Key Takeaways
- Demand hit, but inventory bet held: Revenue fell 17% QoQ as European steelmakers deferred orders, yet HEG kept plants at full capacity and chose to build electrode inventory rather than cut output, betting the downturn is a short-term blip.
- GrafTech’s Mexico closure is a live catalyst: The shutdown of a 60,000-ton plant, the sole source of nipples for GrafTech’s electrode system, is already redirecting inquiries and new orders to HEG, with a material volume opportunity if the disruption persists beyond six months.
- Anode diversification is now a funded, dated plan: A ~Rs. 1,000 crore Phase 1 (10,000 tons) targets commercial production by April 2025, with margins expected significantly above the electrode business and a Phase 2 of equal size already telegraphed.
- Pricing pressure is near-term and quantified: Q3 electrode realizations guided 3–4% lower sequentially, with Q4 either staying under pressure or reverting to Q2 levels depending on demand recovery.
- What to watch next quarter: Whether the GrafTech-driven order trickle converts into volume, the pace of inventory liquidation, and any firming in Q4 pricing as the expansion’s final processes commission.
Electrode Demand & the GrafTech Disruption
- Q2 weakness: Electrode offtake fell as European steel producers pushed back orders and production slowed in other geographies; Europe’s volume share slipped from ~10% to 7–8%.
- Near-term visibility: Management sees lower demand continuing in the current and next quarter, with Q3 sales volume expected in the mid-60,000-ton range, down from the low 70,000s in Q2.
- GrafTech catalyst: GrafTech’s Mexico plant, with 60,000 tons of annual capacity and the only site producing nipples for its electrode system, has been closed for approximately two months. Without nipples, electrodes cannot be sold or used, and GrafTech has no operating US electrode facility.
- Order shift underway: HEG is already seeing movement in inquiries, pace of negotiation, and new orders trickling in as demand redistributes to the remaining two or three global electrode producers.
- Inventory bet: HEG made a conscious decision to keep finished electrode inventory rather than needle coke, judging the downturn a short-term blip that does not tie up significant capital; the company expects to liquidate excess inventory if a large part of GrafTech’s sales volume comes offline.
Ravi Jhunjhunwala: “Going forward if this problem continues for let's say the next even 6 months, then it is a problem. It is a problem for the whole industry then whatever tonnage is available with GrafTech will get hampered and they have clearly said that in their recent reporting to the SEC.”
Pricing & Realization Trajectory
- Q3 guidance: Average electrode price expected to decline approximately 3% to 4% versus Q2.
- Q4 conditional outlook: If current conditions persist, January–March pricing remains under pressure; if demand turns around, pricing can revert to Q2 levels.
- NSR opacity: Management declined to disclose the current net sales realization figure, directing analysts to calculate it from reported revenue and capacity utilization.
- Cost advantage: HEG’s conversion costs and fixed costs are among the lowest of all graphite producers, with the total cost of converting needle coke to finished electrode described as not very significant, providing a buffer in a softening price environment.
Ravi Jhunjhunwala: “In our case the conversion costs being fairly low, our fixed costs are probably the lowest amongst all the graphite producers. The total cost of converting needle coke to finished electrode is not very significant.”
Capacity Expansion & Utilization
- Expansion timeline: Four of six processes for the 80,000-to-100,000-ton expansion are already commissioned; the fifth commissions in the next two to three weeks; the last by early January, with full 20,000 tons of additional capacity available from April–May.
- Current utilization: Plants running at 92–94% in recent quarters despite demand softness; management intends to continue full-capacity production at least through the current quarter, even as sales volumes lag production.
- Absorption expectation: The additional 20,000 tons is expected to reach 90% capacity utilization within one to two years, by end of 2023 or 2024, as new EAF demand comes online globally.
- Power arrangement: The existing power purchase agreement with Madhya Pradesh Electricity Board covers the expanded capacity; the captive 65 MW coal plant has not been operated for 2–2.5 years because grid power is significantly cheaper.
EAF Growth & Medium-Term Demand
- US greenfield pipeline: Management cited publicly announced EAF capacity additions of 20–25 lakh tons, with 6.5–7 lakh tons starting in the next 3–4 months, another 10–12 lakh tons by end of 2023, and the remainder from early 2025 onward. Named projects include Steel Dynamics (Corpus), North Star/Bluescope, Nucor (Gallatin and Brandenburg), CMC (Arizona, two plants), ArcelorMittal, Algoma, and USG.
- EU transition: Approximately 1.6 crore tons of blast furnace capacity to be replaced by EAF starting from end of 2023.
- China shift: China increasing EAF share to approximately 20%.
- Confidence anchor: Management views medium-to-long-term EAF growth as unquestionable, which underpins the current expansion investment.
Ravi Jhunjhunwala: “We feel that medium to long term growth of EAF is unquestionable which keeps us confident of the growth prospects of our industry and that's where our current expansion kicks in.”
