Key Takeaways
- Operationally steady, but margins squeezed: Performance was similar to recent quarters, yet the spread between electrode and needle coke prices keeps narrowing, sustaining margin pressure.
- Anode plant delayed, not derailed: Commissioning pushed to FY26-27 as battery prices crashed, but management insists project IRRs remain "very, very viable" and customer pilot projects are underway.
- HEG is the last man standing: While 3-4 global competitors announced plant closures, HEG expanded to 100,000 tons and is running at 75-80% utilization as the lowest-cost producer.
- One-time hits obscure the core: A mark-to-market loss on a treasury investment and a GrafTech write-off dragged PBT, but inventory levels are normal and the operational engine is intact.
- What to watch next quarter: Any signal that electrode demand is turning (management hopes "as early as '25"), progress on anode power-cost negotiations with state governments, and resolution of the INR282 crores GST show cause notice.
Graphite Electrode: Cycle & Competitive Position
- Pricing pressure persists: Electrode prices remain under pressure from reduced demand, while needle coke costs kept correcting through the past year. The spread between the two narrowed, squeezing margins for the last 6-7 quarters.
- Chinese steel exports are the root cause: Large Chinese steel exports, potentially over 10 crore tons in 2024, at cheap prices suppress steel production in other countries, directly reducing demand for graphite electrodes.
- Competitors are shutting down: 3-4 graphite plants in Europe, America and Japan announced closures in the last 12-18 months, unable to survive the current pricing and risk environment.
- HEG used the downturn to expand: The expansion from 80,000 to 100,000 tons is fully complete and all new facilities are running smoothly. HEG is now the largest single-location plant in the Western world, with a cost advantage over other large producers.
- Capacity utilization leads the industry: HEG is operating at 75-80% capacity even in a bad market, the highest utilization among all global peers, while competitors bleed. Management expects to be close to 75% for the full year.
- Greenfield EAF capacity is the recovery thesis: Over 10 crore tons of new Greenfield EAF capacities have been announced to operate between now and 2030, with roughly 6.4 crore tons likely operational by 2027. This implies 100,000 to 125,000 tons of additional electrode demand in the next 3 years.
- HEG will have spare capacity when the cycle turns: When the market changes, HEG will be the only producer with an extra 20,000 tons of capacity ready to sell. Management admits the expansion timing was not perfect but is not disappointed.
Ravi Jhunjhunwala: "Decarbonization has now become an irreversible process. We are constantly tracking more and more announcements of the new Greenfield electric arc furnaces from different parts of the world."
Ravi Jhunjhunwala: "Of course, you cannot time the expansion perfectly, but we are not disappointed that we expanded and we spent INR 1,200 crores. It could have been delayed by 1 year, but nobody can time it exactly."
Graphite Anode: Delay, Viability & Strategy
- Plant commissioning pushed to FY26-27: The target has moved forward by 1-2 quarters due to a battery price crash from $85-90/KWH to $55/KWH in the last 8-12 months, delays in other Indian battery plants, and ongoing power price renegotiations with state governments.
- Project economics remain intact: At $7,000-$8,000 per ton, the anode project is still "very, very viable" with excellent IRRs. Below $7,000, electricity cost becomes the critical competitiveness factor. Anode prices fell from $10,000-$12,000 to $6,000-$8,000 per ton depending on application.
- Chinese overcapacity is dumping prices below cost: Chinese companies are selling anode material below their variable cost due to massive overcapacity, but management believes this is unsustainable and demand is "absolutely one way, which is upwards."
- Power cost is the strategic battleground: Management is renegotiating with the Madhya Pradesh government to allow third-party or captive power purchases without surcharge, and evaluating other states like Odisha with cheaper power. Saving INR1-2 per unit translates to potential savings of INR20,000 per ton.
- Project can be split geographically: The graphitizing step, which consumes maximum power, could be located in any state in India or even outside India to optimize costs, while other processes stay in Madhya Pradesh.
- Customer readiness is being built now: Indian battery companies like Exide and Ola currently import anode material from China (90% market share) but are running large pilot projects with HEG, aiming to switch to Indian sources when HEG's plant is operational.
- NITI Aayog demand signal: India projects 80-130 GWh of battery production by 2030, implying 80,000-130,000 tons of anode demand, a market HEG is positioning to capture.
- Anode EBITDA margins: At USD7,000 per ton, EBITDA margins are around 20%; if power prices are reduced further, margins can reach 25-26%.
Riju Jhunjhunwala: "So while the demand for anode is absolutely one way, which is upwards, the prices at which Chinese companies are selling today is below the variable cost as of date because of the large overcapacity that they have created."
Riju Jhunjhunwala: "If we can save INR1 over there or INR2 over there, you're talking about potential savings of INR20,000 per ton as far as this is concerned."
Restructuring & Greentech
- Demerger progressing through approvals: The scheme of arrangement is currently with SEBI and stock exchanges pending approval, after which NCLT approval is required. The process is expected to be completed by the middle of next year.
