Key Takeaways
- Soft quarter from a planned shutdown: Total income fell 4.6% YoY as a 7-day blast furnace maintenance shutdown extended longer than expected, dragging volumes and EBITDA margin down 82 bps to 15.6%.
- H1 tells the real story: First-half total income rose 6.5% YoY, EBITDA surged 31.8%, and PAT grew 52.8%, showing the underlying business momentum before the Q2 disruption.
- Volume guidance trimmed on two fixable delays: Full-year volume is now at the lower end of 8–8.5 lakh tons, pulled down by slower-than-expected blast furnace stabilization and a minor one-month delay in equipment supply from China.
- Margins are stable, not expanding: Management explicitly guided investors to model 16–18% EBITDA margins for H2 and the mid-term, with raw material tailwinds offset by the absence of further efficiency gains.
- What to watch next quarter: Whether the blast furnace stabilizes without another shutdown, the pace of JJM order book replenishment, and any concrete disclosure on the Greenfield project.
Volume & Operational Disruption
- Shutdown mechanics: The 7–7.5 day annual maintenance shutdown in August was extended to try additional improvements, but stability post-shutdown did not come as quickly as expected, costing ~12,000 tons of lost production and sales. The blast furnace is still not at optimal level.
- Recurring blast furnace fragility: The south plant faces repeated stability issues because highly variable raw material quality, particularly high silica and alumina impurities in iron ore, changes blast furnace behavior. Management has consulted designers, suppliers and experts and is working on improving charge mixes.
- Shutdown decision pending: A call on whether another shutdown is needed will be made in 10–15 days; management says any fix will not be very capital-intensive.
- H2 volume path: Approximately 4 to 4.3 lakh tons expected in H2, implying a meaningful step-up from the disrupted Q2 run-rate.
- Installed capacity post-CAPEX: Once the ongoing expansion shifts from mid-quarter to end-of-quarter completion, installed capacity will reach 9 lakh tons, which becomes the manufacturing capacity for FY26.
Kejriwal: "I think going by a stable margin at this level would be a better way to look at it."
Margins & Raw Materials
- Gross margin tailwind: Gross margin improved ~130 bps YoY to 50.7% in Q2 as coking coal prices came down during the quarter and have fallen further since. Iron ore was volatile between Q1 and Q2 but is now more stable.
- Shutdown margin hit: The shutdown had approximately half a percentage point impact on EBITDA per ton.
- Coking coal benefit in Q3: Management has booked a good amount of coking coal and expects some more benefit to flow through in Q3, though no quantification was provided.
- Depreciation step-up: Depreciation rose ~20% YoY to ₹36 crores due to capitalization of projects in Kalahasthi, a structural cost increase that will persist.
- Stable, not rising: Management prefers investors model stable margins at current levels rather than expecting improvement from efficiency or scale beyond realization. The 16–18% EBITDA range is the mid-term anchor.
Demand & Order Book
- Temporary demand pause: A minor downward correction in selling prices occurred in recent bidding, driven by a temporary slowdown from the Jal Jeevan Mission. Management is not concerned long-term and calls it a temporary pause.
- JJM recalibration: The new government is recalibrating the program post-elections. The dashboard shows ~78–79% completion with 20% still required, and more work will be added. Order book pickup is expected by the beginning of Q3.
- Order book depth: The company holds around a nine-month order book, with roughly 0.65 crore tons of pending orders that management expects will constantly refill over 18–24 months.
- River linking excitement: The Ken-Betwa project is progressing with good speed. Management is relatively excited about river linking for pipe demand and expects incremental order book from river interlinks in FY26, though exact DI pipe tonnage is too early to quantify.
- Pricing outlook: No major correction expected; management sees a possible slight dip then slight increase quarter-to-quarter depending on demand pull, with Q4 potentially seeing upward movement when demand picks up.
Kejriwal: "I'm not very concerned about this on a long-term perspective and I'm very hopeful that the outlook for demand remains the same, it's a temporary pause."
Exports & International Expansion
- Export mix depressed: Exports were only 13% of DI volumes in H1, lower than usual due to elevated ocean freight and robust domestic demand making domestic markets more attractive on margins for some markets. The company is concentrating on higher-margin markets.
- Export outlook muted: Q3 exports might be a little better but won't be substantial; movement depends heavily on ocean freights, which are tied to the geopolitical scenario.
- Singardo acquisition rationale: Singardo was the authorized distributor for Electrosteel pipes and fittings in Southeast Asia. The acquisition aims to aggressively expand into the region as total production expands, and to use Singardo's network for other traded water-industry products.