Graphite Anode Diversification
- Phase 1 commitment: Board approved a budget of approximately Rs. 1,000 crores for a 10,000-ton graphite anode plant for lithium-ion cells, to be housed in a newly formed wholly owned subsidiary. Investment is spread from March 2023 to March 2025, with commercial production targeted by early 2025.
- Phase 2 intent: A second phase of another 10,000 tons, with an additional ~Rs. 1,000 crore investment, is planned after Phase 1 is successfully implemented.
- Location: Not yet finalized; two or three options within Madhya Pradesh are being evaluated, and the plant will not be at the existing Mandideep facility.
- Domestic demand anchor: By 2025, a conservative estimate of 50 GWh of battery cell demand in India implies on a very pessimistic side annual graphite anode demand of 50,000 tons just for the domestic market.
- Margin expectation: Anode business margins are expected to be significantly higher than current electrode business margins, supported by raw material cost as a percentage of selling price being significantly lower than in electrodes.
- Pricing stability: Anode powder selling prices have been stable over the last five to seven years and are not expected to decline drastically, because global demand will rise substantially and a demand–supply mismatch will always be there and then you have this 2-year lag.
Riju Jhunjhunwala: “Our electrodes business as you know well it fluctuates between year-and-year but if you take the current margins that we have in our electrode business the margins in the anode business should be significantly higher than that.”
Costs, Inputs & Financials
- Needle coke: Procurement prices have been flat for the last three quarters with no significant increase; no shortage in the market due to slowing offtake by major graphite producers.
- EBITDA: Q2 EBITDA including other income was Rs. 198 crores, slightly down from Rs. 205 crores in Q1, supported by rupee depreciation, higher profits from hydropower generation facilities in Madhya Pradesh and Himachal, and higher income from associate Bhilwara Energy’s hydro operations, all helped by an early monsoon and substantially higher power prices in H1 FY23.
- Employee costs: Increased year-on-year due to annual increments in service incentives and provisioning for profit-related commissions payable to the CMD and ED under contractual terms.
- Finance costs: Rose due to the RBI repo rate hike from 4% to 5.9%, movement in external benchmarks like MIBOR and T-Bills, increased working capital requirements, and reduction of interest subvention from RBI from 3% to 2%.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Electrode expansion completion | All six processes commissioned; full 20,000 tons additional capacity available | Last process by early January; commercial production from April–May |
| Q3 electrode pricing | Average price ~3–4% lower vs Q2 | Q3 FY23 (October–December) |
| Q4 electrode pricing | Under pressure if conditions persist; reverts to current price level if demand turns | Q4 FY23 (January–March), conditional on demand recovery |
| Graphite anode Phase 1 | ~Rs. 1,000 crores CAPEX for 10,000 tons; commercial production | Investment spread March 2023–March 2025; production latest by April 1, 2025 |
| Graphite anode Phase 2 | Additional ~Rs. 1,000 crores for second 10,000-ton line | After Phase 1 successfully implemented |
| New capacity absorption | Additional 20,000 tons to reach 90% utilization | Within 1–2 years (2023 and 2024) |
| Market turnaround expectation | Electrode demand recovery | “Maybe in one quarter, maybe in two quarters” |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue from operations | ₹598 cr, -17% QoQ and +15% YoY |
| EBITDA including other income | ₹198 cr, vs ₹205 cr in Q1 FY23 and ₹167 cr in Q2 FY22 |
| Net profit after tax | ₹130 cr, vs ₹134 cr in Q1 FY23 and ₹113 cr in Q2 FY22 |
| Treasury size | ~₹1,250 cr, company is long-term debt free |
| Electrode capacity utilization (production) | 92%–94%, running at this level for last six quarters |
| Electrode sales utilization | Early 70s (percent of capacity), vs early 90s in Q1 FY23; Q3 FY23 expected in mid-60s |
| Electrode inventory | ~1.5 months of inventory, vs 1 month considered normal |
| Electrode pricing trend QoQ | Virtually unchanged vs Q1 FY23; Q3 FY23 expected average price ~3%–4% lower |
| Needle coke pricing trend | Stabilized, no significant increase for last three quarters |
| Graphite anode Phase 1 capex | ~₹1,000 cr for 10,000 tons of capacity, spread over March 2023 to March 2025 |
| Graphite anode Phase 1 commercial production target | Latest by 1st April, 2025 |
| Graphite anode expected turnover-to-capex ratio | ~1:1 |
| Graphite anode per-unit realization vs electrodes | More than double the graphite electrode business |
| Electrode expansion capex pending | ₹200 cr, expected completion by March 2023 |
| GrafTech Mexico plant impact on their sales | 50% of their sales volume potentially impacted in H1 CY23 if plant remains closed; Oct–Dec quarter sales down 25%–30% |