Key Takeaways
- Revenue held back by job work mix, not demand: Q2 revenue grew 8.5% YoY but ~45% of H1 execution was job work where customers supplied material, suppressing reported topline. Management is "quite confident" of hitting the full-year ₹1,500 cr target.
- Margins jumped on mix and operating leverage: EBITDA margin expanded from 16.3% to 20.1% YoY, driven by higher utilization at Anjar and the seamless pipe plant, a richer power-sector mix in piping, and improved non-core tariffs.
- Order book nearly doubled, with private-sector diversification accelerating: Order book up 94% YoY to ₹2,531 cr; H1 inflow up 97% YoY. Siemens orders are now regular, and very large Adani and JSW orders are in advanced finalization, reducing the historical BHEL/L&T dependency.
- Nuclear and seamless pipe bets are now under construction, not just on slides: A dedicated nuclear piping plant is being built, a global JV is targeted for closure by FY27-end, and the 7,000-tonne seamless pipe plant is fully operational and expected to contribute meaningfully in H2.
- What to watch next quarter: Whether the promised H2 mix shift to >70% with-material orders materializes and pulls reported revenue sharply higher, whether the Adani/JSW orders convert by January, and whether the GE HRSG purchase order finally arrives.
Revenue Mix: The Job Work Drag and the H2 Inflection
- Job work spike suppressed topline: H1 job work hit 40–45% of execution because BHEL, L&T and Dow orders were on full focus and had to be completed. Since customers supply material in job work, reported revenue is materially lower than it would be for the same tonnage of with-material work.
- Customer priority, not choice: Management framed the job work concentration as a customer-service decision: L&T and BHEL told the company those orders were their priority, so with-material jobs were kept on the back burner.
- BHEL job work nearly done: BHEL power sector job work orders are almost at the finishing end; L&T job work will continue in H2.
- H2 mix shift expected to unlock reported revenue: Management expects H2 to shift to more than 70% with-material orders and around 30% job work. When high-value with-material orders hit the shop floor and are dispatched, revenue can run 40–50% higher even though tonnage increases only ~20%.
- October was lean, December onwards the ramp: October execution was ~₹80 cr; from December, numbers are expected to move at a much higher pace.
- Fixed-cost leverage amplifies the PAT story: Fixed expenses are not expected to increase substantially over the next six months; a 40–50% revenue increase therefore drops fixed-cost allocation sharply in percentage terms, flowing directly to EBITDA and PAT.
Bansal: "All the job work orders which we had from L&T and from BHEL, we are continuously doing it because they have told us that, that is their priority. So, you know, we have to fulfil their priority and that's why, you know, we have to keep some of the with material jobs on the back burner. Of course, that's a loss to us but, you know, our focus has always been and will always continue to be to support the requirement of our customers."
Order Book & Customer Diversification
- Order book nearly doubled, inflow outpacing execution: Order book stood at ₹2,531 cr, up 94% YoY; H1 order inflow of ₹1,179 cr was roughly twice H1 execution.
- Siemens now a regular customer: The company has started getting orders from Siemens on a regular basis, with two orders in the last two to three months and another under discussion. Management expects a minimum of 25–30 million Euros of business, mostly gas turbine work with some HRSG portion.
- Adani and JSW: very large orders in advanced finalization: Both are in very advanced stages; things should materialize "maybe by December end or latest by January or February." One customer has decided to go with material, the other may be material or job work.
- BHEL tender pipeline slow but bunching expected: BHEL's process is extremely slow; tenders are getting ready and expected to float "maybe after one or one and even still after two months." Some bunching of orders is expected in FY28. [5-6]
- GE LOI still in the book, no conversion yet: The ~₹400 cr GE letter of intent remains in the order book but has not converted to a purchase order. Management says GE is talking about releasing a formal PO for two units "anytime, maybe within a month or two," but execution will happen next year only.
- Nooter frame agreement not counted: Orders under the Nooter frame agreement for the Thailand plant, where 60% of capacity is reserved, are not included in the order book.
- Execution discipline over book size: Management explicitly prioritizes on-time execution and customer confidence over inflating the order book number.
Bansal: "We just cannot now be 100% dependent upon BHEL or L&T. So, you know, we have already developed a very strong relationship, you can say, or, you know, we are in a very strong footing with other private players where the volumes are bigger."
Margins: The Mix and Leverage Story
- EBITDA margin expanded 380 bps YoY: Q2 EBITDA margin reached 20.1%, up from 16.3% a year ago.
- Three drivers: Operating leverage from higher utilization at the Anjar facility and seamless pipe plant with a largely stable cost base; better mix with a higher share of power sector orders in piping and fitting, where margins are superior; and higher contribution from the non-core business supported by improved tariffs at the Malwa power plant and biomass pellet operations.
- Job work carries5–10% higher margins: Management stated that job work orders carry5–10% higher margins than full-material orders, and the40% jump in job work mix is "exactly in line" with expectations.
- Fixed-cost operating leverage is the H2 story: Fixed expenses are not going to change materially; if turnover increases40%, only variable expenses rise, creating "huge potential for improved EBITD."
- Pellet plant losses dropping: Losses have "dropped drastically"; the company has now procured raw material for almost the entire year, and weather conditions are conducive for good-quality production through April–May.
- PAT growth of31.8% YoY aided by lower finance costs: Finance costs declined sequentially from ₹17.2 cr to ₹15.3 cr because ₹225 cr of debt was repaid from preferential issue proceeds.
New Engines: Seamless Pipes, Nuclear, and Data Centers
- Seamless pipe plant now fully operational: The7,000-tonne plant at Anjar is fully streamlined, processes are set up, and goods are being made. It is expected to start generating meaningful revenue from H2, initially all for captive use plus some direct supply orders such as an L&T pipe supply order.
