Key Takeaways
- Recovery quarter, pricing still weak: Revenue rose to INR613 cr and EBITDA jumped to INR154 cr, but graphite electrode prices remain "unsustainably low" and a demand-led recovery is still quarters away.
- Capacity expansion signals confidence: A 15,000-ton expansion (INR650 cr, 2.5 years) was announced despite stagnant industry demand, betting on the structural EAF transition and eventual competitor exits.
- GrafTech stake is a leveraged bet on the cycle: The ~10% holding is a thesis on twin needle-coke-plus-electrode upside; management sees a turnaround "in the next few quarters" but has no non-public information.
- Margins improved sharply but are flattered: Operational EBITDA hit 23% this quarter, but mark-to-market gains on the GrafTech investment confuse the picture; excluding them, EBITDA is stable and likely to stay that way near-term.
- What to watch next quarter: Whether industry utilization inches toward the 80-85% threshold that management says triggers price firming, any clarity on US tariff mitigation, and progress on the anode plant capex timeline.
Demand & Pricing Environment
- Steel production is the anchor: Global steel output fell 1.9% YoY, with China down 2.4% and the rest of the world down 1.2%; India was the outlier at 9.2% growth. Graphite electrode demand tracks this directly.
- Prices are at a floor, not a recovery: Management described current electrode prices as "unviable" for producers; pricing was flat sequentially with only a very slight increase, and firming requires steel production to show a healthy turnaround.
- The utilization trigger: Industry graphite electrode utilization crossing 80-85% is the stated threshold for price firming; management estimates the industry is "a little away from that" and offered no firm timeline.
- US pricing dynamics: US customers tend to pay a slight premium for quality and service; the 25% duty gives US producers an opening to raise prices, though HEG is still studying the impact on its own exports.
- China's role is contained: China exports mostly HP and non-UHP grade electrodes for ladle furnaces, not the UHP grade that dominates HEG's mix; management cannot comment on internal Chinese capacity closures.
Manish Gulati: "The moment all industry capacity utilizations of graphite electrode industry crosses 80%, 85% then of course, there's firming up of prices. So we are a little away from that. Maybe it takes two quarters, three quarters, I don't know. But yes, every electrode company in the world needs the price to rise because it's an unviable price to work on."
Capacity Expansion & Supply Rationalization
- HEG is adding 15,000 tons: The expansion from 100,000 to 115,000 tons requires INR650 cr of capex, will take 2.5 years, and targets production by January-March 2028; it does not include a captive power plant.
- The build-vs-buy logic: Management is in contact with a major international producer that has formally announced an exit, but believes building in India is more competitive than acquiring old Western plants, citing significantly lower domestic costs.
- Western capacity is exiting: Some electrode capacities have closed in the Western world over the last 2-3 years, creating excess needle coke availability; management questions whether 60-70-year-old European and Japanese plants can easily restart after being idle for years.
- Indian supply additions are a known risk: An analyst flagged that HEG's 15 Kt plus a competitor's 25 Kt expansion could delay utilization improvement; management responded by citing new EAF capacity driving demand, not directly addressing the supply-side concern.
- Capex returns: Management expects a double-digit IRR on the new expansion, with payback lower than 4-5 years.
Ravi Jhunjhunwala: "We believe that it is still better to spend 2.5 years and to build more capacity in our own country, where our costs are significantly lower than if we were to acquire any plant in any Western world."
Structural Demand: The EAF Transition
- The long-term thesis is intact: The global shift to EAF steelmaking, which emits 20-22% less carbon than blast furnaces, is accelerating; roughly 10 crore tons of new EAF capacity is expected in the Western world over the next 4-5 years.
- Utilization is already high at HEG: The company operated at 90%+ utilization in Q1 on its expanded 100,000-ton base, described as the highest in the industry; for the remaining three quarters, utilization should be around 85%.
- Cost position matters: HEG's single-location, large-scale production base makes it one of the lowest-cost producers globally, a structural advantage if prices stay depressed.
- HP grade is a margin drag: HP grade, which is 25% of the business, faces persistent competition from low-priced Chinese products and has always carried lower margins than UHP.
GrafTech Investment
- The stake: HEG holds approximately 10% in GrafTech, bought under the OPI route which caps ownership at that level; management has no intention of switching to the ODI route to go higher.
- The thesis: GrafTech is the only graphite company with backward integration into needle coke; when electrode prices rise, needle coke prices follow, giving GrafTech a twin advantage that management believes is not priced into its market cap, which was roughly one-third of HEG's at the time of investment.
- Turnaround expectations: Management is positive about GrafTech's business turning "in the next few quarters" and believes "it might turn very swiftly," but acknowledged it is not privy to information beyond GrafTech's public disclosures.
