Key Takeaways
- Monsoon-hit quarter, guidance trimmed: Heavy rainfall across all mines forced FY23 lignite production guidance down from 1 crore tonnes to in excess of 0.9 crore tonnes, with Surat cluster worst affected.
- Pricing reset without a price cut: Realization dropped to ~₹3,700/ton from ~₹4,600–₹4,700/ton in Q1, driven by monsoon softening and a new five-tier customer segmentation that introduced discounts for micro units, not a headline price reduction.
- A seven-year diversification bet takes shape: Management laid out an ambition to derive 40–50% of revenues from non-lignite minerals within seven years, anchored by rare earth elements, bauxite, limestone, and six new mines, though bottom-line contribution will lag due to heavy capex.
- Power plant is a multi-quarter drag with an eventual payoff: Daily cash burn has improved but a full turnaround needs four to six quarters and ~₹300 crores in regulatory-approved capex; periodic downtime in the interim is framed as a market sales opportunity.
- What to watch next quarter: Whether land acquisition bottlenecks clear in Q3/Q4 to unlock capex, progress on the rare earth scoping study award, and any stabilization in lignite realizations as the monsoon base effect fades.
Lignite Operations & The Monsoon Quarter
- Rain impact was universal: All mines were severely affected through the full three months of the quarter ending September, with Surat hit most critically because over 60% of product flows to that cluster and conditions were very unsafe.
- Production still passed at an acceptable rate: Despite the unsafe conditions, management stated the quarter closed with an acceptable rate of production, though the ambitious 1 crore tonne annual target was formally revised down.
- Lignite demand remains a bright spot: Management described lignite as a "hot commodity" where whatever is produced gets sold, supported by high customer acceptance due to its physical formation and direct delivery model.
- Rajpardi mine winding down: Volumes are low and the mine will move toward closure, but the adjoining Damlai project will evolve from it so supplies from that area will not cease.
- Tarkeshwar not exhausting, just recovering: Production was impacted by a sliding incident in December last year; consultants are engaged to address safety issues and resume higher output.
- Bhavnagar ramp-up has a pyrite problem: The lignite carries fairly good calorific value but contains pyrite, which the company will seek to address as the major expansion proceeds; RFPs for the capacity ramp-up are already live.
Roopwant Singh: "Things were very unsafe during these three months, but we have passed them with the acceptable rate of production."
Pricing Strategy & Realization
- No headline price rise this year: Instead, management focused on better targeting the pricing structure to customer needs, citing more maturity in coal markets compared to the highly volatile months of the previous financial year.
- Five-tier segmentation introduced: The company moved from a simple two-stage small/large classification to micro, small, medium, large, and super large categories, with a discount below base price introduced for micro units where maximum volume flows.
- Realization drop explained: Q2 realization fell to around ₹3,700 per ton from ₹4,600–₹4,700 per ton in Q1, per an analyst's math, likely due to monsoon-driven price softening and the segmentation discounts for smaller customers.
- Landed cost optimization helped: Better allocation from the nearest mine to customers reduced landed cost, which benefited both customers and the company and improved lifting volumes.
- Judging performance going forward: Management suggested that if current conditions persist, realization performance should be judged on Q1 levels rather than the monsoon-depressed Q2.
- Pricing flexibility retained: Management routinely tracks international coal prices and would not be averse to tweaking prices depending on production and consumption centers, even if there is a further correction.
Roopwant Singh: "I think there is more maturity now compared to the highly volatile months in the previous financial year... we have not taken a price rise in this financial year, but at the same time what we have done is we have focused on better targeting the pricing structure to the needs of our customers..."
Diversification Beyond Lignite
Rare Earth Elements (REE)
- Strategy report is in and positive: M/s Mackenzie prepared a strategic road map whose findings are described as "very heartening and very positive," with "very good numbers, very impressive numbers."
- Scoping study RFP near award: An RFP for a technical examination and evaluation of the asset is in the final stages of being awarded to an international firm.
- Government permissions are the gate: Realization of the opportunity is conditional on privileges and permissions from the government; the asset still needs to be secured in the name of the SPV. Management hopes to "conclusively say something on this once we are able to get a strategy through from the government, hopefully in this financial year."
Other Minerals
- Bauxite sales model flipped: Previously produced bauxite was not getting sold; the company will now start producing what gets sold, which could contribute to volume.
- Limestone and silica stock disposal advancing: Studies, sampling, and testing at international labs have been undertaken; the company is now moving to roll out an exploratory beneficiation method to customize products to customer requirements.
- Manganese, copper, and more in pipeline: Management wants these opportunities to reach logical conclusion, with a lot of RFPs expected in the coming three quarters for awarding new work to contractors and finding the right partners.
New Mines
- Six mines in two years: Groundbreaking is planned for six mines in the coming two years, expected to reach a sustainable rate of production in three to five years.
- Production ambition at scale: The three-to-five-year target is 13 to 15 crore tons to satisfy solid fuel requirements of Gujarat state, though this would undergo radical change if new coal blocks from auctions are won.
- Kutch and South Gujarat quality: Kutch assets have calorific value more or less at par with Mata no Madh; South Gujarat assets border existing mines with one adjacent to Rajpardi (a "rest product"), one adjacent to Tarkeshwar (a "good product"), and one between the two, so good quality is expected.
Roopwant Singh: "In seven years, the ambition is to ensure that besides lignite, we get at least 40% to 50% of our revenues from other opportunities."
