Key Takeaways
- A quarter defined by execution delays, not demand destruction: Revenue fell 22.7% YoY as three large projects slipped, but management frames these as timing issues now resolving, with substantial revenue spilling into Q4.
- FY26 guidance offered for the first time: Top line of INR1,100 crores and EBITDA margins of 19–20%, anchored on a dedicated oil & gas facility now online and an order book weighted toward routine, executable work.
- Capacity build-out reaches an inflection point: The Anjar 2 facility was commissioned in January 2025, and total capacity is on track to hit 30,000 metric tons by October 2025, supporting a stated capability to execute INR2,500 crores of orders once both facilities are fully operational.
- Management owned the communication gap: The leadership apologized for not guiding earlier on Q3 weakness, acknowledged being new to public markets, and committed to timely disclosure going forward, positive or negative.
- What to watch next quarter: Whether the INR260–270 crores Q4 revenue target materializes, confirming the spillover thesis, and whether the INR1,700 crores pipeline, particularly thermal orders from BHEL and L&T, begins converting.
What Went Wrong in Q3
- Three project delays converged: A large, first-of-its-kind project originally due for completion by March 2025 saw its timeline slip to June 2025 because the company underestimated pitfalls around drawing availability for the assembly phase. An international order over INR51 crores was pushed from Q3 to Q4 after the customer revised material specifications late. INR60 crores of Assam plant orders were delayed by late client drawings and first-year stabilization challenges in the Northeast.
- The switching problem: Large orders require capacity to be reserved six months in advance with matching materials. When the delayed projects stalled, the company could only fill the gap with very small orders because alternative large jobs with matching material and drawings were not sitting in queue. Raw material was manufactured and held as WIP, inflating inventory and working capital.
- New facility commissioning also slipped: The Anjar 2 plant, a 9,000 metric ton expansion, was delayed over six months by unprecedented rains in the Kutch region and a dispute between mine owners and the state government that made construction materials unavailable. This pushed out the lean manufacturing benefits that were supposed to offset fixed costs.
- The P&L hit: The revenue shortfall combined with negative operating leverage, higher material handling costs at the not-yet-lean Anjar facility, and increased working capital produced a loss of INR13 crores for the quarter.
Krishan Lalit Bansal: "Since this was first of its kind project, that's why it got delayed. Otherwise, once if we are talking of normal power plant jobs or normal oil and gas jobs, we are fully equipped to handle such sort of emergencies. But since this was first of its kind, we were also not very much aware that what could be the pitfalls in this particular job."
The Spillover Thesis: Why Q4 and FY26 Look Different
- Substantial Q4 revenue already locked: Management guided for INR260–270 crores of revenue in Q4, implying an EBITDA margin of 19–20% for the quarter to achieve the full-year average of 15–16%. The expenses for the delayed projects have already been incurred, and execution on the assembly portion began the day drawings arrived.
- The delayed large project is finishing: The first-of-its-kind project will see substantial revenue booked in Q4, with the job completing in Q1 FY26. No similar risks exist in the remaining order book, which management describes as routine orders with standard metallurgy and sizes.
- Anjar 2 is now online and pre-booked: Commissioned toward the end of January 2025, the facility is dedicated to oil and gas process industries and already has its full first-year revenue booked from a single customer, Dow, for around INR350 crores. Management expects margins to materially improve starting Q1 FY26 as this dedicated facility drives cost savings and operating leverage.
- Assam plant stabilized: After a longer-than-expected first year, the Northeast facility is now stable and expected to be fully utilized in FY26.
Capacity Build-Out and the INR2,500 Crore Ambition
- The expansion roadmap: Total capacity rises from 15,000 metric tons to 30,000 metric tons per annum by October 2025, with a further 15,000 metric tons in process piping solutions added over the next nine months. A high-wall seamless thickness pipe plant for backward integration in the power sector is on schedule for commercial production by January 2026.
- Plant specialization logic: The older Palwal facility will focus on power sector jobs, with capacity to execute INR800–1,000 crores of such work. The new Anjar 2 plant is dedicated to oil and gas, with proximity to Kandla port reducing logistics costs significantly. This segregation is the core of the margin expansion story.
- The INR2,500 crores capability claim: Management stated that when both facilities are fully operational by December 31, 2025, the company will have the capability to execute around INR2,500 crores worth of orders. This is a capacity statement, not a revenue forecast.
- Pipe plant economics: The backward-integration pipe plant, a INR90 crores investment, is expected to generate raw material worth around INR200 crores in its first fiscal year, feeding power sector jobs at Palwal. Asset turnover is roughly 2x initially.
Krishan Lalit Bansal: "Sir, I will put it in some different way that when both the facilities are operational, which we are saying that by 1st of January or by let us say, 31st of December '25, capability shall be that we shall be able to execute almost around INR2,500 crores worth of orders. I'm saying it will be our capability to do that."
