Key Takeaways
- Margin recovery, revenue still soft: EBITDA margin climbed to 27% in Q4 (from 16% in Q1), the best operational quarter of the year, while full-year revenue fell to Rs. 2,153 crores on weak global steel demand.
- Industry supply tightening is the core thesis: 120,000 tons of capacity (16% of global ex-China/Russia) is being removed through Western plant closures, a process management calls "very significant and meaningful" for future pricing.
- HEG is gaining share while peers shrink: The company operated at 80% utilization on its expanded 100,000-ton capacity, the highest in the industry, and is "probably the lowest cost producer in the world."
- Anode diversification is now fully funded: The Rs. 1,850 crore graphite anode plant is on track for April 2027 commissioning, with nearly all CAPEX committed this financial year and a stated ambition to double capacity within 4–5 years.
- What to watch next quarter: Whether announced price increases actually flow into reported realizations once the current 2–3 month order book rolls off, and any concrete timeline on the 100,000–120,000 tons of capacity disappearing.
Margin & Cost Position
- Sequential margin climb: EBITDA margin rose from 16% in Q1 to 21% in Q3 to 27% in Q4, with the full-year average at 21%. Excluding a Rs. 160 crore MTM loss on GrafTech shares in Q4, this was operationally the strongest quarter.
- Cost leadership is structural, not cyclical: HEG's 100,000-ton single-location plant dwarfs the industry average of 40,000 tons, giving it low fixed costs per unit. Management states flatly that HEG is "probably the lowest cost producer in the world."
- Export footprint de-risks any single market: Exports constitute about two-thirds of sales across 25–30 countries, so the recent 10% US import duty, while a headwind if sustained, is expected to have limited overall impact.
- Margin sustainability caveat: Management refused to pin down a target, saying only that it "will all depend on the pricing" and that they "can't pinpoint the number of 20%, 22%."
Jhunjhunwala: "we are probably the lowest cost producer in the world and again to repeat what we've been saying for a very long time, exports constitutes about two thirds of our sales. So we are fairly well-entrenched in the export market and we are exporting to more than 25-30 countries from smallest ones to the biggest ones."
Industry Structure & Pricing
- Capacity exits are real but slow: 120,000 tons of capacity has been announced for closure by Western competitors. Shutting down is a drawn-out process, plants must finish electrodes already in production, so the full removal is "a matter of maybe a quarter or two" from now.
- Pricing is unsustainably low for the industry: Management says "everybody in the peer group is dying to increase prices because only then everyone, the industry can sustain itself." Some price increases are being absorbed in the market, but orders on hand mean the effect takes time.
- The China dynamic is bifurcated: Chinese competition exists only in the lower-grade segment. Most new EAF capacities are in Western economies with large furnaces requiring ultra-high-power electrodes, where HEG competes only with two Japanese firms and GrafTech.
- China Plus One is a tailwind: Almost all customers outside China have started opting for China Plus One sourcing because of US tariff uncertainty, giving a clear advantage to product manufactured in India.
- EAF capacity build-out supports medium-term demand: Another 2.5-3 crore tons of greenfield EAF capacity is expected in the next 18 months, with about 5 crore tons more at various stages of commissioning. Electrode demand follows quickly because EAFs are the first to capitalize when steel demand grows.
Jhunjhunwala: "These are very significant and meaningful reductions in recent years in our business, which points to tightening of supply and possible implications on future pricing dynamics."
Graphite Anode Diversification
- Timeline and budget locked: The 20,000-ton graphite anode plant targets April 2027 commissioning, with total CAPEX of Rs. 1,850 crores. Nearly 100% of this will be committed within the current financial year, funded through a mix of debt and equity.
- Progress to date: Land and permissions are obtained, groundwork and site work have started, machinery is finalized, and orders for main machinery will be placed in the next quarter. A little more than Rs. 100 crores has been spent so far.
