Key Takeaways
- Wind season delivers, but it is seasonal: Total income rose ~10% YoY, with 60% of the growth from better wind and 40% from improved machine availability. Q2 is historically the strongest quarter, and H2 will be significantly lower.
- A one-time interest refund flatters the bottom line: Finance costs fell over 20%, boosted by a ~₹16 crores refund from lenders for excess interest charged in earlier periods. This is an extraordinary item below the line, not a recurring operational gain.
- The balance sheet is healing, slowly: Interest costs are trending down as debt is repaid, and CRISIL upgraded the outlook to positive. Cash flows are comfortable relative to debt, funding organic expansion internally.
- A 1,000 MW ambition, but no map: Management has a clear target to reach 1,000 MW, but declined to provide a timeline, citing factors not entirely under its control. Inorganic growth conversations are happening but are not yet at the Board stage.
- What to watch next quarter: Whether the 7 MW solar project commissions on time in December 2025, any concrete inorganic deal announcement, and the actual H2 generation numbers against management's expectation of a performance similar to last year.
Quarterly Performance: The Wind Engine
- Wind generation drove the quarter: Q2 is the peak wind season across the industry, with wind starting halfway through Q1 and continuing through Q2. This year's wind was substantially better than a particularly bad last year, but was only average to slightly above average over a 10-year horizon.
- Machine availability improved materially: A major capital maintenance program undertaken two years ago is now paying off, with turbines in Andhra Pradesh fully operational after upgrades. This improved reliability and availability contributed 40% of the YoY growth.
- PLF jumped at the Beta asset: The Beta asset's PLF improved from ~24.5% to ~28% YoY in Q2, with other subsidiaries showing a similar pattern.
- H2 will be a different story: Q3 and Q4 generation is expected to be significantly lower than Q1 and Q2, more or less in line with the same quarters last year, plus or minus a few percent. Margins should still be better compared to the same quarter last year due to lower interest costs.
Shivaraman: "Typically, Q2 is the maximum wind period for the entire industry. So, wind starts in the halfway through Q1 and continues throughout Q2. So, historically, if you go back year-on-year you will find Q2 is the strongest quarter. It's a weather-related thing, nothing we can do about it."
Profitability & the Interest Refund
- Finance costs dropped sharply: Finance costs declined over 20%, driven by a ~₹16 crores refund from lenders for excess interest charged in earlier periods. This is an extraordinary item booked below the line, so it improves reported profit but is not a recurring operational gain.
- Operational performance also improved: Even before the interest refund, performance was better than the prior year. Management stated operating profits are sustainable, with stable costs and no percentage-wise decrease expected.
- Net profit margins are trending up: As debt is repaid, interest costs keep coming down while depreciation remains more or less flat. This structural decline in interest expense is steadily improving net profit margins.
- Cash flows are comfortable: Internal generation is sufficient to fund organic expansion, and cash flows are comfortable relative to the existing debt load.
Growth Strategy: Organic Steps, Inorganic Ambitions
- Solar diversification is underway: A 7 MW solar project is on track for commissioning by December 2025, with the balance 18 MW planned for completion before June 2026. Construction on the greenfield portion starts in the next couple of weeks.
- Wind will dominate for the foreseeable future: Even after the 25 MW of solar is complete, wind will remain ~95% of assets. This mix is not expected to change organically in the next 12-18 months.
- Wind has a structural advantage over solar: Wind generation peaks in mornings and evenings with a lull during the afternoon, making it more balanced throughout the day. Solar faces the problem of excess generation during afternoon hours, which can push power prices to absurd levels, as low as 10 paise per kWh.
- Repowering is in motion: An application has been made to start one repowering project in advance of a formal policy announcement from Tamil Nadu, aiming to have assets operational before the next wind season. Policy clarity is expected in the next two to three weeks.
- Inorganic growth is a serious conversation, not yet a deal: Management disclosed that a couple of fairly serious conversations are happening, but nothing has reached the Board stage. Multiple conversations are underway, but no details can be shared until something matures.