Order Book and Pipeline
- Current order book is executable: The backlog consists of routine orders with no special metallurgy or unusually large sizes. Normal execution cycle is 6 to 18 months, and management has a clear target of executing around INR1,150 crores from the current order book in FY26.
- FY25 order intake concentrated in oil & gas: Orders booked during the fiscal year are predominantly from oil and gas, headlined by the Dow and Numaligarh orders cumulatively worth INR700 crores, plus INR150-odd crores from the power sector for export orders. Management did not have the full 9M order intake breakdown available on the call.
- INR1,700 crores pipeline described as low-hanging fruit: This includes INR600–700 crores from the power sector, with formal thermal inquiries expected in April and orders finalized by June. The company is already L1 on one small BHEL order. First thermal shipments would take 6–7 months, so billing starts in Q4 FY26.
- New customer conversations at scale: The company is in discussions with Reliance, Air Products, Linde, Adani Petrochemicals, and Nayara for the first time on a massive scale, though no orders have been announced.
- Thermal execution is FY26 upside, not base case: Management stated the company already has sufficient order book for FY26, so thermal orders would be a bonus. Thermal execution begins only in H2 FY26.
Margin Bridge and Guidance
- The margin reset: Full-year FY25 EBITDA margin is guided to 15–16%, implying a sharp Q4 recovery to 19–20% as spillover revenue lands and operating leverage returns. FY26 is guided at 19–20% EBITDA margin, driven by the dedicated Anjar 2 facility coming online, logistics savings from Kandla port proximity, and a shift toward routine, higher-margin execution.
- Threefold revenue ambition stands: Management reaffirmed its 3–5 year guidance of a threefold revenue increase, though no interim milestones were provided.
- FY26 guidance will be refined: The company stated it will provide formal guidance for the next fiscal year within the coming six months.
Governance, Communication, and Risk
- Management apologized and committed to transparency: The leadership acknowledged that not guiding earlier on Q3 weakness was a mistake stemming from inexperience in public markets. They committed to providing timely information going forward, whether positive or negative.
- Succession is in motion but undated: The company is professionally managed with a CEO, CFO, and departmental heads at VP/AVP/GM level. A group trust has been formed to manage the company in the future, and the second generation, the promoter's co-daughters, are fully involved in the business. No specific timeline was given.
- US tariff exposure is ambiguous: Existing tariffs have never impacted the business, and the company attributes its export competitiveness to a low-cost country profile. However, management could not say definitively that future tariffs would have no impact.
- Data gaps on the call: Management was unable to provide the 9M and Q3 order intake breakdown by end-user industry, or the precise mix between product sales and job works in the outstanding order book, promising to share the data later. A discrepancy on net debt, clarified as INR425 crores including lease liabilities, was resolved during the call.
Krishan Lalit Bansal: "I will make sure that everybody has the right information at the right time, even if it is plus or even if it is minus. It is my assurance to you. And it's my 100% conviction that we are 100% on track and we are bound to give the value for your money."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY26 revenue | Top line of around INR1,100 crores | FY26 |
| FY26 EBITDA margin | 19% to 20% | FY26 |
| Q4 FY25 revenue | INR260–270 crores | Q4 FY25 |
| Full-year FY25 EBITDA margin | 15% to 16% | FY25 |
| Delayed large project completion | Substantial revenue in Q4, job finished in Q1 | By June 2025 |
| Anjar 2 capacity addition | Additional 15,000 metric tons in process piping | Next 9 months (by ~Oct 2025) |
| High-wall pipe plant commercial production | Backward integration for power sector | January 2026 |
| Total capacity target | 30,000 metric tons per annum | October 2025 |
| Assam plant utilization | Fully utilized | FY26 |
| Thermal order billing start | First shipment 6–7 months after order finalization | Q4 FY26 |
| FY26 formal guidance | To be provided | Within 6 months |
Key Metrics
| Metric | Q3 FY25 |
|---|---|
| Operating income | ₹162 cr, -22.7% YoY |
| Operating income (9M FY25) | ₹541 cr, -0.8% YoY |
| Net profit / loss | Loss of ₹13 cr in Q3 FY25 |
| FY26 revenue guidance | ₹1,100 cr |
| FY26 EBITDA margin guidance | 19% to 20% |
| Q4 FY25 revenue guidance | ₹260 cr to ₹270 cr |
| FY25 full-year EBITDA margin guidance | 15% to 16% |
| Order book | ₹1,400 cr as of 31 December 2024 |
| Order book execution cycle | 6 to 18 months |
| Gross debt | ₹390 cr |
| Net debt | ₹425 cr, including ₹21 cr of lease liability |
| Total capacity (Anjar facility 2 commissioned) | 15,000 metric tons, expansion of 9,000 metric tons commissioned end of January 2025 |
| Target total capacity | 30,000 metric tons by October 2025 |
| High-wall thickness pipe plant capex | ₹90 cr, commercial production expected January 2026 |
| Order pipeline | ₹1,700 cr, of which ₹600 cr to ₹700 cr from power sector |