Key Takeaways
- Leasing dominated by GCC expansion: GCCs drove over 71% of leasing, with more than 80% of new or pre-leasing coming from existing occupiers expanding, a structural shift that commands premium rents.
- Occupancy dipped to 85% on IT exits: 702k sf of exits, primarily from IT services occupiers, pulled overall occupancy down, though 67% of the resulting 5.1 msf vacancy sits in smaller markets and represents only 5% of portfolio value.
- NOI grew 9% but distributions barely moved: NOI rose to ₹738 crores, yet NDCF grew only 1% to ₹510 crores as higher interest costs and a non-cash gap between lease commencement and rent commencement dates absorbed the operating gains.
- Refurbishment is delivering 200%+ re-leasing spreads: Completed refurbishments at Manyata’s D and K blocks leased at spreads exceeding 200%, with another full-block refurbishment planned after an expected IT services exit later this year.
- What to watch next quarter: Whether the 2 msf leasing pipeline converts fast enough to offset the next large IT exit at Manyata, and whether the ₹4,100 crores of NCD refinancing due in H2 FY24 tightens the interest cost drag further.
Leasing Dynamics & Occupier Shift
- GCCs are the new anchor: GCCs now represent over 55% of the portfolio and contributed more than 70% of Q1 lease-up, with sectors spanning technology, BFSI, consulting, engineering and manufacturing. These tenants are less cost-conscious and willing to pay top rents for the best assets.
- IT services may be bottoming out: IT services contribution fell to 14% from 15% after one large exit. Management believes the downside is limited because leaders want employees back in office, and only 27% of the last three years’ hiring has converted to leased space, implying future demand.
- Large deals are back but slow to close: Two reasonably large deals were signed in Q1, deviating from last quarter’s trend. Significant RFPs are in the market, but deal-making still takes more time than a few years ago due to home-country approval processes at global GCC headquarters.
- SEZ demand is bifurcated: Existing GCCs in Bangalore with runway left on their tax holiday continue to take SEZ space, driving Q1 SEZ lease-up. Pune and Noida SEZ demand remains sluggish and tied to infrastructure upgrades, including the new airport.
Maiya: “These guys are not very cost conscious. They don't mind paying the best rent for the best assets which we own.”
Occupancy Bridge & Vacancy Profile
- Exits concentrated in IT services: 702k sf of exits drove overall occupancy to 85%, while same-store occupancy stood at 87%. The Galaxy asset saw one large IT services tenant exit this quarter, but the non-SEZ property has good traction and a large share of the pipeline.
- Vacancy is low-value: 67% of the 5.1 msf vacancy sits in Pune and Noida, smaller markets where on a value basis the vacancy represents only 5% of portfolio value.
- Near-term occupancy may dip further: Occupancy could fall next quarter when another IT services tenant exits Manyata, but by year-end both the overall portfolio and Manyata are expected to be marginally higher on a same-store basis.
- Galaxy and D3 are the near-term fill opportunities: A significant portion of Galaxy should be leased during the year, and the de-notified D3 building at Manyata is already 41% leased at 210% re-leasing spreads with a 225k sf pipeline and hopes of full lease-up by year-end.
Refurbishment & Denotification
- Refurbishment is a proven return driver: Completed refurbishments at Manyata’s D and K blocks delivered re-leasing spreads above 200%. Block K was ~70% leased by the time refurbishment finished; D3 was over 40% re-leased. Full lease-up is expected within three to six months of completion.
- Another refurbishment is teed up: A full block at Manyata where an IT services tenant is expected to vacate later this year will be refurbished with similar expected re-leasing spreads.
- Denotification unlocks non-SEZ demand: The D3 building denotification took about five months end-to-end in Bangalore. Management has identified another 0.8 msf building in Manyata to de-notify within this financial year, and sees scope for floor-by-floor denotification across other assets.
- Pune denotification is slower: Hudson and Ganges in Pune took around 12 months for denotification. Learnings from Bangalore may compress that timeline, but management would not commit to an exact timeframe.
Financial Performance & Distributions
- Revenue and NOI grew, but NDCF lagged: Revenue rose 10% YoY to ₹914 crores and NOI grew 9% to ₹738 crores, with office NOI margins at 85%. NDCF grew only 1% to ₹510 crores as NOI gains were offset by higher interest costs and working capital changes.
- The LCD-RCD gap is a material drag: On the 6 msf of leases signed, there is a gap between the Lease Commencement Date and Rent Commencement Date, creating non-cash NOI that does not convert to cash distributions in the current year. A timing gap in collections added a smaller working capital drag.
