- Profit doubled on one-time settlement: PAT surged to INR138.93 crores (vs INR64.81 crores YoY), driven by a INR56 crore client settlement flowing through other income, not core operations.
- Order book building, not yet converting: Q1 order inflow of INR1,265 crores and a current book of INR2,200 crores support the full-year target of INR4,000+ crores, but revenue stayed flat YoY at INR808 crores.
- Energy transition is the growth narrative: A bamboo-to-biofuel refinery, a coal-to-ethanol project, a solar CSP alliance, and carbon-capture work with NTPC position EIL for a rising share of new-economy capex, though management cannot yet quantify the opportunity.
- Petchem capex cycle is the big prize: Multiple projects of INR25,000–50,000 crores each are entering the tendering phase, where EIL’s consultancy fee is 2–3% of capex. The timing and EIL’s win rate remain unproven.
- What to watch next quarter: Whether the INR2,200 crore order book converts into revenue growth, progress on change orders to lift EPC margins, and any firming of the petchem tender pipeline.
The Quarter: A Settlement-Driven Beat
- Revenue stalled: Turnover was nearly flat at INR808 crores vs INR805 crores YoY, so the profit jump did not come from volume.
- Other income masked the core: Other income rose to INR93 crores from INR27 crores YoY, primarily from a one-time client settlement of INR56 crores in the consultancy and engineering segment.
- RFCL profit share grew: EIL’s 26% stake in the Ramagundam Fertilizer plant contributed INR22.49 crores, up from INR13.85 crores YoY, with the plant now operating at 100% capacity.
- Operating margin improved, but from a low base: Operating margin reached 7.4% vs 5.1% in the June 2022 quarter, helped by write-backs in other expenses that management called part of normal operating activity and could not quantify.
- Consultancy margin held steady: The consultancy segment maintained margins at 25–27%, while EPC margins remain under pressure and management is pursuing change orders with clients to improve them.
- NRL dividend absent: No dividend was declared by Numaligarh Refinery in Q1; last year EIL received ~INR55 crores on its INR700 crore investment, a tax-free yield above 7.5%.
Chopra: "At that point of time, basically, over a period of time, there has been a substantial increase in the cost, and there is a competition over a period of time... So over a period of time, a lot of water has flown. So going forward, we will try to maximize the margin. But I cannot say that we'll be able to achieve a margin of 20%. But definitely, we'll try to improve our margin going forward."
Order Book & Pipeline
- Q1 intake solid, H2 expected stronger: Orders secured in Q1 totalled INR1,265 crores, and the current book stands at INR2,200 crores with more awards in advanced stages. Management expects another INR1,800–2,000 crores in H2.
- Full-year target: Management aims to match or exceed last year’s order book of INR9,080 crores, targeting INR4,000 crores or more in fresh inflows this financial year.
- Consultancy inflow target: INR1,500–2,000 crores minimum from consultancy alone.
- Execution runway: Current order book will execute over 3 to 3.5 years; mega projects typically take 36–42 months from LOI.
- Petchem capex cycle approaching: Multiple petchem and crude-to-chemical projects of INR25,000–50,000 crores each are in the pipeline, with tendering expected this financial year for BORL’s petchem complex and later for IOCL Paradeep. ONGC’s crude-to-chemical complex is at the DFR stage.
- Consultancy fee benchmark: For petchem projects of this scale, EIL’s consultancy opportunity is 2–3% of total capex.
- Private refinery expansion: A private refinery expansion opportunity is expected toward the end of this year.
- Adani polysilicon project on hold: The project has been put on hold from the client’s side.
- NRL rights issue received: EIL has received a rights issue from Numaligarh Refinery; no further equity investment proposals are under consideration and no policy governs PAT allocation for such investments.
Jindal: "Any of the petchem the number of petchem are there. Most of the petchem starts from INR25,000 crores to INR40,000 crores, INR50,000 crores. So you can see four or five projects coming on the way."
Energy Transition & New Domains
- Bamboo-based biofuel refinery: EIL is executing a refinery for AVPRL in Numaligarh that leapfrogs from lab scale to commercial scale, taking technology readiness from level 2 to 8/9.
- Coal-to-ethanol project: EIL is executing its first project for Neyveli Lignite converting coal to value-added chemicals. Management sees huge potential for a chain of such projects once this becomes a success story, but cannot quantify the opportunity size yet.
- Solar CSP strategic alliance: The board approved a strategic alliance, not a joint venture, where a technology partner provides patented technology and EIL handles engineering and project management for the balance of plant. EIL secured exclusive territorial and sectoral rights for India’s oil and gas sectors, with around 35% of total project cost addressable by EIL.
