Key Takeaways
- Volume-led recovery, not just price: Production volumes jumped ~32% YoY off a COVID-depressed base, and yarn lines ran at 100% utilization, but raw material inflation and freight chaos compressed the margin story.
- The polyester filament thesis is intact: Cotton stagnation and a 5.1% global demand CAGR create a structural tailwind; India alone needs 60–70% of its own filament output just to meet annual incremental world demand.
- Chemical recycling is the next catalyst: The depolymerization pilot is days from full commissioning, with a ₹150 Crore commercial-scale investment gated only on pilot success and a clear path to multi-plant scale-up.
- DTY is a strategic necessity deferred: Margins are compressed at ~₹3/kg over POY, but DTY opens global markets and aligns with PLI-driven demand; management will wait, but "sooner or later we will have to put DTY."
- What to watch next quarter: Whether the chemical recycling pilot produces stable, certifiable output, any restart of the captive power plant if coal prices fall to ₹8, and the pace of Dahej debottlenecking commissioning.
Volume & Demand Environment
- Base effect matters: FY22 production was much higher (~32% YoY) because FY21 had a national lockdown and COVID-19 restrictions that forced plant shutdowns.
- Post-COVID demand surge: Pent-up demand and US-China trade tensions redirected sourcing toward Indian textiles, aided by proactive government measures.
- Polyester filament structural shift: With cotton yarn prices at relatively higher levels, end-use industries are increasing the proportion of polyester filament yarn to control cost; demand and sales are constantly rising.
- Domestic strength, export friction: Domestic demand is rising very rapidly and local market off-take is good, but exports have gone down because freight rates from China have been equivalent or cheaper than India, erasing India's traditional freight advantage to Western markets.
- User segments broad-based: Both home textiles and fabrics (knit and woven) are doing well; all segments are doing well, nothing in particular.
- Seasonal softness ahead: April, May, June are traditionally slow months because labor goes back to villages, returning in the second half of June; July through February/March is normal.
Madhu S Bhageria: "Filament is the main driver in the textile industry worldwide today because cotton is stagnated. The production of cotton in India has rather gone down. Worldwide also it is not increasing so the main driver and supplier for the extra garment is only polyester, other products are very small."
Margins & Cost Structure
- Per-kg margin lens: Management prefers per-kg basis because raw material price volatility distorts percentage margins; sustainable over a year at ₹14–15/kg EBITDA, but Q1 is normally a low quarter.
- DTY margin compression: DTY margins are compressed at ~₹3/kg incremental over POY, requiring significant investment and labor; the segment exists primarily to take care of POY offtake.
- Raw material volatility: Crude prices impact PTA and MEG; key PTA suppliers had several unplanned shutdowns last year causing domestic shortage, forcing a shift toward imports and higher raw material inventory.
- Pricing pass-through friction: The Russia-Ukraine war made buyers skeptical, buying went down, and prices couldn't be passed through fully, creating pressure on prices and margins; but polyester is the cheapest yarn available so pass-through normally works.
- Captive power plant unviable: Acute shortage of coal, high prices, export bans by producing countries, steep freight rates and erratic shipping schedules made operating the captive power plant unviable at current landed coal cost; restart possible if landed coal prices reach Rs. 8 (currently around Rs. 10).
Madhu S Bhageria: "I think our margins to look at is per kg basis because the raw material prices would create a distortion in the percentage so per kg is a better way to look at our margins."
Capacity & Capex
- Yarn at full tilt: Capacity utilization is almost 100% in the case of yarns; chips production was reduced because margins in chips are very poor.
- Dahej debottlenecking: Work progressing on melt capacity of 50 TPD and POY lines of 120 TPD; installation and commissioning targeted for completion by July 2022.
- Dadra upgrade complete: Old POY lines replaced with new equipment increasing capacity by ~8 tons per day and reducing operating cost; operational from end of May 2022.
- Chips strategy shift: Once POY is operational, no substantial extra chips capacity will remain; everything will be consumed and converted in-house, with only very small quantities sold if good buyers are found.
- Incremental capacity philosophy: Will keep adding small incremental polymerization or incremental increases in POY or DTY; no plans for a new polymerization plant at the moment.
- Capex financing: All planned capex can be financed through internal accruals easily; healthy cash flow surplus allowed prepayment of a large share of term loans, reducing debt-equity ratio from 0.77 to 0.33.