- Interest costs are rising and not done yet: Interest costs were assumed to increase 15-18% YoY, with two-thirds from rate increases and one-third from additional debt on new deliveries. The ₹4,100 crores of NCDs due for refinancing in H2 FY24 will add further pressure.
- Debt refinancing achieved record spreads: Two NCDs totaling ₹2,075 crores were raised at an average rate of 7.8%, achieving a 120 bps spread over G-Sec, the lowest ever, and 146 bps of proforma savings.
Agrawal: “...there will be a gap between the LCD (Lease Commencement Date) and the RCD (Rent Commencement Date) because of which there will be non-cash revenue which will come during the current year and there will be slight portion of this working capital, which is normal in the business which have some timing gap in collection.”
Hotels & Non-Office Portfolio
- Hiltons are performing strongly: GolfLinks is running above 60% occupancy with much higher ADRs, and Manyata is around 54% occupied, having recently crossed 60%. The hotel business is factored to deliver a 60% YoY increase in EBITDA.
- Four Seasons is the drag: The Four Seasons is the focus area for the year ahead, with management working with the operator on marketing and corporate tie-ups to improve performance.
Capital Allocation & Growth Levers
- Chennai ROFO acquisition is on pause: The process has been put on hold because capital markets are not conducive for an acquisition of that scale; it depends on the stock price to fund the transaction.
- Occupancy is the CEO’s top priority: Higher occupancy drives higher cash flows, higher distributions, and a higher unit price, which in turn enables inorganic growth using equity as well as debt.
- FY24 is seen as the cycle bottom: Management expects this year to represent the bottom of the first five-year cycle, with leasing demand picking up on India’s talent and cost advantages, new Bangalore supply providing impetus for GCC leasing, and rate moderation eventually lowering the cost of funding.
Maiya: “I am able to increase the occupancy, our cash flows go up, distributions go up, which logically should take the price up, which will enable us to grow inorganically as well because we are going to use equity as well as debt to grow.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| FY2024 NOI | ₹2,924 to ₹3,136 crores | FY2024 |
| FY2024 distributions | ₹20.5 to ₹22 per unit | FY2024 |
| New lease-up | 6 msf total (4 msf new, 0.7 msf renewals, 1.3 msf pre-commitments) | FY2024 |
| Same-store occupancy | End marginally higher YoY | FY2024 exit |
| Contracted rent escalations | Achieve 14% on 6.7 msf leases | During FY2024 |
| Hotel EBITDA | 60% YoY increase | FY2024 |
| Interest costs | Overall increase of 15-18% YoY | FY2024 |
| D3 building lease-up | Fully leased | By end of FY2024 |
| Block K lease-up | Fully leased | By end of FY2024 |
| Next denotification | 0.8 msf building in Manyata identified | Within FY2024 |
| Galaxy lease-up | Significant portion leased | During FY2024 |
| DPU inflection | Significant bump-up in cash distributions from current-year lease-up | Next year (FY2025) |
Key Metrics
| Metric | Q1 FY24 |
|---|---|
| Revenue from Operations | ₹914 crores, +10% YoY |
| Net Operating Income (NOI) | ₹738 crores, +9% YoY |
| Office NOI margin | 85% |
| Net Distributable Cash Flows (NDCF) | ₹510 crores, +1% YoY |
| Distribution per unit | ₹5.38, 17th consecutive quarter of 100% payout |
| FY2024 NOI guidance | ₹2,924 – ₹3,136 crores |
| FY2024 distribution per unit guidance | ₹20.5 – ₹22.0 |
| Total portfolio occupancy | 85%; same-store occupancy 87% |
| Total leasing | 1.1 msf across 22 deals |
| New leases | 407k sf at 68% re-leasing spreads |
| Renewals | 209k sf at 15% renewal spreads |
| Pre-commitments | 448k sf in under-development projects at a premium to market rents |
| Exits | 702k sf, primarily from IT services occupiers |
| Leasing pipeline | 2 msf for operational portfolio and under-development projects |
| SEZ vacancy | 15% (3 msf); non-SEZ vacancy 10% excluding new Pune buildings |
| Hotels EBITDA | ₹40 crores, with 53% occupancy and 30% YoY ADR growth |
| In-place debt cost | 7.3%; dual AAA/Stable credit ratings |
| Total debt book | ₹15,350 crores; ₹4,100 crores of NCDs due for refinancing in H2 FY24 |
| NCDs raised | ₹2,075 crores at an average rate of 7.8%, 120 bps spread over G-Sec |
| IT services share of portfolio | 14%, down from 15% due to one large exit |
| GCC share of Q1 leasing | 71% of total leasing; 55%+ of overall portfolio now GCCs |
| Physical occupancy (back-to-office) | 52%–54% portfolio average; 75%–80% for largest GCCs, 25%–40% for IT/ITES |