- Underlying Q4 was strong, reported numbers were not: Core gases revenue grew 9% QoQ and segment margins hit 40%, but three one-off charges totaling ₹4.6 crore masked the performance in consolidated EBITDA.
- Argon is recovering, and that matters: Argon pricing bounced off Q3 lows and management expects further normalization into FY27, a meaningful tailwind given argon can reach ~15% of revenue over the longer term.
- Capacity is the growth engine, and it is arriving now: Uluberia 2 (220 TPD) is ramping up, a 320 TPD on-site plant commissions next month, and merchant capacity is set to rise from ~900 to ~1,130 TPD over the next 12 months.
- Management is targeting 40% EBITDA margins via efficient new plants, renewable power, operating leverage, and argon recovery, while committing to a 20% revenue CAGR over 2–3 years.
- What to watch next quarter: The pace of Uluberia 2’s ramp-up, the on-site plant’s commissioning and stabilization, and whether argon’s pricing recovery sustains or accelerates.
One-Offs Masking Underlying Performance
- Three items hit Q4 EBITDA by ₹4.6 crore: a ₹1.1 crore provision for employee leave encashment (an accounting policy catch-up), an impairment on a legacy non-core investment, and a ₹1.5 crore one-time settlement with an on-site customer over a plant start-up date dispute. The customer remains under a 15-year contract and the business continues smoothly.
- Stripping these out, the gases business was healthy: segment result margin reached 40% in Q4, up from ~35% in Q3, and stood at 38.4% for the full year FY26. Revenue grew 9% sequentially on better traction from newly commissioned capacity and the existing base.
- FY26’s reported growth was suppressed by timing: the delayed start of Uluberia 2 meant existing plants ran at high utilization but new capacity could not yet contribute; growth in this business arrives in steps when plants commission.
Varun Agarwal: "If we strip out these three items, the underlying Q4 margin looks materially better than the reported number, and the core gases division, if you look at it from a segment basis, it delivered a segment result margin of 40% in Q4 of FY26 and for the entire financial year of FY26 38.4%."
Capacity Expansion: The Growth Backbone
- Uluberia 2 is in ramp-up: the 220 TPD merchant plant in West Bengal commissioned in Q4 and has moved into its ramp-up phase. Management believes the standard 18-month ramp-up assumption can be beaten because of an established market presence and existing customer relationships in the region.
- An on-site plant arrives next month: a 320 TPD plant in East India, serving a long-term customer, is expected to go live within a month from late May 2026 and will carry a stable revenue profile.
- The 12-month capacity bridge: merchant capacity is set to rise from ~900 to ~1,130 TPD, and on-site capacity from ~700 to ~1,000 TPD. Beyond that, a further ~250 TPD merchant plant is targeted for early FY28 in northern and west-central India, taking total merchant capacity to ~1,350 TPD.
- Project engineering is consumed internally: the project engineering vertical will show no significant external revenue because the team is fully engaged executing the company’s own capacity build-out, which generates no billing.
- All existing capacity is full: excluding the just-commissioned Uluberia 2, every other plant is running at full utilization, so new capacity is the only path to volume growth.
Varun Agarwal: "We are one of the few independent companies that are able to do this."
Argon: The Swing Factor
- Q4 brought a pricing recovery: argon prices improved from Q3 lows, which had been driven by a softer steel environment and oversupply from captive gas plants operated by steel producers. Management called the recovery encouraging and sees scope for further normalization in FY27.
- The structural case is supply-linked: argon is a byproduct of oxygen production, so supply growth is tied to oxygen capacity additions, while demand is rising across industrial applications and potentially from solar and emerging sectors. Management remains constructive over the medium term.
- Argon can be a material revenue driver: over the longer term, argon’s revenue share can touch ~15%, depending on pricing. A significant boost is expected if global geopolitical issues recede.
- Volatility is inherent, so management urges an annual lens: short-term pricing swings are normal, and the company prefers investors to assess argon on an average annual price rather than quarter by quarter.
Varun Agarwal: "We would encourage to look at argon pricing on an average price for the year rather than keep looking at it on every quarter basis because in short-term this pricing tends to be a little volatile."
