Key Takeaways
- Seasonal volume dip, steady demand: Q1 production and sales fell to 164k and 158k tons from Q4's 178k, a normal H1 pattern driven by government spending cycles. Management sees ample demand and no change in the last 3–4 months.
- Margin squeezed by coal, not demand: EBITDA margin slipped to 12.88% as coking coal costs averaged ~Rs.30,000 per ton; the $670+ price spike was called an "aberration" and prices have since crashed below $230.
- Realization jump offsets cost pressure: Net realization rose ~10% QoQ to ~₹65,000 per ton, and management does not anticipate difficulty passing through raw material costs because the entire industry faces the same input bill.
- Capex cycle is now live: Orders and LCs are placed for debottlenecking and a ~1 lakh ton addition at Srikalahasti; significant spend hits from Q3, funded 1:1 with debt, and completion is targeted by March 2024.
- What to watch next quarter: Whether Q2 realizations, flagged as marginally lower than Q1, compress margins further before the mid-Q2 coal-cost relief arrives, and the pace of capex spend execution.
Volume & Demand Environment
- H1 seasonality confirmed: Q1 and Q2 are structurally slower because demand is driven by state and central government spending, which is back-loaded. Management agreed with a 40–45% H1 / 50–55% H2 split and said a 50–50 assumption is safe with minor variation.
- Demand drivers intact: The Jal Jeevan Mission (tapped water to every household by 2024) is on track, irrigation is shifting from canals to pipes, and city expansion is adding demand. Management does not foresee any problem selling whatever is produced.
- DI pipe structural preference: DI pipes are expected to remain the preferred choice for water conveyance due to 70+ year durability, ease of laying, low maintenance, and overall cost advantage when factoring in land, digging, and water wastage. DI pipe cost is estimated at 70–80% of total pipeline project cost.
- Capacity running hot: The company has been operating at or near 100% capacity and is confident of achieving ~95–100% utilization for the full FY23.
Management: "One side of the canal if they pump 1 TMC water by the time it reaches the end it will be only 0.2 because there is pilferage, evaporation, drawing by people along the route. Now once you put the pipeline where will not be seepage or anything. I TMC put inside it will reach 0.9 TMC on the other side irrespective of the distance."
Margins & Raw Material Dynamics
- Coal cost trajectory: Q1 average coking coal cost was ~Rs.30,000 per ton. Q2 cost is expected to be slightly higher because the price decline starting June will only impact inventory from mid-Q2. The $670–$680 peak was described as an aberration; prices are now ~$230.
- Realization provides a buffer: Net realization rose ~10% QoQ to closer to ₹65,000 per ton. Q2 orders are at marginally lower realization than Q1, but Q2 is still expected to be a reasonable quarter compared to the prior-year Q2.
- Pass-through confidence: Management does not anticipate great difficulty in getting price revisions if raw material prices rise, because the entire DI pipe industry operates on the same raw materials and no one can supply at a loss.
- Iron ore stable: Iron ore prices have been in a narrow range, and inventory is valued closer to Q4 prices.
Management: "So, $670-$680 was more of abberation."
Exports
- Export mix steady: Q1 exports were 33,000 tons (~21% of sales). FY2022 exports were 133,000 tons (22% of total volumes). Exports typically contribute 20–25% of total volumes, with demand varying by region but balancing out overall.
- Export profitability higher but lumpy: Export realization is higher than domestic, and EBITDA per ton on exports is higher than domestic, though the quantum varies quarter to quarter. Costs are also higher due to country-specific specifications, coatings, and product mix.
- Srikalahasti export progress slow: Plant-based approvals for exports from Srikalahasti are in mind but progress is slow because domestic demand in southern India is being met by that unit. The plant has already started exporting to Singapore.
Capex & Capacity Expansion
- Orders placed, spend imminent: Orders have been placed and LCs opened for equipment for the capacity enhancement program: debottlenecking at the Electrosteel plant plus ~1 lakh ton capacity addition at Srikalahasti. Significant expenditure is expected from Q3 onwards.
- Srikalahasti ramp-up: The existing 4-lakh-ton capacity at Srikalahasti is fully operational and achieving 100% capacity utilization. Expansion from 4 lakh tons to 5.5 lakh tons is progressing monthly and will be completed by March 2024, with full production of 5.5 lakh tons by April 2024.
- Funding structure: Capex will be funded with debt in a 1:1 ratio. Some part of debt for capex will come in and some part due for repayment will be paid down. Management stated the upcoming capex will not involve very significant debt.
- Long-term debt trajectory: Long-term debt has a payment schedule and will gradually come down; over a two-to-three-year period, the debt number will reduce significantly.
Financial Details
- Finance cost rising: QoQ finance cost rose ~Rs.10 crores mainly due to higher working capital utilization and industry-wide interest rate increases from repo rate hikes. Average cost of debt rose to ~7.75% from the March quarter. Forex impact is minimal as foreign currency loans are mostly hedged.
- Other income boost: Q1 other income of ~Rs.22 crores was driven by interest income, export incentives, and a dividend received from a subsidiary.
- Consolidated profitability gap: Consolidated profitability is lower than standalone because Ind AS requires knocking out unrealized profit on inventory held by overseas subsidiaries operating on a stock-and-sale basis.
- Employee cost comparison caveat: Employee benefit expense rises disproportionately on consolidation because employee cost is linked to production, not sales; comparing it to topline is not appropriate.
Management: "The employee cost goes up, down only on production. It is not on topline or sales. I just giving an example a company 50,000 tons and sells only 25,000 tons then based on the sales, the figures will not go up or go down, correct? So, you cannot compare with the topline."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Capacity utilization | Achieve ~95%–100% for full FY23 | FY23 |
| Capacity enhancement completion | Debottlenecking + Srikalahasti expansion to 5.5 lakh tons completed | March 2024 |
| Srikalahasti full production | 5.5 lakh tons production run-rate achieved | April 2024 |
| Long-term debt reduction | Debt number to reduce significantly | 2–3 years |
| Capex funding ratio | Debt taken in 1:1 ratio; will not involve very significant debt | Through capex cycle |
| Q2 coking coal cost | Closer to Q1 or slightly higher; benefit of price decline hits inventory from mid-Q2 | Q2 FY23 |
| Q2 performance | Reasonable quarter compared to prior-year Q2, though realizations marginally lower than Q1 | Q2 FY23 |
Key Metrics
| Metric | Q1 FY23 |
|---|---|
| Total income | ₹1,751 cr, up ~72% YoY |
| EBITDA | ₹226 cr, up ~48% YoY |
| EBITDA margin | 12.88% |
| Net profit after tax | ₹104 cr, up ~95% YoY |
| PAT margin | 5.93% |
| Net realization | ~₹65,000 per ton, higher by ~10% vs Q4 FY22 |
| DIP production | 164,000 metric tons vs 131,450 metric tons in Q1 FY22 |
| DIP sales volume | 158,000 metric tons vs 128,000 metric tons in Q1 FY22 |
| Export sales volume | 33,000 metric tons, ~21% of total sales |
| Export sales value | ~₹250–260 cr |
| Pig iron sales | higher by ~20% vs Q4 FY22 |
| Order book | ~4 months, realization lower than Q1 FY23 |
| Net debt | ~₹2,200 cr |
| Long-term debt | ~₹1,050 cr |
| Average cost of debt | ~7.75%, up from March quarter |