Key Takeaways
- Core gases is the real story: Revenue grew close to 10% YoY after stripping out lumpy project engineering, and management wants investors to track this segment, not the consolidated headline.
- Capacity build-out is accelerating: Three plants under construction, a fourth site nearly finalized in Western India, and a 20–25% CAGR target over 4–5 years on the core gases base.
- Argon is a structural winner, not a quarterly trade: Demand is growing faster than supply because argon output is tied to oxygen production rates; solar ingot manufacturing adds a new demand layer.
- Margins are protected by industry structure: 38% EBITDA this quarter, with a ~40% target; input cost pass-through and multi-year low power prices cushion product price corrections.
- What to watch next quarter: Ramp-up speed of the East India merchant plant commissioning this month, the Western India site announcement, and whether H2 growth confirms the long-term trajectory after a modest H1.
Core Gases: The Engine
- Growth proxy for Indian manufacturing: The gases business directly tracks expansion in steel, pharma, edible oils and now solar, making it a play on broad industrial activity rather than any single end-market.
- 10% YoY when cleaned up: Q2 FY25 carried ₹15 crore of project engineering revenue; stripping that out, core gases grew close to 10% in Q2 FY26, a cleaner read on underlying momentum.
- H2 acceleration expected: New capacity is coming online and existing plants are ramping, so the second half should be stronger than the first.
- Long-term lens over quarterly noise: Management explicitly asks investors to judge the business on a multi-year horizon because short-term project delays can shift revenue between quarters without altering the trajectory.
Varun Agarwal: "Since this is a long-term business driven by long-term contracts, we would encourage our investors to look at us from a long term perspective and not look at quarterly aberrations, if any."
Capacity Expansion Pipeline
- Three plants underway: A merchant plant in East India commissioning end of November 2025, an onsite plant in East India by March 2026, and another merchant plant in the second half of FY27.
- 220 TPD plant finally starting: Capex is mostly spent, the power connection is secured, and production begins by end of this month; the ₹100+ crore revenue potential remains intact.
- Western India entry: A merchant-model plant with a site that is "more or less finalized"; management expects to share the exact location on the next investor call.
- Pan-India ambition: The company is actively evaluating western, central and northern India, with plans to become a pan-India player over the next couple of financial years.
- Total owned capacity trajectory: 1,910 tons per day by end of FY26, rising to over 2,100 tons per day by end of FY27.
- More to come: The three disclosed plants are not the endpoint; multiple additional expansions are on the drawing board and will be announced in future quarterly calls.
Varun Agarwal: "We are actively looking at all these areas and you know there are certain plans in place for us to become a pan India Company, you know, over the next couple of financial years, so that we can capture growth across all regions."
Argon: Structural Tightness
- Supply is a byproduct, not a standalone decision: Argon constitutes only 4–5% of oxygen output, so its production growth rate is dictated by oxygen capacity additions, not by argon demand alone.
- Demand is accelerating on solar: Companies moving into solar ingot manufacturing require large volumes of argon, creating a new structural demand layer on top of existing industrial consumption.
- Margins are superior but undisclosed: Management confirmed argon EBITDA margins exceed the 40% company-wide target but declined to give a specific forecast number.
- Short-term price swings are noise: Q2 FY25 saw an abnormal argon price spike; management analyzes only long-term trends and compares quarterly movements to daily stock market fluctuations.
Varun Agarwal: "You cannot set up Argon supply, just Argon supply cannot be set up right. Your whatever Argon supply comes is like a byproduct of your oxygen production."
Margin Structure & Protection
- 38% EBITDA this quarter: Management frames it as validation of operational discipline and cost management, with a maintained target of around 40%.
- Power prices are a tailwind: Oxygen and nitrogen prices corrected year-on-year, but power prices are at multi-year lows, so margins remain protected even as product prices ease.
- Industry structure passes through costs: If input costs like power or diesel rise, end-product prices rise too; the market structure inherently protects margins.
- Contracts reduce spot exposure: Not all production is exposed to short-term price movements; a portion is locked under contracts.
- Argon adds an upside layer: With margins above the 40% corporate average, argon provides a mix tailwind as its share of the portfolio grows.
New Verticals: Solar, Semiconductor & Specialty Gases
- Solar is happening now: Three contracts were closed in the solar space last quarter, and discussions are underway with multiple solar cell manufacturers for holistic gas solutions including specialty gases.
- Semiconductor is a slower build: Management is gearing up to serve semiconductor and electronics segments but cautions that meaningful gas demand "will take a little bit more time."
- Specialty gases supply chain secured: The company has tied up imports of silane, ultra-high-purity ammonia and ultra-high-purity nitrous oxide for sale to customers.
- Warehouse infrastructure starting: Work is beginning on a specialty gases warehouse at an existing location, with more to follow within existing and new facilities.
- Hydrogen is portfolio, not a pivot: Hydrogen will be supplied to pharmaceutical and edible oil customers as just another gas; the company is not in the hydrogen-as-energy-resource space and does not expect it to become a meaningful revenue contributor.
Varun Agarwal: "We are not, we are not in that hydrogen as an energy resource kind of space."
Project Execution Risk
- Delays are a fact of life in this business: Small project delays shift revenue between quarters but do not alter the long-term trajectory; a revenue expected in Q3 may land in Q4.
- Kurnool ramp-up on track: Utilization has moved from Q1's 65% to 75–80%, consistent with earlier commentary.
- New plant ramp-up expectations: The East India merchant plant coming online this month is expected to ramp quickly because it sits in a core market where the company already has strong presence.
- Western India ramp-up will be gradual: Management has built a 1.5–2 year ramp-up into its financial calculations for the Western India plant, leveraging existing customer relationships from other geographies and positioning as a second supplier.
Varun Agarwal: "While it doesn't change the long term trajectory of the business, I think on a shorter term basis you may find that, you know a revenue which was expected to come let's say in Q3 will come in Q4 and things like that."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Core gases revenue CAGR | 20–25% over 4–5 years, with last full financial year as base | 4–5 year horizon |
| EBITDA margin | Around 40%, may inch up slightly | Ongoing |
| Total owned capacity | 1,910 TPD | End of FY26 |
| Total owned capacity | Over 2,100 TPD | End of FY27 |
| East India merchant plant | Commission and production start | End of November 2025 |
| East India onsite plant | Commission | By March 2026 |
| 220 TPD plant | Commission and production start | End of November 2025 |
| Next merchant plant | Commission | H2 FY27 |
| Western India plant location | Exact location announcement | Next investor call |
| Pan-India presence | Become a pan-India company | Next couple of financial years |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹89.2 cr, +6.7% QoQ |
| Revenue from sale of gases (like-for-like) | ~10% YoY growth, excluding one-off project engineering revenue in base |
| EBITDA | ₹33.7 cr, margin of 38% |
| Profit after tax | ₹36.7 cr, +96% YoY |
| Argon revenue share | 13% of total revenues |
| Total owned and operated capacity (end of FY26) | 1,910 tons per day |
| Total owned and operated capacity (end of FY27) | over 2,100 tons per day |
| Core gases revenue CAGR guidance | 20–25% over next four to five years |
| EBITDA margin target | around 40% |
| Kurnool plant utilization | closer to 75–80%, up from 60–65% in Q1 |
| New 220 TPD plant capex | ~₹160 cr, annual revenue potential of ₹100+ cr |
| New 220 TPD plant commissioning | end of this month (November 2025), about a month delay |
| East India onsite plant commissioning | end of this financial year (March 2026) |
| Next merchant plant commissioning | second half of next financial year, pushed from Q2 FY27 |
| H1 FY26 revenue growth | ~8% |