- Risk acknowledged: When asked about GrafTech's operating cash loss and liquidity runway, management said it always evaluates investments diligently and will take a call if the Board feels the investment is going "on a different route."
- Mark-to-market distortion: The GrafTech stake creates mark-to-market swings that confuse HEG's reported EBITDA; excluding them, operational EBITDA has been stable in the last two quarters and is likely to stay that way in the July-September quarter.
Ravi Jhunjhunwala: "So when the electrode prices start rising on the back -- on the background of demand, the needle coke prices also go up. So when that happens, that will be the only graphite company, which will have a twin advantage of increased prices of needle coke and increased prices of electrodes."
Anode Plant & Greentech
- Anode plant is on track: HEG Greentech is setting up a 20,000-ton anode plant, operational by March 2027, with revenue visible after that date.
- Capex is substantial and could rise: Total anode capex is INR1,800-1,900 cr; HEG has put in INR750 cr of equity with the rest through financial closure; management noted the capex "could also increase" as machinery orders progress.
- Combined capex outflow: This year could see INR1,000 cr of cash outflow across anode and graphite electrode capex combined, described as manageable; interim debt is expected for the expansion while financial closure on the anode project is underway.
- Greentech today: Currently only hydro assets contribute to HEG Greentech; exact revenue and profitability will be visible only after the merger and demerger are complete.
Tariffs & Trade Policy
- US 25% duty is being studied: The imposition is very new, and discussions between the two countries are ongoing; HEG expects minimal impact due to its diversified sales footprint.
- Mitigation options are nascent: Management has heard of options involving importing raw material from the US to adjust the duty, but stressed these ideas are only days old and require legal opinion before any conclusion.
- No clarity on Chinese electrode duties: When asked about price pressure from Chinese HP exports due to the tariff war, management spoke about duties on Chinese electrodes generally rather than the specific competitive pressure on HEG.
Ravi Jhunjhunwala: "We have heard of a couple of options wherein by importing some raw material from U.S., the duty gets adjusted. But it's very, very new. I mean all these things have just come up in the last three, four, five days. So we are in the middle of studying all that, and we are probably going to take some legal opinion before we come to a conclusion."
Demerger & Corporate Structure
- Scheme filed: The demerger scheme has been filed with stock exchanges and relevant authorities; NCLT approval is expected by the end of calendar year 2025.
- Investor clarity post-demerger: The demerger is expected to separate the graphite and Greentech businesses, making revenue and profitability of each entity visible independently.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Capacity expansion | 15,000-ton addition, INR650 cr capex, production start | January-March 2028 |
| Demerger completion | NCLT approval | End of calendar year 2025 |
| Anode plant operational | 20,000-ton plant, revenue visible after | March 2027 |
| Operational EBITDA stability | Excluding mark-to-market, EBITDA stable | July-September quarter |
| Utilization | ~85% for remaining three quarters | FY26 |
| Capex cash outflow | ~INR1,000 cr across anode and graphite capex | FY26 |
| GrafTech evaluation | Board will take a call if investment goes "on a different route" | Ongoing |
Key Metrics
| Metric | Q1 FY26 |
|---|---|
| Revenue from operations | ₹613 cr, vs ₹571 cr in Q1 FY25 |
| EBITDA | ₹154 cr, vs ₹59 cr in Q1 FY25 |
| Standalone net profit after tax | ₹72 cr, vs ₹3 cr in Q1 FY25 |
| Consolidated net profit after tax | ₹105 cr, vs ₹23 cr in Q1 FY25 |
| Operational EBITDA margin (excl. mark-to-market) | 17%, vs 17% in FY24-25, 21% in FY23-24, 28% in FY22-23 |
| EBITDA margin (incl. mark-to-market) | 23%, vs 17% in FY24-25 |
| Treasury size | ₹977 cr as on 30th June 2025 |
| Capacity utilization | 90%+ on expanded capacity of 100,000 tons |
| Export-domestic mix | 70:30, unchanged |
| HP grade share of business | ~25% |
| U.S. share of sales | 8% to 10% (U.S.A. only, excluding Canada and Mexico) |
| Graphite electrode industry utilization (ex-China) | ~60% to 65%, one peer at 65%, others estimated ~60% |
| New capacity expansion | 15,000 tons (to 115,000 tons total), capex of ₹650 cr, completion by Jan-Mar 2028 |
| Anode plant capex (HEG Greentech) | ₹1,800 cr to ₹1,900 cr for 20,000 tons, HEG equity of ₹750 cr, operational by Mar '27 |
| GrafTech stake | ~10%, held via OPI route |