Key Takeaways
- Double-digit growth guided despite LCA delays: Revenue grew 7% in FY26 to ₹33,050 crores, and management guides 10–12% minimum for FY27, betting on LCA Mark-1A and HTT-40 deliveries stabilizing by September.
- Order book swells to ₹2.55 lakh crores: Fresh orders of ₹97,028 crores, including the landmark 97 LCA Mark-1A contract, pushed the backlog to a record level that underpins years of visibility.
- Margins held at 30% with a promise to stay there: EBITDA margin was maintained at 30% in FY26, and management commits to 30–31% for FY27, even as the manufacturing mix grows.
- The engine supply chain is the single point of failure: GE has committed to 2 engines per month from August after resolving casting issues, but the global supply chain remains fragile and HAL’s FY27 plan hinges on that cadence holding.
- What to watch next quarter: Whether the first LCA Mark-1A delivery actually happens by September, the pace of GE engine arrivals against the 2-per-month promise, and any CCS movement on the Su-30 upgrade program.
The LCA Mark-1A Delivery Pivot
- The bottleneck is engines, not airframes: HAL has 21–22 LCA structures fully built with engine ground runs completed across its 3 production lines, none of which are idle. The hold-up is GE’s F414 engine supply, where casting issues and global supply chain disruptions have slowed arrivals.
- GE’s recovery plan is specific but unproven: GE found an alternative casting source and has committed to delivering 1 engine in June, then 2 per month from August, totaling 15–20 engines by year-end. HAL needs roughly 30–45 days from engine receipt to final delivery, so the first aircraft could ship by September if the August engines arrive on time.
- The technical refinements are a secondary drag: Management acknowledged that testing continues on certain parameters and that design-and-development projects go through iterations, but declined to detail the issues, calling progress “very positive.” The opacity leaves investors unable to size the residual certification risk.
- Inventory tells the story of delayed revenue: LCA inventory alone stands at ~₹8,000 crores within a total ₹33,000 crores inventory pool, reflecting the buildup of nearly finished aircraft waiting for engines. Revenue is recognized only at delivery, so this converts to sales only when engines arrive.
- Plan B exists but is undisclosed: Management expressed confidence in the 10–12% growth guidance and said it has a fallback if LCA or HTT-40 slip, but declined to specify what that plan is.
Ravi Kota: “June, we are expecting 1 engine now. Then afterwards, it is going to August. From August, they have committed 2. And then by end of this year around 15 to 20, yes, so because 15 is telling, yes, I would give, but a balanced one, you may get more which is still not committing.”
Order Book & Pipeline
- The 97 LCA Mark-1A contract dominates the backlog: The ₹97,028 crores in fresh orders lifted the total order book to ₹2,54,538 crores, with the 97-aircraft LCA deal as the headline. Management clarified that the entire contract value flows to HAL as revenue, with no split to other entities.
- The next wave is already visible: An anticipated pipeline of ~₹90,000 crores over the next two years includes 143 ALH for the Army, the IAF Su-30 upgrade, and upgrade of 40 Do-228 aircraft, all at various stages of approval.
- Su-30 upgrade is a long-dated catalyst: CCS approval is expected in the current financial year, but the design phase will take 5–6 years, so production revenue from the upgrade is roughly a FY32 story.
- Tejas Mark II is the next platform cycle: The prototype rollout is expected by March next year, with an order anticipated roughly two years after that, positioning Mark II as the growth driver beyond the Mark-1A program.
- ROH will get its own growth leg: Repair and overhaul revenue, currently 62% of the mix, stayed flat in FY26 because no new platform entered the ROH cycle. That changes when LCA begins its ROH cycle in about 3 years and more LCH platforms come up for overhaul.
Revenue Growth & Composition
- FY26 growth was diversified despite headwinds: Revenue grew 7% to ₹33,050 crores, driven by deliveries of ALH helicopters, AL-31FP engines, and RD-33 engines, which offset the LCA Mark-1A and HTT-40 delays. Spares sales dipped by ~₹500–600 crores, but ROH held steady.
