- Volume-led revenue drop, margin resilience: Revenue fell 11% QoQ to INR 530 crores on lower electrode sales volumes, but profitability held up reasonably well thanks to rupee depreciation and better hydro power profits.
- Demand deferral, not destruction: Capacity utilization sank to 60% as European customers pushed out orders and Turkey slowed sharply; US demand stayed strong, and utilization has already inched back to ~70% in the current quarter.
- Betting on inventory ahead of a capex cycle: Management deliberately built finished-goods inventory to ~₹400 crores, converting already-purchased needle coke into electrodes on the assumption that new EAF capacity in America will be commissioned between now and end of next year.
- Entering the anode game with a ₹2,000 crore plan: A new wholly owned subsidiary, TACC Limited, will build a graphite anode facility in two phases, with Phase 1 (10,000 tons, ₹1,000 crores) targeted for operation by Q2 CY2025.
- What to watch next quarter: Whether the ~70% utilization holds as guided, the magnitude of Q1 electrode pricing pressure as orders are booked, and any needle coke price softening that could protect spreads.
Volume & Demand: The Slowdown Mechanics
- European pushback: Customers representing ~10% of total sales deferred orders, and some corrected inventory levels on a gloomy outlook; this was the primary driver of the 60% utilization print.
- Turkey collapse: HEG's Turkey tonnage halved from the normal 11–12% of annual supply to 6–7%, because Turkish steel mills voluntarily cut utilization to 50–40% in response to rising steel inventory, not because of plant shutdowns.
- US strength: Demand from American customers remained strong throughout the quarter, providing a floor under volumes.
- Current-quarter recovery: Utilization has already improved to ~70% in Jan–Mar 2023, and management expects this level to persist for at least two more quarters, primarily because of a drop in steel demand and steel consumption.
- The end-of-downturn thesis: Huge steel demand is expected once the Ukraine war ends, to be served by countries like Turkey and India; management is confident about selling whatever HEG produces because of detailed knowledge (names, locations) of all new EAF plants coming up in Europe and America (3–3.5 crore tons), existing customer relationships and qualifications at most new locations.
Manish Gulati: "This 70% capacity utilization, which we are talking about January to March is likely to continue for at least two more quarters. The major reason for this lower capacity utilization is the drop in steel demand, drop in steel consumption."
Inventory Gamble: Converting Coke While Demand Is Soft
- Why build stock: Needle coke was already purchased and stocked (ordered in Oct–Dec before the slowdown's duration was known), and conversion cost is low; management decided to keep converting coke into electrodes on the assumption that new EAF capacity in America (1.5–1.7 crore tons) will be commissioned between now and end of next year.
- Scale of the build: Finished goods inventory rose to ~two months from a normal ~one month, reaching approximately ₹400 crores; management does not see this as a major concern and expects to run it down gradually over the next four quarters.
- Coke purchasing halted: HEG has not bought any needle coke in the last three–four months; the last shipment was more than four months ago, so the inventory build is now capped on the raw-material side.
Pricing & Spreads: A Managed Squeeze
- Electrode pricing stable for now: Product pricing has been maintained largely stable over the past three quarters with very marginal changes QoQ.
- Q1 pressure emerging: As orders are booked for Q1 of next year, some pricing pressure is being faced, though not a major fall; pressure arises from low capacity utilization and efforts to sell extra tons.
- Needle coke offset: Procurement prices were flattish for the past three quarters; management is now seeing some softening due to lower demand from the electrode industry and abundant availability. With industry utilization around 68–70%, there is more than enough needle coke availability, so HEG expects some respite from suppliers adjusting pricing downward; if they lose a few dollars on electrode price, they expect to gain the same on needle coke price.
- Contracting rhythm: Needle coke contracts have been quarterly for the last three–four quarters, giving HEG relatively quick pass-through on the cost side.
Manish Gulati: "In Q1 next year, as we are booking now, we are facing some pressure on that. But that pressure is not like any big fall or any big it is just that everybody is trying to sell that extra ton it makes -- puts pressure on the pricing."
Capacity Expansion: Running Late but Close
- 20,000-ton electrode expansion: Four different processes of the expansion are already commissioned and starting to produce; one shop (the last and most complicated) is running ~three months behind schedule due to delays in arrival of imported parts and equipment from overseas suppliers.
- Revised timeline: Full expansion now expected to be completed by mid-April 2023, followed by a brief period of trials and stabilization; capacity will then be 100,000 tons.
- Competitive window: No competitor (international or domestic) has announced any capex, so HEG expects to capture the market from its expansion once demand comes.
- Margin expectation: HEG expects EBITDA margin from the 20,000-ton expansion to more or less remain the same as current.
Graphite Anode: The Diversification Bet
- Subsidiary and budget: HEG incorporated a wholly owned subsidiary named TACC Limited for the new graphite anode business; the Board approved a budget of INR 1,000 crores for Phase 1, a manufacturing facility of 10,000 tons of anodes per annum.
- Total plan: The full capex plan is ₹2,000 crores in two phases, financed partly by internal funds and partly by bank finance; Phase 1 (₹1,000 crores) will be spent first, with more from HEG in the form of equity and internal accruals.