- HEG Greentech's scope is broadening: The new entity will play a role in both battery and pumped hydro, potentially as an EPC contractor or consultant. The BESS business (RePlus) is seeing "very, very strong" business development in India and outside, and should contribute good value to the Greentech business.
- Pumped hydro project shelved: The planned pumped hydro scheme at HEG's own hydro plant in Himachal Pradesh has gone "into the back burner" because the state government is lagging in implementation. The Himachal Electricity Board wants an additional 15-20% free power from added pumped storage generation on top of the 15-20% already paid, making the project unviable.
- Ownership structure still fluid: HEG Greentech will hold 51% of Malana Power post-restructuring, but the exact percentage based on Bhilwara Energy valuation "will depend on the exact valuation" and was not disclosed.
Ravi Jhunjhunwala: "So Himachal Electricity Board wants another 15%, 20% free power out of this added generation of pumped storage. So after giving that 15%, 20% a second time, it doesn't remain viable."
Financial Items: One-Time Hits & Contingencies
- PBT dragged by mark-to-market loss: Profit before tax declined versus the past quarter due to a one-time mark-to-market loss on a treasury-related equity investment, booked under other expenses. Management is bullish on this investment in the medium to long term.
- GrafTech investment written down: An INR30-31 crores write-off was taken on the GrafTech investment this quarter, booked as other expenses per Ind AS and the auditor's suggestion. GrafTech faces a potential delisting risk as its stock price fell below $1, though management believes GrafTech has mitigation options like a reverse split.
- GST show cause notice of INR282 crores: Management says prima facie the demand is not correct, the legal team is evaluating, and a reply will be filed shortly. No provision has been disclosed.
- Inventory levels are normal: Finished goods, work-in-process and raw material inventory are at very normal levels with no overhang of higher costs, suggesting the margin pressure is pricing-driven, not inventory-driven.
- Spread outlook is uncertain: Management declined to give a number on the future spread between needle coke prices and graphite realization, calling it "anybody's guess" and noting needle coke prices are always connected to electrode prices.
Pricing Discipline & Competitive Conduct
- No unilateral price hikes possible: Management rejected an analyst's suggestion to raise electrode prices aggressively from $3,500 to $12,000 per ton, stating they cannot arbitrarily sell at higher prices than peers in a competitive market.
- Collective price action is cartelization: Management explicitly stated that coordinated price hikes across the industry would mean "going to jail" and that HEG has never engaged in cartelization.
- Lowest-cost position is the real moat: HEG's strategy is to survive the downcycle as the lowest-cost producer, running at high utilization while competitors close plants, positioning to capture demand when it returns.
Riju Jhunjhunwala: "I mean that would mean going to jail. I mean, if you're looking at something like cartelization, that is something that, HEG, as a company, we've never engaged in."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Electrode capacity utilization | Close to 75% for the full year | FY25 |
| Electrode demand recovery | Hoping demand comes back; "I hope as early as '25" but "cannot pinpoint when" | Sometime from 2025 onwards |
| Anode plant commissioning | Plant pushed forward by 1-2 quarters; "most definitely" up when battery producers start | FY26-27 |
| Demerger completion | Scheme of arrangement to complete post SEBI, stock exchange and NCLT approvals | Middle of next year |
| Anode EBITDA margins | 20% at USD7,000/ton; 25-26% if power prices reduced further | At plant commissioning |
| New EAF capacity driving electrode demand | 100,000-125,000 tons of additional electrode demand from ~6.4 crore tons EAF capacity | By 2027 |
| India anode demand | 80,000-130,000 tons from 80-130 GWh battery production | By 2030 |
Key Metrics
| Metric | Q1 FY25 |
|---|---|
| Revenue from operations | ₹571 cr, vs ₹671 cr in Q1 FY24 |
| EBITDA | ₹59 cr, vs ₹178 cr in Q1 FY24 |
| Standalone net profit after tax | ₹3 cr, vs ₹98 cr in Q1 FY24 |
| Consolidated net profit after tax | ₹23 cr, vs ₹139 cr in Q1 FY24 |
| Treasury size | ₹917 cr as on June 30, 2024 |
| Capacity utilization | Close to 80% in Q1 FY25; expected close to 75% for full year FY25 |
| Graphite electrode capacity | 100,000 tons, expansion from 80,000 tons fully complete |
| Mark-to-market loss on equity investment | ₹30–31 cr, booked under other expenses |
| Graphite anode plant capex spent to date | ~₹60 cr, of which ₹30–35 cr on land |
| Malana consolidated EBITDA (FY24) | ~₹350 cr |
| HEG Greentech post-restructuring stake in Malana Power | 51%, with Statkraft holding 49% |
| Anode price guidance (EV applications) | $7,000–$8,000 per ton, down from $10,000–$12,000 previously |
| Anode project EBITDA margin at $7,000/ton | ~20%, or 25–26% if power costs are reduced |
| New EAF capacity announced globally (ex-China) | ~10 crore tons, to be operational by 2030; ~6–6.5 crore tons by 2027 |
| Electrode demand increase expected | 100,000–125,000 tons in the next 3 years |