Key Takeaways
- Demerger complete, capex cycle accelerates: HEGAM now a standalone advanced-materials platform, with anode, graphene and RePlus capacity expansions all tracking to on-time delivery and funded from a net-cash position.
- Anode capacity doubled on customer pull: The Dewas plant target rose from 20,000 to 44,000 metric tons, driven by signed LOIs that already exceed Phase 1 capacity; Phase 1 commissioning remains June 2027, with Phase 2 scaling to 44,000 by March 2029.
- Graphene order book validates the thesis: 90 metric tons of confirmed orders and LOIs are in hand, with execution starting H2 FY28, giving cover to ramp the commercial plant to 500 metric tons.
- Power EBIT flattered by one-offs: The 64% QoQ EBIT jump includes a large, non-recurring transmission-line arrears receipt and insurance gains, with approximately 40% of the Power segment EBIT being one-time; the underlying generation business remains seasonal and weather-dependent.
- What to watch next quarter: The HEG Graphite listing (third week of November), any quantified government incentive package, and whether RePlus begins converting its EMEA pipeline into booked revenue.
Demerger & Platform Identity
- Clean separation executed: HEG Limited now operates as a pure-play graphite electrode platform; HEGAM houses the advanced materials (anode, graphene, crucibles) and clean energy (hydro, wind, solar, RePlus) businesses.
- HEG Graphite listing imminent: The original graphite electrode entity is expected to list by the third week of November 2026, pending final approvals.
- Graphite electrode details deferred: Management declined to address a 20–23% QoQ sales decline in graphite electrodes on this call, pointing investors to a separate conference call roughly one week after Diwali.
- Balance-sheet strength preserved: The group is comfortably net cash positive, with ₹1,300 crores of cash against ₹1,036 crores of long-term borrowing, and management reiterated a commitment to a healthy, risk-free balance sheet.
Riju Jhunjhunwala: "The successful completion of our demerger with HEG Limited now operating as a pure-play graphite electrode platform and HEGAM stands proudly on its feet as a dedicated future-facing advanced materials and clean energy powerhouse."
Anode: Capacity, Margins & Competitive Moat
- Capacity scaled to 44,000 tons: Phase 1 (20,000 tons) tracks for June 2027 commissioning; Phase 2 adds 24,000 tons by March 2029 on the same 105-acre Dewas site and power footprint.
- Demand-led, not ambition-led: Management stated the decision to expand was driven by 3–4 signed LOIs already in hand, with 3–4 more expected in coming months; cumulative demand from these would exceed 44,000 tons if added up, though management noted they are still in the process of signing.
- First-mover window is real: HEG will be the first to market by 2027, with competitors still needing 12–18 months for pilot plant, testing and accreditation. [14–15]
- Margin stack improving: Standalone anode EBITDA is guided at 28–33%; with in-house crucible backward integration, the blended margin rises to north of 35%, management confirmed.
- Capex efficiency at scale: The incremental 24,000 tons comes at ₹6 lakh/ton versus ₹11 lakh/ton for the first 20,000 tons, pulling the blended capex to ~₹9 lakh/ton.
- Raw material supply de-risked: Coke and power account for over 60% of anode cost; the company will source green petroleum coke from non-Chinese suppliers (U.S., U.K., Japan) who already serve HEG’s 100,000+ ton graphite electrode operations and have given supply confidence, though discussions are still advanced.
- Technology path is proven, not experimental: 98% of Chinese anode material uses the same raw-material route HEG will follow; R&D is focused separately on silicon-doped and graphene-doped anodes for high-end applications like drones and EVs.
- Utilization ramp conservative: First-year utilization assumed at a humble 35%; once past 50%, management sees a linear path to 90%+ because equipment and capacity are in a very linear way.
- Indian demand tailwind: Even 100 GW of domestic cell manufacturing by 2030 translates to roughly 100,000 tons of anode material needed by Indian players.
Riju Jhunjhunwala: "I think our decision to go up from 20,000 to 44,000 was led more by customer demand and less by intent."
Graphene: From Pilot to Commercial Scale
- Commercial plant at 500 tons: The company raised its target from an earlier 150–200 tons to 500 tons (split 200 + 300 tons), citing customer pull and environmental impact considerations; Phase 1 work has already started.[10–11]
- 90 tons of confirmed demand: Orders and LOIs totaling 90 metric tons are in hand, with execution aligned to the Phase 1 commercial plant coming live in H2 FY28.
- Margins structurally high: Management guided graphene EBITDA margins above 45%, and stated it will not accept less than 40–45% even if competition emerges, because the product is custom-made and the market is large.
- Proprietary process protected: The company has filed and secured a process patent for its manufacturing method, developed over 7+ years; management declined to disclose any process details on the call.
- Current facility already commercial: The 10-ton pilot plant is up and running, already catering to smaller batches commercially.
- Crucible backward integration: The company is building in-house capacity to manufacture graphitized crucibles, the one raw material currently sourced from China; after meeting internal needs, the balance will be sold into a market management describes as being in extreme short supply globally.
Ankur Khaitan: "This is the only raw material which today is coming from China. Rest we have completely non-China -- the completely non-China dependent."
RePlus: Scaling the Energy Solutions Business
- Capacity expanding 6x: The operational 1 GWh footprint is scaling toward 6 GWh total capacity, with an additional 5 GWh under construction at a capex of ₹250 crores and COD in March 2027.
- Business mix pivoting to product: The current ~70–80% EPC mix was a deliberate bridge to build market relationships while products and certifications were developed; management targets a 50:50 EPC-to-manufacturing split next year, falling to 20% EPC within two years.