Margin Path: 40% Is the Target
- The medium-term EBITDA margin aspiration is 40% , driven by four levers: efficient new capacities with lower power consumption, increasing renewable power procurement, argon pricing recovery, and operating leverage as merchant plants ramp up.
- Power is the largest cost and is being actively managed: newer plants are more efficient, and the company has signed a long-term PPA for a wind-solar hybrid plant that will supply ~55–60% of one factory’s power demand. It is targeting similar PPAs for all three southern-region plants, though one is waiting on state government policy and another requires customer and producer coordination.
- Power cost will fall but has a floor: management expects power cost as a percentage of revenue to directionally move lower but does not see 10% as feasible.
- Transportation, the second-largest cost, is also being optimized: the company prefers a 300–400 km delivery radius and is investing in larger-capacity tankers to reduce per-unit cost.
- FY26’s margin shape tells the story: H1 margins were higher at 38% because of significantly stronger argon pricing; H2 softened with argon, and Q4 carried the one-offs. Adjusting for those, the gases segment was already near the target band.
Varun Agarwal: "Our long-term EBITDA margin aspiration is 40%. And there is a reason and we want to clarify what will drive this margin to 40%."
Specialty Gases and the Solar Opportunity
- A specialty gases facility is planned within the west-central India plant to debulk and distribute specialty gases for solar cell manufacturing, positioning the company to serve a growing domestic solar supply chain.
- Argon demand may also benefit from solar and emerging sectors, adding a structural demand layer beyond traditional industrial and steel applications.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Merchant capacity expansion | ~900 → ~1,130 TPD | Next 12 months |
| On-site capacity expansion | ~700 → ~1,000 TPD | Next 12 months |
| East India on-site plant commissioning | 320 TPD plant go-live | Within ~1 month from late May 2026 |
| Further merchant capacity addition | ~250 TPD plant in north/west-central India, taking total to ~1,350 TPD | Early FY28 |
| Revenue growth | 20% CAGR | Over 2–3 years |
| EBITDA margin | 40% | Medium term |
| Argon revenue share | Up to ~15% of revenue | Longer term |
| Renewable PPA coverage | PPAs for all three southern-region plants targeted | One awaiting state policy; one in customer discussions |
| Capex target | ₹250 crore for FY26, expected to be fully utilized | Over the full year |
Key Metrics
| Metric | Q4 FY26 |
|---|---|
| Revenue (core gases segment) | 9% sequential growth QoQ |
| Core gases business FY26 growth | 14.2% over FY25 |
| Reported EBITDA | ₹26 cr, reported EBITDA margin ~30% |
| Adjusted EBITDA (excl. one-offs) | ₹30.4 cr, adjusted margin ~35% |
| One-off items (aggregate) | ₹4.6 cr: employee leave encashment provision ₹1.1 cr, legacy non-core investment impairment, on-site customer settlement ₹1.5 cr |
| Gases segment EBITDA margin (adjusted) | 40% in Q4, up from ~35% in Q3; 38.4% for full FY26, growth of 500 bps from FY25 |
| Long-term EBITDA margin aspiration | 40% |
| Revenue growth target | 20% CAGR |
| Argon revenue share | 8% to 10% of total revenue in Q4; longer-term target ~15% |
| Power cost as percentage of revenue | ~22% |
| Existing merchant capacity | ~900 tons per day |
| Existing on-site capacity | ~700 tons per day |
| Expected merchant capacity (next 12 months) | ~1,130 tons per day, from ~900 |
| Expected on-site capacity (next 12 months) | ~1,000 tons per day, from ~700 |
| Uluberia 2 merchant plant capacity | 220 tons per day, commissioned in Q4 |
| East India on-site plant capacity | 320 tons per day, expected to commission next month |
| Capex target for FY26 | ₹250 cr, expected to be fully utilized over the year |
| Renewable energy share (merchant capacity) | ~18% of total 900 tons, from one 170-ton plant with signed PPA |
| Grid vs PPA power pricing | Grid pricing 50–60% higher than PPA pricing |