interfloat decision (shut down or restructure), whether the seasonal December-March installation rush clears module-level inventory, and any update on the 4 GW expansion timeline.
Quarterly Performance & Profitability Levers
- Price-led growth: Average ex-factory selling prices rose to ₹147.5 per mm from ₹115 per mm YoY, contributing the bulk of the 42% sales increase; management indicated the current quarter run rate is "about the same."
- Productivity gains compound pricing: Production efficiencies improved alongside higher realizations, enabling both higher sales volume and better margins.
- 2mm glass dominates mix: 2-millimeter glass now constitutes 70% of production, with realization roughly equal to 3.2mm glass; the 2mm market is growing very rapidly.
- Cost-side tailwinds incoming: A group captive power plant will be commissioned by end of October 2025, delivering power cost savings; operational improvements in raw materials and coating materials are expected to add further efficiency.
- Debottlenecking adds 3%: Management is targeting about 3% improvement from debottlenecking, pushing back on an analyst's suggestion that the scope is an immaterial 5-10%.
- Other expenses spike, then normalize: Other expenses rose to ₹72 crores from ₹62 crores QoQ due to one-time items including sales support services and overseas legal/audit fees for the GMB insolvency; management expects some cut-down going forward.
- Inventory cleared at quarter-end: The warehouse was completely empty at March 31; the company maintains very low month-end inventory as a practice, though some module-level inventory built up from mid-September due to GST reduction holdbacks and monsoon delays.
Ashok Jain: "Their margins have been quite robust in that sense and their ROCE is quite robust. It's almost 60% to 80% in many cases, return on capital employed. So obviously, this is not a normal margin on a sustainable basis."
Interfloat & European Restructuring
- GMB shutdown triggered the crisis: Interfloat Corporation lost its customer base after annealed glass production ceased at GMB, Germany from 31st December 2024; fierce competition drove customers to demand prices too low to cover fixed operational costs.
- Impairment taken, no further bleed expected: ₹33.87 crores was impaired out of a total exposure of ₹57.59 crores; provisions cover customer claims under European law for delayed or non-delivery after the abrupt production halt. The remaining amount is expected to be recoverable as Interfloat holds cash and owes amounts to Borosil.
- Overseas losses shrink sharply: Overseas subsidiaries' negative EBITDA reduced to ₹7.71 crores from ₹24.43 crores QoQ, including provisions for customer claims from past business that no longer exists.
- Decision imminent: Management will decide by next quarter whether to cut further costs or shut Interfloat operations entirely; they are first assessing if any profitability improvements are possible.
P. K. Kheruka: "This has left Interfloat with a highly reduced demand, which is insufficient to pay for its fixed operational costs."
Demand & Industry Structure
- Domestic demand robust and growing: Solar installations in FY26 are expected at ~35 GW, translating to module and glass consumption of ~50 GW, up from 25 GW the prior year; demand is expected to grow even higher.
- Import substitution is the core thesis: Imports occupy ~70% of domestic consumption, leaving a huge runway for capacity addition even as new supply comes online.
- Capacity still lags demand through FY27: Total capacity is expected to reach 48 GW by March 2027 (18 GW existing + 12 GW Reliance + 12 GW Borosil/Vishakha + 6 GW others), still below the current 50 GW demand that is itself growing; Reliance's green hydrogen demand has not yet been factored in.
- Seasonal pattern favors H2: The last four months of the financial year (December to March) see very quick and high installations; module-level inventory built up from mid-September is expected to clear during this period.
- Policy tailwind intact: The ALMM mechanism for modules, implemented from April 2024, has increased demand for all components including solar glass; large-scale utility projects, PM-KUSUM, and PM Surya Ghar Yojana rooftop installations provide additional demand visibility.
- Exports are opportunistic, not strategic: Exports rose to ₹45.61 crores (12.1% of turnover) from ₹34.62 crores QoQ; the company accepts export orders only for specialized products that command better pricing, with a normal range of 7-10% of turnover.
Pradeep Kheruka: "We do believe that we are in an industry which is a sunrise industry and very large scope for growth in this industry and we are -- we hope that all investors will continue to flourish those who have invested in renewables."
Competitive Position & Pricing
- Unit-cost competitive vs China: Management measures competitiveness in units of consumption per unit of output, not rupee cost, and claims Borosil is more competitive than Chinese producers on this basis; Chinese advantage comes entirely from subsidies, not lower production cost.
- 2mm fully tempered glass as differentiator: Borosil successfully manufactured fully tempered 2mm glass that Chinese producers could not replicate; the company is in discussions with module makers to adopt this as a differentiated product.