- Seamless plant FY28 ambition: Management targets ~₹300 cr revenue in FY28, split roughly between ₹150–200 cr direct and ₹150–200 cr captive, at almost full capacity utilization. One or two more machines may be added depending on order inflow.
- Nuclear piping JV targeted for FY27-end closure: Talks with a global partner are at an advanced stage; a dedicated nuclear piping manufacturing facility at Anjar is already under construction, with basic infrastructure building started and some machines ordered and arriving.
- Framework agreement for domestic nuclear projects: Signed on16 October with a domestic EPC contractor to jointly pursue nuclear projects across PHWR, light water and small modular reactors, with scope limited to shop-manufactured piping.
- Nuclear revenue ramp is slow, margins are high: FY28 nuclear revenue is expected at ~₹50–60 cr, FY29 at ~₹200 cr at most, because material deliveries take a lot of time. Margins may exceed25%.
- Data center piping: early-stage discussions: The company met last month with a "very big US player" trying to automate data center piping and is discussing a back-to-back arrangement as a partner.
- FY30 ambition of ₹2,500 cr excludes nuclear: The ₹2,500 cr revenue ambition for FY30 does not include any nuclear contribution.
Bansal: "You get a lot of margin in that, but at the same time, the conversion into revenue is very, very slow."
Non-Core & Balance Sheet
- Biomass pellet plant had first near-full quarter: The72,000 MTPA plant at Muktsar operated at near-full capacity in Q2; new fuel became available from October.
- Non-core revenue on track for ~₹80 cr this year: Management expects to run both plants fully in H2.
- Malwa power plant tariff improved: The improved tariff of ₹5.44 per kWh supported the non-core segment.
- Debt repaid, finance costs declining: ₹225 cr of debt was repaid from preferential issue proceeds, bringing finance costs down sequentially from ₹17.2 cr to ₹15.3 cr.
- Inventory days improving: Dropped from223 days in H1 to188 days; debtor days increased slightly last quarter, causing a small working capital increase.
- Working capital target: By year-end, working capital days should reach ~225–240 days, with a target of200 days.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY27 revenue | ₹1,500 cr; management "quite confident" and "sure" | FY27 end |
| FY27 EBITDA margin | 19%+; management "100% stand by that" | FY27 end |
| H2 execution mix | >70% with-material, ~30% job work | H2 FY27 |
| Non-core revenue | ~₹80 cr | FY27 end |
| FY28 revenue | ₹1,800 cr; "firmly committed" | FY28 end |
| Seamless plant FY28 revenue | ~₹300 cr (₹150–200 cr direct, ₹150–200 cr captive) | FY28 end |
| Nuclear JV closure | Closure expected | FY27 end |
| Nuclear revenue FY28 | ~₹50–60 cr | FY28 end |
| Nuclear revenue FY29 | ~₹200 cr at most | FY29 end |
| Adani/JSW order finalization | "Maybe by December end or latest by January or February" | Dec 2025–Feb 2026 |
| GE HRSG purchase order | GE talking about releasing formal PO for two units "anytime, maybe within a month or two"; execution next year only | PO: 1–2 months; execution: FY28 |
| Working capital days | ~225–240 days by year-end (target 200) | FY27 end |
| Siemens business | Minimum 25–30 million Euros | Ongoing |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Revenue from operations | ₹293 crores, up 8.5% YoY |
| Operating EBITDA | ₹58.9 crores, up 33.7% YoY |
| Operating EBITDA margin | 20.1%, compared with 16.3% in Q2 FY26 |
| Profit after tax | ₹23.5 crores, up 31.8% YoY |
| PAT margin | 8% |
| Finance costs | ₹15.3 crores, down from ₹17.2 crores in Q1 FY27 |
| H1 FY27 revenue from operations | ₹587.4 crores, up 19% YoY |
| H1 FY27 operating EBITDA | ₹108.6 crores, up 35.9% YoY |
| H1 FY27 EBITDA margin | 18.5%, compared with 16.2% in H1 FY26 |
| H1 FY27 PAT | ₹39.5 crores, up 27.8% YoY |
| FY27 revenue guidance | ₹1,500 crores, management confident of achieving |
| FY27 EBITDA margin guidance | 19% plus, management stands by the guidance |
| Order book as of 30th September 2026 | ₹2,531 crores, up 94% YoY from ₹1,308 crores |
| Order book as of 31st October 2026 | ₹2,586 crores, after October inflow of ₹148 crores |
| H1 FY27 order inflow | ₹1,179 crores, up 97% YoY from ₹598 crores in H1 FY26 |
| Piping order book, power segment | ₹1,476 crores, over 60% of piping order book |
| Piping order book, oil and gas segment | ₹871 crores |
| Job work share of H1 execution | ~45% of revenue, versus historical ~25–30% |
| Debt repaid from preferential issue proceeds | ₹225 crores |
| Non-core revenue expectation for FY27 | ~₹80 crores |
| Seamless plant FY28 anticipated revenue | ~₹300 crores, split roughly equally between direct sales and internal consumption |
| FY28 revenue guidance | ₹1,800 crores, firmly committed; management sees potential to surpass |
| Nuclear revenue projection for FY28 | ~₹50–60 crores, very small initial portion |
| Nuclear revenue projection for FY29 | ~₹200 crores at the most |
| Export mix | Above 60% currently, may moderate to ~55% |
| Inventory days | 188 days in H1 FY27, down from 223 days in H1 FY26 |
| Working capital days target by year-end | ~225–240 days |