- Cost advantage extends to anodes: HEG expects significant fixed-cost advantages in anode manufacturing in India, drawing on 50 years of expertise in graphitization, R&D, and product finalization. Raw materials are similar to needle coke but do not use calcined material; both needle coke and power are major inputs.
- Raw material sourcing is secured: HEG has good tie-ups with Western players including P66 and Japanese suppliers. For its planned capacity, management sees no quantity challenge from these sources.
- Ambition to scale: Management hopes to at least double the 20,000-ton capacity at the same location in the next 4 to 5 years.
Demand & Utilization
- Revenue headwinds from global steel: Full-year revenue fell to Rs. 2,153 crores from Rs. 2,395 crores in FY24, driven by weak demand and pricing challenges across major steel-producing regions, plus surging Chinese steel exports that intensified global competition.
- Utilization held at industry-leading levels: HEG operated at 80% of its expanded 100,000-ton capacity, up from 75–80% on the old 60,000-ton base two years ago, meaning absolute production rose and the company took market share.
- FY26 utilization outlook: Management expects to be around the same 80% level this year, "a little higher."
- Profit hit by non-operational charge: Standalone net profit fell to Rs. 101 crores (from Rs. 232 crores) and consolidated to Rs. 115 crores (from Rs. 312 crores), dragged by the MTM loss on the GrafTech investment. Excluding this, full-year PBT would have been Rs. 228 crores.
Capital Allocation & Corporate Actions
- Demerger filed: The scheme of demerger has been filed with stock exchanges and relevant authorities, after which it proceeds to NCLT. Management expects all required approvals by the end of calendar year 2025.
- GrafTech stake: HEG invested Rs. 282 crores for a 9.98% equity stake in GrafTech International at an average price of $1.32 per share. The MTM loss on this holding was Rs. 160 crores in Q4 and Rs. 80 crores for the full year.
- Shareholder return: The board recommended a 90% final dividend of Rs. 1.80 per equity share for FY2025, subject to shareholder approval.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Anode plant commissioning | 20,000-ton graphite anode plant operational | April 2027 |
| Anode plant CAPEX commitment | Nearly 100% of Rs. 1,850 crores committed | Within FY26 |
| Demerger approvals | All required regulatory and NCLT approvals received | By end of calendar year 2025 |
| Capacity utilization | Maintain close to 80%, "a little higher" | FY26 |
| Industry capacity removal | 100,000–120,000 tons of Western capacity fully shut | Next 1–2 quarters |
| Anode capacity expansion | At least double the initial 20,000-ton capacity at same location | Next 4–5 years |
Key Metrics
| Metric | Q4 FY25 |
|---|---|
| Revenue | ₹537 cr, vs ₹547 cr in Q4 FY24 |
| Full-year revenue | ₹2,153 cr, vs ₹2,395 cr in FY24 |
| EBITDA margin | 27% in Q4, up from 21% in Q3; full-year average 21% |
| Full-year EBITDA | ₹388 cr, vs ₹526 cr in FY24 |
| Standalone net profit (full year) | ₹101 cr, vs ₹232 cr in FY24 |
| Consolidated net profit (full year) | ₹115 cr, vs ₹312 cr in FY24 |
| PBT excluding GrafTech MTM loss | ₹88 cr in Q4, ₹228 cr for full year FY25 |
| GrafTech MTM loss | ₹160 cr in Q4, ₹80 cr for full year FY25 |
| Capacity utilization | ~80% on expanded capacity of 100,000 tons; expected slightly higher in FY26 |
| Treasury size | ₹875 cr as on 31st March 2025 |
| Dividend per share | ₹1.80 per equity share (90% final dividend), face value ₹2 |
| Global electrode capacity reduction | 120,000 tons closed or downsized, 18% reduction to ~633,000 tons |
| New EAF capacity commissioned | ~1.1 cr tons in last 18 months; another 2.5–3 cr tons expected in next 18 months |
| Anode plant CAPEX incurred | >₹100 cr spent; total project CAPEX ~₹1,850 cr |
| Anode plant commissioning timeline | April 2027 |