- Realization stable at elevated levels: The ₹147.5 per mm average selling price appears sustainable; management said the current quarter run rate is "about the same" but declined to quantify further upside potential.
- Module-maker margins signal headroom: Per management, module manufacturers are earning ROCE of 60-80%, which they characterized as unsustainable, implying glass pricing may have room before customer resistance bites.
Pradeep Kheruka: "We are more competitive than them. We are not less competitive than them. The thing is they are subsidized in a very, very big way. And because of that subsidization that they are selling at a lower price, it has nothing to do at all with any specialized lower cost of production or anything like that."
Capacity Expansion & Capital Allocation
- 4 GW expansion on track: Work on the company's own expansion project is progressing as per schedule; the new 600 TPD furnace is a large capex requiring significant management time and skilled manpower.
- Industry adding 30 GW by FY27: Another 12 GW of capacity, primarily captive by a new producer (Reliance), is expected by end of FY26, with a further 16 GW by December 2026 from existing players including Borosil's 4 GW.
- Reliance timeline may slip: Industry circles feel Reliance's production, officially expected by March 2026, might be delayed until June 2026.
- Disciplined, not aggressive, on capex: Management acknowledged an analyst's suggestion to accelerate capex given strong demand and long lead times, but emphasized sticking to the current plan: "we would rather do what we think we can manage rather than stretching too far and then landing in the soup."
- Inorganic options open but not active: The company is open to acquisition opportunities and has a track record of buying and turning around companies, but sees no willing sellers at this stage; greenfield expansion at the existing location offers economies of scale and management efficiencies.
- No module manufacturing entry: Despite considering it seriously from time to time, management confirmed they are not looking at module manufacturing at this time.
Pradeep Kheruka: "At the moment, you see, we are sticking to this because it's not a question of money. You need people. Ours is a very highly skilled operation... we would rather do what we think we can manage rather than stretching too far and then landing in the soup."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| EBITDA margin sustainability | Confident to sustain at 33% level | Ongoing |
| Captive power plant commissioning | Deliver cost savings on power | End of October 2025 |
| Debottlenecking improvement | ~3% efficiency gain | Not specified |
| Interfloat decision | Either cut further costs or shut operations | Next quarter or so |
| No further European write-offs | Remaining Interfloat exposure expected recoverable | Through FY26 |
| 4 GW capacity expansion | Work in progress as per schedule | Not specified |
| Other expenses normalization | Some cut-down expected from ₹72 crore Q2 level | Coming quarters |
| Industry capacity: Reliance | 12 GW expected online | March-June 2026 |
| Industry capacity: Borosil + Vishakha | 12 GW expected online | By December 2026 |
| Total domestic capacity | ~48 GW expected | By March 2027 |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Standalone revenue | ₹378.44 cr, +42% YoY and +14% QoQ |
| Standalone EBITDA | ₹125.5 cr, +137% YoY and +36% QoQ |
| Standalone EBITDA margin | 33.2%, vs 19.9% YoY and 27.8% QoQ |
| Consolidated revenue | ₹378.88 cr, vs ₹346.58 cr QoQ |
| Consolidated EBITDA | ₹120.42 cr, vs ₹69.28 cr QoQ |
| Average ex-factory selling price | ₹147.5 per mm, vs ₹115 YoY and ₹138.12 QoQ |
| Capacity utilization | 991 tons per day, vs 942 tons per day QoQ, out of 1,000 tons per day capacity |
| Exports | ₹45.61 cr, 12.1% of turnover vs 10.4% QoQ |
| 2mm glass share of production | ~70%, rest is 3.2mm |
| Overseas subsidiaries net revenue | ₹18.65 cr, vs ₹32.77 cr QoQ |
| Overseas subsidiaries EBITDA | negative ₹7.71 cr, vs negative ₹24.43 cr QoQ |
| Interfloat impairment provision | ₹33.87 cr out of total exposure of ₹57.59 cr, booked as exceptional item |
| Provisions for Interfloat customer claims and GMB dues | EUR 354,000 (customer claims) and EUR 551,000 (due from GMB) |
| Preferential issue proceeds received | ₹371.49 cr, allotment of 69,43,691 equity shares on 17 Oct 2025 |
| Domestic solar module manufacturing capacity | 110 GW currently, expected to rise to 150 GW by March 2027 |
| Expected FY26 solar installations | ~35 GW, implying modules/glass consumption of ~50 GW vs 25 GW previous year |