- Carbon capture: EIL was appointed consultant by NTPC for a project capturing carbon and converting it to ethanol, building on prior involvement in NTPC’s methanol project.
- Hydrogen positioning: EIL has executed a hydrogen plant for BORL and a hydrogen pipeline for Adani. Management sees hydrogen as still evolving and cannot quantify the opportunity, but EIL is positioned to provide consultancy across all sections except electrolyzer manufacturing.
- Defence foray: EIL is working with one company on modernization projects, still in initial stages.
- Polysilicon and semiconductors: Management is at a very initial stage of studying these opportunities and has nothing concrete at this juncture.
- Energy transition revenue share: If current trends continue, the proportion of revenue from energy transition is expected to rise substantially, though management declined to give a specific percentage target for 2–3 years out.
Chopra: "So see that particular refinery is going into commercial scale right from the lab scale. From lab scale to commercial scale that's the leapfrog that the refinery has taken up. So all those technical aspects are being covered by EIL, taking it from the technology readiness level of 2 to right now it is going at 8 and 9."
International Expansion
- Nigeria: EIL secured a second train of a job in Nigeria and is targeting more petrochemical projects there.
- Algeria: A preliminary letter of award has been received for one project, with contract signing expected in the next few days. EIL is bidding for more projects in Algeria.
- Middle East: Management reports good progress in getting projects and is targeting enhanced outreach to additional Middle East countries.
- South America: Also flagged as a target region for overseas expansion.
Margin & Cost Structure
- Operating margin improved YoY but remains low: Operating margin reached 7.4% in Q1 FY24 vs 5.1% in Q1 FY23, aided by write-backs in other expenses. The March 2023 quarter had benefited from a separate client settlement that boosted that quarter’s margin.
- Consultancy segment stable: Margins in the consultancy segment are maintained at 25–27%.
- EPC margins under repair: Management is working with clients on change orders to improve EPC business segment margins and expressed confidence that change orders will be received.
- Long-term margin erosion acknowledged: Over the past decade, operating margins fell from 19% in March 2012 due to substantial cost increases and competition. Previously, EIL did process plants with higher margins. Management will try to maximize margins going forward but cannot commit to reaching 20%.
- No quantified margin target: Management expects to maintain margins going forward and will try to improve them, but declined to confirm net margins would improve beyond 10%.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Order inflow | INR4,000 crores or more this financial year; consultancy inflow of INR1,500–2,000 crores minimum | FY24 |
| Order book | Match or improve upon last year’s INR9,080 crores | FY24 |
| H2 order inflow | INR1,800–2,000 crores additional | H2 FY24 |
| Turnover growth | 5–10% increase in FY24; targeting ~INR3,500–3,600 crores (~10% growth) | FY24 and next FY |
| EPC margins | Improvement via change orders from clients | No date (confidence expressed) |
| Consultancy margin | Maintain at 25–27% | Ongoing |
| Project execution | Current order book executes over 3–3.5 years; mega projects 36–42 months from LOI | Ongoing |
Key Metrics
| Metric | Q1 FY24 |
|---|---|
| Revenue | ₹808 cr, flat vs ₹805 cr in Q1 FY23 |
| Consultancy & engineering revenue | ₹345 cr |
| Turnkey (EPC) revenue | ₹463 cr |
| Other income | ₹93 cr, up from ₹27 cr in Q1 FY23; includes ₹56 cr from a client settlement |
| Consolidated PAT | ₹138.93 cr, up from ₹64.81 cr in Q1 FY23 |
| EPS | ₹2.02, up from ₹0.90 in Q1 FY23 |
| Operating margin | 7.4%, up from 5.1% in Q1 FY23; absolute ₹59.97 cr vs ₹40.8 cr |
| Consultancy segment margin | 25% |
| Turnkey (EPC) segment margin | ~2% |
| Profit share from RFCL (Ramagundam fertilizer) | ₹22.49 cr, up from ₹13.85 cr in Q1 FY23; plant operating at 100% capacity |
| Unexecuted order book | ₹8,102 cr (consultancy ₹4,979 cr, EPC ₹3,123 cr) |
| Foreign consultancy order book | ₹1,587 cr out of total order book |
| Orders secured in Q1 | ₹1,265 cr |
| Orders booked as of call date | ~₹2,200 cr, with ₹1,800–2,000 cr more expected in H2 |
| FY24 order inflow target | ~₹4,000 cr or more |
| FY24 consultancy order inflow target | ₹1,500–2,000 cr minimum |
| FY25 revenue growth expectation | 5–10% |
| Revenue from energy transition jobs (FY23) | ₹63 cr, ~5% of consulting revenue |