- FY27 guidance bets on two new platforms: The 10–12% growth target rests on commencing LCA Mark-1A deliveries (15–20 aircraft planned) and HTT-40 deliveries (~20+ aircraft), both of which are first-time revenue contributors.
- Manufacturing is set to become the dominant segment: Manufacturing revenue rose from ₹7,957 crores to ₹9,227 crores in FY26 and now represents 28% of the mix. Management expects the composition to move toward 50-50 as LCA and HTT-40 ramp up, with ROH also growing as new platforms enter the cycle.
- Engine deliveries underpin the whole plan: Beyond the GE F414 engines for LCA, HAL targets ~32–35 AL-31FP engines and the final 15 RD-33 engines in FY27, plus ALH and HTT-40 deliveries that are all described as on track.
- The supply chain is fragile but costs are locked: Management stated that purchase orders were placed 1–2 years back and inventories are built up, so no material cost increase is expected for FY27. The global supply chain is causing slowness, not disruption, but it has not spared even big players like GE and Honeywell.
Barenya Senapati: “The inventories are there, and only some components may come, for which the purchase order has already been placed 1 year back or 2 years back. So there will not be any cost increase as such for '26-'27.”
Margins & Profitability
- EBITDA margin held at 30% in FY26: EBITDA grew 11% to ₹13,472 crores, and profit before tax rose 12% to ₹12,112 crores, with the margin maintained despite a shifting revenue mix.
- Guidance commits to 30–31% for FY27: Management expects to sustain margins at this level even as manufacturing, which carries different cost structures than ROH, grows toward half the revenue mix. No stress on profitability is expected from manufacturing contracts.
- Cost protection is built into contracts: Every contract carries an ERV clause that factors in material escalation, and labor escalation is also factored in. The combination, plus pre-placed purchase orders, gives HAL a natural hedge against input cost inflation for FY27.
- Provisioning is event-based, not formulaic: Last year’s ~₹800 crores provision was tied to a Su-30 accident replacement; no comparable event occurred in FY26, so the provision is lower. Management declined to give a stable-state percentage-of-revenue guidance because provisioning depends on specific events.
- Manpower cost is managed through a hybrid model: HAL is increasing efficiency, outsourcing full structures to partners while acting as the core integrator, and in-sourcing selectively to keep manpower costs low. Recruitment has not been closed but is being balanced against these levers.
Production Capacity & Infrastructure
- LCA capacity is built and running at 8 per year: The third production line at Nashik was inaugurated in October 2025, bringing total capacity to 8 LCA Mark-1A aircraft per annum. All three lines are continuously building structures and equipping them, with no idle capacity.
- HTT-40 has two operational lines: Production lines in Bangalore and Nashik are now operational, with Honeywell engine supply chain issues stabilized and engines expected to start arriving from next month. HAL plans ~20+ deliveries this year and expects to complete the program by FY30.
- ALH capacity is being augmented: The existing helicopter division facility has been expanded, and private vendors are supporting structure manufacturing, positioning HAL to stay ahead of schedule on the new ALH contract.
- A ₹12,000 crores capex cycle is underway through 2030: Investment is directed at manufacturing infrastructure for LCA Mark-II, GE 414 engines, IMRH engines, SSLV, indigenization of aero engine projects, and design-and-development facilities for IMRH and other programs. FY26 capex crossed ₹2,386 crores.
- R&D intensity remains high at 8.4% of revenue: FY26 R&D spend reached ₹2,794 crores, supporting programs from LCA refinements to future platforms like CATS Warrior (flight expected next year) and the rotary UAV (ground tests ongoing).
New Platforms & Strategic Moves
- HTT-40 is entering serial production: The first series-production aircraft completed its maiden sortie in October 2025, and with two lines now operational, HAL expects to sustain ~20+ deliveries annually through FY30.