Chemical Recycling Project
- Pilot plant near commissioning: Depolymerization and purification section already commissioned ~20 days ago; polymer being purified and kept in stock; repolymerization part facing small initial hiccups, expected to start any day, max within a week.
- Full pilot timeline: Full pilot plant likely on stream by 10th June 2022; small problems being rectified, expected to be resolved within a week.
- GRS certification underway: Applied to Global Recycle Standard (GRS); authorized external agencies with Control Union will audit every step of the chemical recycling process.
- Commercial scale gated by pilot: Once pilot plant is stable and products are out, 3–6 months to improve quality and conclude how to go about commercial scale; first investment around ₹150 Crores.
- Scalability not a constraint: Once the first big plant is running, can scale up as much as wanted, either in multiple plants (3, 5, 8 simultaneously) or bigger single plant; whichever is more feasible.
Madhu S Bhageria: "Once the big plant is running then we can scale it up as much as we want either in multiple plants or in the size in one plant whichever one is more feasible."
DTY Strategy & PLI Opportunity
- DTY opens global markets: POY customers are limited to Surat and Silvassa area and very few are left; DTY can be sold throughout the world, so sooner or later the company will have to put DTY, but can wait for some time.
- PLI-driven demand is DTY/FDY, not POY: The PLI scheme is for manmade fibers, fabrics, garments and technical textiles; once PLI companies come into operation, demand for yarns would be very high, and that demand will be for DTY or FDY because PLI companies will make fabrics and garments.
- DTY margin outlook improving: Going forward DTY margin should increase; DTY also qualifies for textile ministry benefits including incentives, concessional interest, and concessional power rates.
- Capacity constraint: No space in existing plant for DTY; may need new area; plans exist but management will wait given current margin compression.
Madhu S Bhageria: "DTY actually opens up the market for you. DTY you can sell throughout the world. POY the limitation of the customer is there, so they are the customers who convert it to DTY and they are all confined to the Surat and Silvassa area and very few are left so sooner or later we will have to put DTY but we can wait for some time."
Renewable Power & Cost Savings
- Hybrid wind-solar project: Signed with M/s Fourth Partner for a hybrid wind and solar power plant of 10.8 MW capacity; company to invest ₹10.26 Crores for 26% equity stake to qualify as captive user.
- Project economics: Scheduled for commissioning by March 2023; will deliver ~5.05 crore units annually at landed cost of ~₹4.21/kWh, saving ₹3.05/unit, for an annual benefit of ₹15.4 Crores.
- Policy constraint: Project possible only because of government policy restricting to 45% of sanctioned load.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Chemical recycling pilot plant | Full pilot plant on stream | By 10th June 2022 |
| Dahej debottlenecking | 50 TPD melt, 120 TPD POY lines commissioned | By July 2022 |
| Hybrid renewable power project | 10.8 MW plant commissioned, saving ₹15.4 Crores annually | By March 2023 |
| Captive power plant restart | Restart if landed coal prices reach ₹8 (currently ~₹10) | When coal prices fall to ₹8 |
| Commercial-scale recycle investment | Invest ~₹150 Crores | Once pilot plant is successful |
| FY23 performance | Should do better than last year; adding new capacity; hope margins remain healthy | FY23 |
Key Metrics
| Metric | Q4 FY22 |
|---|---|
| Revenue | ₹3,828 cr, +72% YoY |
| EBITDA | ₹531.1 cr, +53% YoY |
| Profit before tax | ₹458.6 cr, +91% YoY |
| Net profit (PAT) | ₹302.7 cr, +82% YoY |
| EBITDA per kg | ₹14–15, sustainable over a year; Q1 normally lower |
| Production volume | 3,41,480 metric tons, +32% YoY |
| Sales volume | 3,40,480 metric tons, vs 2,59,905 metric tons in FY2021 |
| Debt-equity ratio | 0.33, improved from 0.77 |
| Return on equity | 32.76%, up from 24.4% in FY2021 |
| Return on capital employed | 31.16%, improved from 21% in FY2021 |
| Buyback offer | ₹140 per share, for an amount of ₹59.50 cr, announced March 2022 |
| Final dividend | 10% per equity share for FY2021-22 |
| POY EBITDA per kg | ₹12 |
| DTY EBITDA per kg | ₹3, incremental over POY |
| FDY EBITDA per kg | ₹20+ |