- Product certifications complete: BESS containers have international standard certifications; data center products are UL certified; telecom products are TSEC approved; residential/UPS products are IEC approved; EV products are ARAI and ICAT approved. [12–13]
- Margin and working-capital tailwind: The shift from EPC to product supply is expected to improve both EBITDA margins and working-capital intensity; management guided to double-digit EBITDA, with data center the best margin segment, followed by EV, then BESS, then UPS/inverters. [12–13]
- Global pipeline building: The company has an office and representatives in Dubai, with solid traction from the EMEA market; the global China-plus-one trend is helping, though significant revenue conversion is still ahead.
- Low-capex, high-turnover model: Management characterized RePlus as delivering good IRRs on a relatively light capital base.
Power: One-Off Boost Masks Seasonal Reality
- EBIT surge is not repeatable: Power segment EBIT rose 64% QoQ to ₹190 crores, but roughly 40% of that came from one-time items: interest received on the transmission line and insurance gain amounts. Management explicitly stated this portion will not recur in Q3 and Q4.
- Transmission line windfall: The company’s 175 km dedicated transmission line, built in 2011, was recently converted to deemed ISTS status with retrospective effect from August 2011, unlocking ~10 years of arrears, some portion of which flowed this quarter.
- Generation is highly seasonal: 75% of annual power generation occurs in H1, 25% in H2, driven by water availability; this makes inter-period comparisons unreliable.
- Pricing tailwind is structural: Spot power prices have firmed up because demand is rising and thermal supply is constrained by coal availability; management expects this trend to persist for the next couple of years.
- Peaking advantage: The hydro reservoir enables ~30% peak power generation, capturing peaking rates currently at ₹9–₹10 per unit.
- Conservative guidance basis: The ~₹350 crores annual power EBITDA guidance assumes ₹5–₹5.5 per unit pricing, well below current spot realizations.
- Cash upstreaming under evaluation: Management is exploring options to consolidate the power business and upstream cash from power subsidiaries to fund other businesses, with an update expected in a few quarters.
Financial Framework & Steady-State Targets
- Group revenue target: Management projects FY29–30 consolidated revenue of ₹7,500–₹8,200 crores, with group annual EBITDA margin of 25–28%.
- Capital allocation discipline: Priority remains balancing growth investments with financial flexibility; the company is net cash positive and funding its capex cycle from internal resources and a prudent mix of debt (as in the Statkraft stake acquisition, funded 50% by banks and 50% by own company and family office).
- Government incentives pending: Management expects to disclose details of government support programs very soon, characterizing them as a very substantial portion that will add to ROCEs.
- Research-to-revenue conversion: R&D spending across anode, graphene and specialized materials is expected to convert to revenue over the next 2–3 years.
Riju Jhunjhunwala: "The theme remains research to revenue, so we are spending a lot of time, money, efforts on research and ultimately, it is all now coming back to us in the form of revenue in the next 2 or 3 years."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Anode Phase 1 commissioning | 20,000 metric ton plant at Dewas | June 2027 |
| Anode Phase 2 completion | Total capacity scaled to 44,000 metric tons | March 2029 |
| Graphene commercial plant | 500 metric tons operational | September 2028 |
| Graphene order execution begins | 90 MT confirmed orders | H2 FY28 |
| RePlus capacity expansion | Additional 5 GWh, total 6 GWh | COD March 2027 |
| RePlus business mix shift | EPC down to ~20% of mix | Within 2 years |
| Solar C&I project online | 300 MW standalone project | ~12 months from now |
| HEG Graphite listing | Pure-play graphite electrode entity listed | Third week of November 2026 |
| Power one-off income | ~40% of Q2 Power EBIT will not recur | Q3 and Q4 FY27 |
| Group steady-state financials | Revenue ₹7,500–₹8,200 cr; EBITDA 25–28% | FY29–30 |
| Anode first-year utilization | Conservative assumption of 35% | First year post-commissioning |
| Anode blended EBITDA margin | North of 35% with crucible backward integration | At steady state |
| Graphene EBITDA margin | Above 45% | At steady state |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Consolidated revenue from continuing operations | ₹430 cr, vs ₹176 cr in Q2 FY26 |
| Total income | ₹547 cr |
| EBITDA from continuing operations | ₹313 cr, vs ₹129 cr in Q2 FY26 |
| EBITDA margin | 57% |
| Profit after tax from continuing operations | ₹209 cr, vs ₹69 cr in Q2 FY26 |
| H1 FY27 consolidated revenue from continuing operations | ₹726 cr, vs ₹329 cr in H1 FY26 |
| H1 FY27 EBITDA from continuing operations | ₹438 cr, vs ₹270 cr in H1 FY26; margin 50% |
| H1 FY27 profit after tax from continuing operations | ₹269 cr, vs ₹168 cr in H1 FY26 |
| Total consolidated equity | ₹2,510 cr as on 30 September 2026 |
| Cash and bank balances | ₹1,300 cr, vs long-term borrowing of ₹1,036 cr; net cash positive |
| Power segment EBIT | ₹190 cr, +64% QoQ; ~40% one-time, 60% regular |
| Phase 1 anode plant completion | 61% complete, commercial commissioning by June 2027 |
| Graphene confirmed orders and LOIs | 90 metric tons in hand |
| RePlus active execution | ~1.5 to 2 GWh of solutions |
| Total capex plan across all expansions | ~₹5,500 cr, with ~₹2,300 cr in FY27, ~₹1,600–1,700 cr in FY28, balance in FY29 |
| Steady-state group revenue guidance (FY29–30) | ₹7,500 cr to ₹8,200 cr |
| Steady-state group annual EBITDA guidance | 25% to 28% |
| Power business normative annual generation | ~100 crore units, 75% in H1, 25% in H2; PLF 43–44% |