- ALH Dhruv NG took its maiden flight: The indigenously designed and developed variant flew on 30th December 2025, adding a new model to the ALH family ahead of the anticipated 143-aircraft Army contract.
- Civil aerospace is a growing side bet: HAL signed an MoU with Russia’s UAC for SJ-100 civil commuter aircraft production in India, an agreement with Safran for LEAP engine rotating parts (powering A320neo and 737 MAX), and received DGCA certification for indigenous manufacturing of the Shakti Civil Engine.
- Space manufacturing is now in HAL’s portfolio: The SSLV Technology Transfer Agreement with ISRO, IN-SPACe, and NSIL gives HAL a non-exclusive license to manufacture the Small Satellite Launch Vehicle, adding a new revenue stream outside defense.
- AMCA and Su-57 are government calls, not HAL’s: HAL expressed hope to participate in AMCA production but noted the current RFI is only for the design-and-development prototype phase. On Su-57, management deferred entirely to the government.
Ravi Kota: “The supply chain issue is global. It has not spared anybody. Even the big players like GE or Honeywell, everybody is impacted by the supply chain.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue growth | 10–12% minimum | FY27 |
| EBITDA margin | Maintain at 30–31% | FY27 |
| LCA Mark-1A first delivery | Stabilize and begin deliveries | August–September 2026 |
| LCA Mark-1A delivery volume | 15–20 aircraft | FY27 |
| GE F414 engine supply | 2 engines per month from August; 15–20 total by year-end | FY27 |
| HTT-40 deliveries | ~20+ aircraft | FY27 |
| HTT-40 program completion | All deliveries complete | By FY30 |
| Tejas Mark II prototype rollout | First prototype | Last quarter FY27 (by March) |
| Tejas Mark II order | Contract award | ~2 years from now |
| Su-30 upgrade CCS approval | Government approval | FY27 |
| Su-30 upgrade production start | After 5–6 year design phase | ~FY32 |
| Order pipeline conversion | ~₹90,000 crores in additional orders (including ROH) | Next 2 years |
| Capex program | ~₹12,000 crores investment in manufacturing infrastructure | By 2030 |
| Revenue composition | Manufacturing and ROH to reach 50-50 mix | No fixed date |
Key Metrics
| Metric | FY26 |
|---|---|
| Revenue from operations | ₹33,050 cr, up 7% YoY from ₹30,981 cr |
| Manufacturing revenue | ₹9,227 cr, up from ₹7,957 cr in FY25 |
| ROH revenue | ₹20,524 cr |
| Export revenue | ₹501 cr, up from ₹400 cr in FY25 |
| EBITDA | ₹13,472 cr, up 11% YoY from ₹12,168 cr |
| Operating EBITDA margin | 30%, maintained at previous year level |
| Profit before tax | ₹12,112 cr, up 12% YoY from ₹10,820 cr |
| Capex | ₹2,386 cr |
| R&D expenditure | ₹2,794 cr, 8.4% of revenue |
| Order book | ₹2,54,538 cr, up from ₹1,89,302 cr as on 1 Apr 2025, after liquidation of ₹31,792 cr turnover |
| Fresh orders received | ₹97,028 cr (manufacturing ₹69,668 cr, ROH ₹26,539 cr) |
| Revenue growth guidance (FY27) | 10% to 12% minimum |
| EBITDA margin guidance (FY27) | 30% to 31% |
| LCA delivery target (FY27) | 15 to 20 aircraft |
| HTT-40 delivery target (FY27) | 20-plus aircraft |
| AL-31FP engine delivery target | 32 to 35 engines per annum |
| RD-33 engines remaining | 15 engines, all to be delivered in FY27 |
| LCA inventory (including raw material and WIP) | ~₹8,100 cr |
| Expected orders pipeline (next 2 years) | ₹90,000 cr, including ROH |
| Planned capex investment by 2030 | ~₹12,000 cr |
| Revenue composition | Manufacturing 28%, ROH 62%, other 10% |