Power Plant: The Multi-Quarter Turnaround
- Four to six quarters to health: Daily cash burn has gone down, but the kind of improvement envisioned will take four to six quarters because there has been a total lack of investment over the life period of the plant until now; it needs a major overhaul, significant capex, and a change in regulatory treatment.
- ~₹300 crores capex petition filed: A petition for capital infusion has been submitted to the electricity regulator; most of it will be a pass-through.
- Periodic downtime framed as opportunity: The plant is expected to take periodic breaks in coming quarters to get "healthy and ready" to run at "sprinting speeds" in five to six quarters; during downtime, more output can be diverted to market customers at better realizations.
- Realization formula being simplified: The company is working with the electricity regulator and Energy Department to move to a simpler formula allowing sustainable operations and cheaper power; realizations are expected to improve in the coming quarter once resolved.
- Mata no Madh volatility explained: Realizations swing because part of the mine's output supplies the GUVNL power plant on an unconventional basis; when power plant requirements are higher, market realizations drop, and when requirements are lower, more is supplied to the market at better realizations.
Roopwant Singh: "Things have improved daily cash burn has gone down, but the kind of improvement that we have envisioned is going to take four to six quarters. Because, there has been a total lack of investment over the life period of the plant till now."
Capex, Capability & Coal Auctions
- FY23 capex is modest and back-loaded: Approximately slightly in excess of ₹600 crores, primarily for land acquisition and two lignite beneficiation plants; the lion's share goes to land acquisition, with spending expected to start clocking in toward the end of this year and a lot more in the next financial year. Capex could "easily be double of what we asked."
- Land acquisition bottleneck: Issues are expected to come to a head and get resolved in Q3/Q4, which would then enable the capex spending to flow.
- BCG onboarded for Project Shikhar: Boston Consulting Group has been engaged to vet capital plans, help prioritize them, optimize current lignite operations (processes, cost-cutting, customer experience), and plan significant lignite production capacity expansion.
- Organizational capacity a recognized constraint: Management acknowledged that people do not grow on trees and must be recruited and nurtured; an initiative focusing on people is expected to kick in next financial year (FY24), while partners will be sought in the nearer term for newer minerals where expertise is lacking.
- Coal block auctions did not go well: At some places GMDC was the only bidder so the block was cancelled; at others, blocks had no takers and may undergo significant redesigning. Management believes it should be in a better position to capture value in re-auctions with the knowledge and experience now gathered.
- New contractor onboarding is a "positive uncertainty": Progress on onboarding new contractors and hitting ground in other projects has an answer expected by the end of Q4.
Roopwant Singh: "People don't grow on trees. People have to be recruited and nurtured. And partners, yes, relatively, they grow on trees. We have to find the right partner..."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Lignite production | In excess of 0.9 crore tonnes (revised down from 1 crore tonnes) | FY23 |
| Capex spend | Approximately slightly in excess of ₹600 crores, primarily land acquisition and two beneficiation plants; could double if conditions met | FY23 |
| Land acquisition resolution | Issues expected to come to a head and get resolved, enabling capex | Q3/Q4 FY23 |
| Power plant turnaround | Significant improvement after major overhaul and regulatory reset | Four to six quarters |
| Power plant realizations | Improvement expected once simpler formula agreed with regulator and Energy Department | Coming quarter |
| New mines groundbreaking | Six mines to break ground | Coming two years |
| New mines sustainable production | Reach sustainable rate of production | Three to five years |
| Revenue diversification | At least 40–50% of revenues from opportunities besides lignite | Seven years |
| REE scoping study award | RFP in final stages of being awarded to an international firm | Near term |
| REE government strategy approval | Management hopes to conclusively say something once strategy is approved | Hopefully this financial year |
| Other minerals RFPs | RFPs on awarding new work to contractors and finding partners | Coming three quarters |
| Organizational capacity building | People-focused initiative to kick in | Next financial year (FY24) |
| New contractor onboarding answer | Progress update expected | By end of Q4 FY23 |
| Downstream integration / cement | Expression of interest for partners; "sizable movement" expected | Coming quarters |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue | ₹3,700 per ton lignite realization, down from ₹4,600–₹4,700 per ton in Q1 |
| Lignite realization (ex-captive) | ₹4,300 per ton ex-mine, excluding transportation costs |
| Margin per ton | ~₹1,500, depending on the mine |
| FY23 lignite production guidance | In excess of 0.9 crore tonnes, revised down from 1 crore tonnes due to monsoon impact |
| 3–5 year production ambition | 13 to 15 crore tonnes |
| Bhavnagar capacity ramp-up target | 0.5 crore tonnes per year |
| FY23 planned capex | Slightly in excess of ₹600 crores, primarily for land acquisition and two lignite beneficiation plants |
| H1 FY23 capex incurred | Nothing much has been done, awaiting land acquisition resolution in Q3/Q4 |
| Power plant capex petition | ₹300 crores, most will be a pass-through with no bottom-line effect |
| Customer segment price differential | ₹120 per metric ton difference between micro and L2 (largest) segments |
| Micro customer discount | ₹10 to the base price |
| Imported coal landed price vs GMDC | Imported coal: in excess of ₹2 per kg calorie; GMDC landed cost to customer: ₹1.5 to ₹1.7 per kg calorie |
| Government of Gujarat stake | 74% |
| 7-year revenue diversification target | 40% to 50% of revenues from minerals other than lignite |
| Mata no Madh external supplies (FY22) | 0.35 crore tonnes |