Key Takeaways
- Operational resilience despite wind volatility: H1 generation held up and even increased year-on-year despite lower wind availability, driven by capacity additions and better machine availability.
- H1 PAT optically lower, operationally stronger: Reported PAT of ₹105.51 crores vs ₹109.56 crores masks a ~₹12 crore like-for-like improvement once the prior year's one-time ₹16 crore exceptional gain is excluded.
- Credit rating upgrade unlocks cheaper debt: The main subsidiary's upgrade to BBB, alongside the solar subsidiary's BBB rating, has helped drive borrowing costs down from ~11.5% to ~9.1% and positions the company for further reductions.
- Strategic action promised, not yet delivered: Management is "working very hard" on inorganic moves and shareholder returns, with a pledge of "significant action" before the fiscal year ends, but no deal is closed.
- What to watch next quarter: Whether the Beta and Clarion projects get grid connectivity, whether the promised strategic transaction materializes, and whether El Niño delivers the stronger Q3/Q4 wind management expects.
Generation & Operational Performance
- Wind availability was lower, output was higher: Overall wind availability in H1 was lower than the previous year, but capacity addition and better machine availability allowed generation to be maintained and increased, producing an overall surplus of generation and income for the half.
- Monsoon onset was substantially delayed: Compared to last year's early onset, this year's southwest monsoon was very much delayed, but its progress was mostly satisfactory so generation could recover.
- Atmospheric behavior defied analysis: In mid-September, Tamil Nadu state wind was at full blast and then dropped to practically nothing in 24 hours, a pattern management described as impossible to figure out.
- El Niño offers a Q3/Q4 tailwind, not a guarantee: Historically, a weaker main monsoon under El Niño means a stronger returning monsoon, which should lift Q3 and Q4 wind, but models cannot predict this with accuracy.
- Seasonality is structural and immutable: Q3 and Q4 are always weak quarters for wind generation; the bulk comes in Q1 and Q2, and that trend will continue because it is nature-driven.
T. Shivaraman: "We have had things happening in the atmosphere this year that we don't really, we can't figure out."
Capacity Expansion & Project Execution
- Rights issue objects are now complete: The 17.6 MW solar plant commissioned on September 26th joins the 7 MW plant commissioned in December '25, bringing total solar capacity to 24.6 MW and fulfilling the objects of the August 2024 rights issue.
- New wind capacity is coming online in pieces: About 10 MW of new wind capacity is already operational, one 3.3 MW turbine is ready for commissioning, and another will be ready in a couple of weeks, all subject to governmental approvals expected probably by end of December.
- Repowering progress is tangible but incomplete: A 7.8 MW repowering project is almost complete, awaiting commissioning pending statutory approvals.
- Two projects are stuck at the grid-connect finish line: The Beta and Clarion Wind Project is 100% construction-complete but awaiting the government green flag to connect, delayed by a change of government in Tamil Nadu that caused significant grid-connectivity approval delays and department churn.
- One substation has cleared the logjam: In one of the delayed projects, the substation was finally commissioned in the last 2-3 weeks, though the line from the substation to the turbine is still pending.
- The delay is bureaucratic, not hostile: Management attributes the holdup to "sheer bureaucratic goof-ups" rather than intent to delay, and expects things to straighten out in another 1-1.5 months.
- Commissioning timing is forgiving: Even a slight delay from December 31 to January 15 will not significantly impact generation because it is not the wind season; as long as commissioning happens in Q3 or early Q4, overall performance is unaffected.
T. Shivaraman: "So, the train is ready at the platform waiting for the conductor to give the signal."
Capital Allocation & Strategic Direction
- Wind is the future, solar is the hedge: Management will continue to be more wind-focused and may not expand solar capacity significantly except for hybrid balancing within wind repowering packages, because there is almost a surplus of solar generation capacity in the country and grid absorption issues in multiple states.
- Solar equity IRR is comparable but power sales are harder: Solar equity IRR is about 14%, more or less the same as wind, but management feels selling solar power will be more challenging than wind going forward.
- Organic growth alone will not move the needle: Adding 30-40 MW a year from internal accruals is described as a maintenance activity that will not create the step change in shareholder value being targeted.
- Inorganic conversations are reopening: Deal talks had gone to sleep due to market conditions but are now restarting; management hopes to do something in the very near future and is working on a "different structure" for acquiring assets, not necessarily fully with cash.
- A strategic transaction is being telegraphed: Management is working very hard on something and hopes to have something by the time of annual results, though everything is dependent on the market.
- Shareholder returns are promised but not quantified: Once comfortable that new machines and repowering are added, the extra cash cushion of ₹110-120 crores is available for distribution to shareholders; currently retained due to wind variance and the El Niño effect.
- Croatia is too small to bother selling: The asset is taking care of itself, generating and returning cash, but is too small to employ a banker to market and sell it; the effort of selling is not worth it.
- Land is being monetized selectively: Surplus land is being sold on an ongoing basis wherever parcels are not meaningfully useful or where land value exceeds value as a renewable energy asset, but some land is pledged to lenders who may not want to dilute security, and contiguous parcels are being protected for potential future solar projects.
T. Shivaraman: "I think you will see some significant action from us before the end of this fiscal."
Repowering Economics & Pipeline
- Repowering is a 75 MW near-term opportunity: 40-50 MW of wind projects are ripe for repowering right now, a 25 MW opportunity in Andhra Pradesh will be taken up next, and another 20-30 MW will become ripe 3-4 years from now.
- Phase 2 repowering awaits Tamil Nadu policy: Approximately 30 MW of repowering across two subsidiaries, consisting of machines that are not really performing, will start once the formal repowering policy is in place in Tamil Nadu; the regulatory commission was reconstituted about a month and a half ago and has not yet taken up the matter, though both OGPL and the Electricity Board are aligned.