- Funding for inorganic deals will likely involve capital issuance: While organic growth is funded through internal accruals and debt, inorganic growth will probably require some kind of capital issue, with the structure to be figured out as opportunities materialize.
Shivaraman: "There are a couple of conversations, fairly serious conversations that are happening, but we are not yet at a stage where we can get into the details of what happens because these things never happen until they actually happen."
The 1,000 MW Target: Ambition Without a Clock
- The target is clear, the timeline is not: Management stated a clear target to reach 1,000 MW of capacity sooner rather than later, but declined to provide any specific timeline. The exact path depends on too many things not entirely under the company's control.
- Organic growth has two levers: Repowering existing assets to improve output from the current footprint, and adding new assets around the existing portfolio. Both are in early stages.
- Inorganic growth is the wildcard: Acquisitions could accelerate the journey to 1,000 MW and could also shift the revenue mix more meaningfully toward solar, but management refused to speculate on timing or specifics.
- Investor engagement is restarting: Management admitted it has not spent enough time on investor engagement over the last year, focusing instead on internal performance improvement. A process of engaging with large FIs began a few weeks ago, and more is planned now that performance is robust enough to present.
Shivaraman: "The target is clear that we need to be there at a 1000 megawatts sooner rather than later, but exactly timelines and all that, it depends on too many things which are not entirely under our control."
State-Level Policy & Payment Dynamics
- Andhra Pradesh payments have normalized: The payment cycle is now fairly smooth with good cash flows, a marked improvement from historical difficulties.
- Tamil Nadu and other states are improving: Market indications suggest realization for renewable producers has improved dramatically over the last year, driven by a Central government push.
- Tamil Nadu policy changes are being monitored: Substantial policy changes are being watched and lobbied. Management's assessment is that changes appear more prospective than retrospective, likely affecting new assets rather than existing operating ones.
- Gujarat assets are insulated: The Gujarat portfolio is entirely on PPA with the electricity board, creating a stable situation where policy changes do not have an impact.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Solar project commissioning | 7 MW solar project completed and operational | December 2025 |
| Balance solar capacity | 18 MW greenfield solar construction completed | Before June 2026 |
| H2 generation | Q3 and Q4 generation similar to last year, plus or minus a few percent | Q3 and Q4 FY26 |
| H2 interest costs | Lower than last year due to debt repayment and interest cost reduction | Q3 and Q4 FY26 |
| Tamil Nadu repowering policy | Updated policy expected from state government | Next two to three weeks |
| Interest rate trajectory | Average interest rate to keep coming down; IREDA loan already reduced from 9.4% to 9.15% | Next year |
| Absolute interest cost | Slightly higher next year due to borrowing for expansion | Next year |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Total income | ₹135.45 cr, about 10% higher YoY |
| EBITDA | Not stated |
| Finance costs | Declined over 20% YoY, aided by lender refund of excess interest from earlier periods |
| Extraordinary income (interest refund) | ₹16 cr |
| Net profit margin | Improved significantly YoY, driven by lower interest costs |
| Operating wind assets | ~382 MW |
| Solar assets under development | ~25 MW (7 MW expected Dec 2025, 18 MW by Jun 2026) |
| PLF (Beta, major asset) | ~28%, vs ~24.5% in Q2 FY25 |
| Profitability improvement drivers | 60% from better wind, 40% from operational efficiency |
| Current debt | ~₹525 cr |
| Credit rating | BBB-, outlook upgraded from stable to positive (CRISIL) |
| Surplus cash flow expected in FY26 | At least ₹25–30 cr after debt service, for new capacity investment |
| Receivables | Less than 30 days average; Andhra Pradesh at 45 days (50 MW of 400 MW) |
| IREDA loan rate | Reduced from 9.4% to 9.15% |
| Generation split (Q1/Q2 vs Q3/Q4) | ~70% in H1, 25–30% in H2 |