- Timeline: Phase 1 expected to be in operation by Q2 of calendar year 2025.
- Pilot plant: A pilot plant for graphite anode is already installed in the existing graphite plant.
- Raw material flexibility: Raw material could vary from needle coke to regular Indian coke or imported Chinese coke depending on end-use product requirements; 90% of this material is currently made in China using Chinese coke.
- Demand tailwind: Indian battery demand expected to be ~50 gigawatt hour by 2025, growing exponentially to 260 gigawatt hour by 2030.
Riju Jhunjhunwala: "So the technical expertise largely resides within HEG itself. A lot of the processes that are involved in converting carbon into graphite, which is what our USP is in HEG, how to -- because not too many people can do that. That is the single most challenging factor in this anode thing as well."
EAF Structural Tailwind: The Decade-Long Story
- EAF steel production growth: Management sees electric arc furnace steel production growth at ~4% CAGR in the next decade, leading to ~200,000 tons of additional electrode demand, a number management calls unprecedented in the last 20–30 years.
- Capacity coming online: 1.4–1.5 crore metric tons of EAF capacity to be commissioned in the US between now and mid-2025; 2–2.5 crore metric tons in Europe from 2024–25 to 2028–30.
- Secular shift: The trend of EAF share growth is expected to continue at 3–4% and move further north, driven by carbon emission reduction efforts.
Ravi Jhunjhunwala: "We do have a 4%, 4.5% CAGR on electric arc furnace steel production, which is currently close to 50%, let's say, 49%. So doing that math in the next four, five years, would lead to an additional demand of close to anywhere in the region of 200,000 tons, which is a very, very huge number. I mean we haven't seen this kind of growth in the demand of electrodes in the last 20, 30 years."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Electrode expansion completion | Full 100,000-ton capacity operational after trials and stabilization | Mid-April 2023 |
| Capacity utilization | ~70% utilization sustained | At least two more quarters (from Jan–Mar 2023) |
| Finished-goods inventory rundown | Gradual reduction from ~₹400 crores / two months of stock | Over the next four quarters |
| Graphite anode Phase 1 | 10,000-ton facility operational | Q2 CY2025 |
| Graphite anode Phase 1 capex | ₹1,000 crores deployed | Ahead of Q2 CY2025 |
| Electrode pricing pressure | Some pressure as Q1 orders are booked, but no major fall expected | Q1 FY24 order booking window |
Key Metrics
| Metric | Q3 FY23 |
|---|---|
| Revenue from operations | ₹530 cr, down 11% QoQ and YoY |
| EBITDA including other income | ₹170 cr, vs ₹198 cr QoQ and ₹171 cr YoY |
| Net profit after tax | ₹103 cr, vs ₹130 cr QoQ and ₹109 cr YoY |
| Treasury size | ₹1,015 cr, long-term debt free as on 31 Dec 2022 |
| Capacity utilization | ~60%, vs ~85% in Q3 FY22; Q4 FY23 running at ~70% |
| Exports share of sales | ~65–70% of overall sales |
| Europe plus Turkey share of sales | ~14%, with Europe at ~10% of total sales |
| Finished goods inventory | ~2 months of production, vs normal ~1 month |
| Expansion capex spent | ~₹1,000 cr out of ₹1,200 cr total; ~₹200 cr remaining |
| Expansion capex per ton | ~$8,000 per ton (per management); ~₹6 lakhs per ton (per an analyst's math) |
| Graphite anode Phase 1 capex | ₹1,000 cr approved for 10,000 tons per annum facility |
| Graphite anode Phase 1 capacity | 10,000 tons, catering to 10 GWh of cell manufacturing |
| Expected Indian battery demand by 2025 | ~50 GWh, translating to ~50,000 tons of graphite requirements |
| Expected Indian battery demand by 2030 | 260 GWh |
| Global steel production decline CY22 vs CY21 | 4.4%; excluding China, decline was ~7% |
| EAF steel production share ex-China | 49%, up from 47% in the last 3–4 years |
| EAF capacity commissioned in US, last 12 months | 0.7 crore metric tons |
| EAF capacity to be commissioned in US, now to mid-2025 | 1.4–1.5 crore metric tons |
| EAF capacity to be commissioned in Europe | 2–2.5 crore metric tons, a couple of years behind the US |
| Additional electrode demand from EAF growth, next 4–5 years | ~200,000 tons |
| Graftech Mexican plant closure | ~2–2.5 months; 100% of nipple production was at that plant |
| Graftech sales tonnage vs normal | 40–50% of normal sales |
| Turkey share of HEG tonnage | ~6–7% currently, down from ~11–12% annually |
| Turkey March quarter tonnage vs December | ~half of December quarter tonnage |
| Capacity utilization outlook | ~70% likely to continue for at least two more quarters |
| US steel production via EAF | 70–75%; another 2 crore (2.5 crore) tons of EAF capacity being added |
| Competitor capacity utilization | ~68% for one major competitor |
| Needle coke procurement status | No purchases in last 3–4 months; last shipment more than 4 months ago |
| Total new EAF capacity, Europe and America | 3–3.5 crore tons |