- Repowering is not always the right answer: Management evaluates three options for older turbines: keep running, repower, or scrap and sell land. If a turbine's PLF is around 15%, it is more viable to use the money for greenfield than repower because the delta in PLF is only 15% but 100% of equity is deployed. Below 10% PLF, O&M costs become a meaningful percentage of revenue and running becomes not viable.
- No bias toward repowering or greenfield: Each project is evaluated based on better IRR, and the company balances both approaches.
T. Shivaraman: "We look at all these 3-4 options and only then decide whether we are repowering, scrapping and selling the land, or continuing to run the machine and doing greenfield."
Balance Sheet & Financing
- Borrowing costs have fallen sharply: The cost of debt has reduced from approximately 11.5% to approximately 9.1% over the last couple of years, aided by the credit rating upgrade.
- Further reduction is targeted but conditional: Management is targeting at least another 25 bps reduction in borrowing cost, but if the RBI increases rates, the aim shifts to at least maintaining the current cost of borrowing.
- Electricity board payments have improved materially: In the last couple of years, payments from electricity boards have been quite prompt; the industry has not been facing collection issues, resulting in a significant improvement in cash flow.
- Carried forward losses provide a tax shield: Total carried forward loss of about ₹800 crores exists, mainly due to depreciation because in IT depreciation is taken initially rather than spread over the life of wind assets.
- C&I is now bankable: Commercial and industrial customers give better returns than selling to the board, and while banks were historically uncomfortable with C&I and wanted some sell-to-board to balance cash flows, they have now accepted C&I as a good segment.
- The company is fully sold out: Until new capacity is added, there is no surplus power to sell and no ability to chase new customers.
Valuation & Market Perception
- Management believes the company is undervalued: The view is that OGPL is undervalued on an underlying asset value basis and "definitely undervalued" on an EV/EBITDA basis, with potential land assets and tax assets not being valued by the market.
- Listing has disadvantages for deal-making: Management acknowledged that being listed creates challenges, including PE mark-to-market issues, but did not directly answer whether going unlisted is being considered or would solve the valuation gap.
- Promoter buying is under consideration: Management is "looking at all the options" regarding promoter buying from the stock market.
- Per-MW valuation was declined: When asked what a good price per MW would be for OGPL's assets, management declined to give a figure, stating age is already factored into EBITDA and that slump sale vs. running company are different ball games.
T. Shivaraman: "We are undervalued even on an underlying asset value basis, and we are definitely undervalued on an EV/EBITDA basis."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Beta and Clarion Wind Project commissioning | Both projects to receive grid connectivity and commission | December and January, subject to government approvals |
| New wind capacity commissioning | One 3.3 MW turbine ready, another in a couple of weeks | By end of December |
| FY28 capacity addition | Approximately 30 MW, primarily wind repowering plus some new capacity and possibly solar for hybrid balancing | FY28 |
| BESS project | Approximately 10-15 MWh, sizing still being optimized | Almost certain during FY28; management still working on optimal capacity |
| Borrowing cost | At least another 25 bps reduction if RBI stays neutral, or maintain current cost if RBI hikes | Ongoing |
| Strategic transaction | "Significant action" — either dividends or acquisitions or something | Before the end of this fiscal |
| Phase 2 repowering (Tamil Nadu) | Approximately 30 MW across two subsidiaries | Once formal repowering policy is in place; regulatory commission yet to take up the matter |
| Andhra Pradesh repowering | 25 MW opportunity | To be taken up next |
| Shareholder returns | Cash cushion of ₹110-120 crores available for distribution once comfortable with new capacity | After new machines and repowering are added |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Total income | ₹146.57 cr, +8% YoY |
| EBITDA | ₹116.55 cr, +12% YoY |
| PAT | ₹81.57 cr, vs ₹80.94 cr in Q2 FY26 |
| H1 FY27 total income | ₹232.81 cr, +2% YoY |
| H1 FY27 EBITDA | ₹176.56 cr, +4% YoY |
| H1 FY27 PAT | ₹105.51 cr, vs ₹109.56 cr in H1 FY26; prior period included ₹16 cr one-time exceptional gain |
| H1 FY27 PAT excluding exceptional gain | ~₹12 cr higher than H1 FY26 on a like-to-like basis |
| FY26 full-year EBITDA | ₹205 cr |
| Weighted average cost of debt | 9.09%, down from ~11.5% over the last couple of years |
| Total outstanding debt | ₹563 cr approximately |
| Net debt (total debt minus DSRA) | ₹440 cr; DSRA of ₹81 cr |
| Cash available | ₹110–120 cr at any point in time |
| Beta subsidiary PLF (Q2) | 33.11%; H1 PLF was 26.82% |
| Solar PLF | ~25% |
| Total operational portfolio | ~381.7 MW in India |
| Solar capacity commissioned | 17.6 MW on Sep 26, 2026; total solar capacity now 24.6 MW |
| Wind capacity under repowering | 7.8 MW almost complete, awaiting statutory approvals |
| New wind capacity under EPC contract | 6.6 MW, partly debt-funded |
| Revenue from 17 MW solar project (annual) | ₹15.35 cr, EBITDA of ₹14.5 cr |
| Incremental revenue from 7.8 MW wind repowering | ₹9 cr from 1.7 cr units of incremental generation |
| Equity IRR on repowering project | 13.5–15%; solar equity IRR ~14% |
| Wind C&I weighted average tariff | ₹4.7 per kWh net to company |
| Power sold in C&I space | >70% to industrial customers in Tamil Nadu |
| Total carried forward losses | ~₹800 cr, mainly depreciation-driven |
| Credit rating | Main subsidiary upgraded by 1 notch to BBB; solar subsidiary also rated BBB |