- Singardo contribution: Total tonnages in the Southeast Asian market might improve by 5–7%. Financial details were limited: management provided only two years of revenue and an EBITDA margin range, and stated the acquisition cost was based on book value.
Kejriwal: "Unfortunately, the ocean freights are dependent on the geopolitical scenario of that region and I don't think any of us are equipped to really answer that particular question."
Growth Projects & Capital Allocation
- CAPEX on track: Nearly ₹440 crores spent till September 2024; ₹150–160 crores expected in H2, with the balance ₹100 crores in the subsequent financial year. The aim is to enhance DI pipe manufacturing capacity to 0.1 crore tons by end of FY26.
- Greenfield project nearing disclosure: Things are progressing as per plan; management is getting closer to finalizing the end result and will disclose it when ready. Funding will largely be through internal accrual with possible minor leveraging; overall leverage is not expected to rise as existing loans will be repaid.
- Fittings ambition: The company aims to grow fittings contribution from the current 4% to 5–10% in two years, as part of the Greenfield project, though exact tonnages are not yet clear.
- Gasket plant: A plant is being set up in Punganur, ~125 km from Kalahasthi, mostly for captive use with surplus sold in the market.
- Green power push: For the Greenfield project, green power is being taken up in a big way; in existing operations, a green power project is underway and management is interacting for a tie-up under the open source scheme.
- Net debt expectation: Expected to be ~₹1,300 crores including working capital by year-end.
- Credit rating upgrade: All long-term credit ratings upgraded by India Ratings from AA Minus to AA during the quarter.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Full-year volume | Lower end of 8 to 8.5 lakh tons | FY25 |
| H2 volume | Approximately 4 to 4.3 lakh tons | H2 FY25 |
| EBITDA margin | 16% to 18% range | H2 FY25 and mid-term |
| Installed capacity | 9 lakh tons post-expansion CAPEX | FY26 |
| CAPEX spend | ₹150–160 crores in H2, ₹100 crores thereafter | H2 FY25 / subsequent FY |
| Net debt | ~₹1,300 crores including working capital | Year-end FY25 |
| JJM order book pickup | Order book to start picking up again | Beginning of Q3 FY25 |
| Fittings contribution | Reach 5% to 10% of mix (from 4%) | Within two years |
| Singardo volume impact | Southeast Asia tonnages improve 5–7% | Not specified |
| Blast furnace shutdown decision | Decision on whether another shutdown is needed | Within 10–15 days |
| River linking order book | Incremental orders expected | FY26 |
Key Metrics
| Metric | Q2 FY25 |
|---|---|
| Total income (consolidated) | ₹1,849 cr, down 4.6% YoY |
| Total income (standalone) | ₹1,712 cr |
| EBITDA (consolidated) | ₹289 cr, margin 15.6%, down 82 bps YoY |
| EBITDA (standalone) | ₹270 cr, margin 15.7% |
| PAT (consolidated) | ₹155 cr, margin 8.4% |
| PAT (standalone) | ₹152 cr, margin 8.9% |
| Gross margin | 50.7%, improved 130 bps YoY |
| H1 FY25 total income (consolidated) | ₹3,885 cr, up 6.5% YoY |
| H1 FY25 EBITDA (consolidated) | ₹666 cr, up 31.8% YoY, margin 17.2%, expanded 329 bps YoY |
| H1 FY25 PAT (consolidated) | ₹381 cr, up 52.8% YoY, margin 9.8%, expanded 297 bps YoY |
| DI Pipes sales volume | 1.76 lakh tons in Q2, 3.68 lakh tons in H1 |
| Export contribution | 13% of total DI volumes for H1 |
| Order book | ~9 months, with ~0.65 crore tons pending to be finalized |
| Net debt-equity | 0.27 times as on 30 September 2024 |
| Long-term credit rating | Upgraded to AA from AA Minus by India Ratings |
| CAPEX spent till September 2024 | ~₹440 cr, out of ₹700 cr total plan |
| Shutdown expense | ₹13-14 cr, incurred in August |
| Production lost due to shutdown | ~12,000 tons |
| Full-year volume guidance | 8 to 8.5 lakh tons, expected at the lower end |
| H2 EBITDA margin range | 16% to 18% |
| Long-term borrowing | ~₹450 cr as on 30 September 2024 |
| Net debt including working capital (year-end estimate) | ~₹1,300 cr |
| Term loan cost | ~8% |
| Working capital cost | ~7.5% |
| Singardo acquisition cost | ₹49 cr, based on book value |
| Singardo revenue | ~S$13 million for FY23-24 and FY22-23 |
| Singardo EBITDA margin | 10% to 13% |