Key Takeaways
- Sharp sequential recovery, margin rebound: Revenue rose to INR 1,043 Cr from INR 871 Cr in Q1, while EBITDA margin surged to 19.49% from 4.93%, driven by improved OFC realizations and operating leverage.
- Global fibre cycle is the core engine: Hyperscaler and data centre AI demand has filled all OFC plants to full utilisation, with management expecting the trend to sustain for three to five years at least.
- Defence is crossing from promise to production: A ~INR 102 Cr tactical cable contract, a INR 50 Cr thermal sight order, and a 1,000-acre sanctioned defence complex signal the segment is scaling, with revenue expected to exceed INR 500 Cr next year.
- A supply-side bottleneck masked 5G revenue: A chipset shortage from a major vendor suppressed 5G product revenue by an estimated 10–15%; the issue is now resolved and recovery is expected this quarter.
- What to watch next quarter: Whether the electronic fuze trial succeeds in November, the pace of 5G revenue recovery now that chipsets are flowing, and if the INR 650 Cr export order book executes on schedule.
Demand Environment & Fibre Cycle
- AI-driven hyperscale demand: Data centre and AI workload build-outs are driving a surge in next-generation, high-fibre-count cable demand, a trend management believes is structural and will last three to five years.
- Full utilisation achieved: All optical fibre and cable plants are running at full capacity, with management stating it could fill capacity immediately if it chose to, but is holding back to capture better pricing ahead.
- Geopolitical moat in developed markets: Chinese cable is effectively locked out of the US and much of Europe on geopolitical grounds, concentrating demand among non-Chinese suppliers like HFCL.
- BEAD is not yet a factor: BEAD funding has barely started flowing under the current US administration, and HFCL has no plans to set up US facilities to chase it.
- Pricing power emerging: Realisation improved from ~INR 850 to ~INR 950 per fibre km sequentially, and management expects further price increases for specialised high-fibre-count cables where supply is constrained.
Nahata: "We have a situation where buyers are asking us for three years' commitment to supply a particular quantity. And we are not able to give that kind of a commitment. We don't want to give that kind of a commitment because we expect better pricing to come in future."
Defence: Pipeline & Production
- Tactical cable contract live: HTL secured a ~INR 102 Cr order from the Indian Army for battlefield fibre cable, with capacity being expanded from three to five machines and backward integration into steel tube manufacturing planned.
- Thermal weapon sights in execution: A INR 50 Cr order is underway at the Hosur facility, with maximum additional capex for the site pegged at INR 50 Cr.
- Electronic fuzes at the gate: Trials were delayed two months because Munitions India Limited supplied ammunition only in early October; fuzes and ammunition are now at Balasore with DRDO, and testing is expected in November. Management is confident of success and expects quick order booking afterward, with no separate winter or summer trial needed.
- Coastal surveillance radar progressing: The Navy used one unit for six months and has now placed two more in trial under different operating conditions; a successful outcome would lead to procurement.
- Defence complex sanctioned: The Andhra Pradesh government sanctioned a 1,000-acre land parcel for an artillery ammunition shells, multi-mode hand grenades, and other critical defence products manufacturing complex.
- Revenue trajectory: Defence revenue is expected at roughly INR 200-plus Cr this year, exceeding INR 500 Cr next year, and reaching INR 1,000 Cr the year after, though management stopped short of calling the four-figure number formal guidance.
- Defence margins structurally higher: Net margins run 10–20% domestically and can reach 20–25% on exports, better than standard communication products.
Nahata: "When you do for the first time, you put up for trial. It is bound to have some problems. You cannot expect some very next-generation future product design, and first instance, it tells it will work flawlessly. It doesn't happen that way anywhere in the world."
5G & Telecom Products
- Chipset shortage suppressed revenue: 5G product revenue was lower by an estimated 10–15% because of a supply problem with chipsets from one large vendor; the issue is now rectified and chipsets began arriving last week.
- Recovery expected this quarter: With the chipset bottleneck cleared, 5G product revenue is expected to improve in absolute terms in the current quarter.
- FWA demand constrained by price: India has the highest fixed wireless access usage globally, but operator economics are unfavourable at current price points; management believes prices need to fall USD 20–30 for demand to unlock fully.
- 5G expansion has legs: A large part of the country is already covered by operators like Jio, but incremental demand is expected to remain good for the next two to three years.
- UBR in development: The current point-to-multipoint UBR supports only seven subscribers per base station, which is insufficient; a concept to support 20–30 subscribers is at the conceptual stage, with development expected to start in about a month.
Exports & Passive Connectivity
- Exports rose to 28% of revenue, driven primarily by fibre optic cable, with contributions from both data centres and telcos.
- Tier-1 telco entry achieved: HFCL has gained entry into Tier-1 telcos in Europe and America, a milestone that was not possible earlier.
- INR 650 Cr export order book: Export orders secured in H1 FY26 are to be executed by April 2026, with more in the pipeline.
- Passive connectivity solutions: Revenue from passive connectivity (including telecom) is expected at around INR 400 Cr this year and should reach four figures next financial year; data centre solutions development should be completed by January, after which exports will begin.
- High-fibre-count cable leadership: Cables up to 1,700 fibre count are already developed, and the company is on the verge of developing 3,400-count fibre optic cable.
Capacity, Margins & Balance Sheet
- Fibre capacity already at 2.8 Cr fkm per year; cable capacity will soon reach 4.5 Cr fkm equivalent per year.
- High-fibre-count cable expansion commenced: Capacity is being expanded from 0.17 Cr fkm to 1.9 Cr fkm per year, partially operational now and fully operational by June 2026.
- Margin recovery explained: EBITDA margin rebounded to 19.49% from 4.93% in Q1, helped by a INR 100 per km improvement in fibre optic cable realisation and operating leverage; management expects to maintain approximately 19% for the next two quarters.
- Interest cost elevated: Higher interest costs reflect expansion capex and increased working capital; expected to decline as internal revenue generation picks up and NFS receivables reduce.
- NFS receivables: Expected to be fully mitigated by the middle of next financial year.
- UP Jal Nigam EPC drag: Execution has slowed due to non-payment by the state government, though the UP Chief Minister has promised fund release from state resources even without central funds.
Nahata: "I still maintain that revenue growth of about 20%, which we said it could happen. It is definitely going to happen. Profit margins, what you have seen in this current quarter, 19% or so EBITDA, I'm sure we will be able to maintain that in the next 2 quarters of the current year also."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Revenue growth | 20% growth for FY26 | FY26 |
| EBITDA margin | Maintain ~19% | Next 2 quarters of FY26 |
| High-fibre-count cable capacity | Expansion to 1.9 Cr fkm p.a. fully operational | June 2026 |
| Export order execution | INR 650 Cr of secured orders executed | By April 2026 |
| Electronic fuze trials | Complete testing at Balasore | November 2025 |
| Drone detection radar | Enter production | Within FY26 |
| Defence revenue | Exceed INR 500 Cr | FY27 |
| Passive connectivity revenue | Reach 4 figures (INR 1,000 Cr+) | FY27 |
| NFS receivables | Fully mitigated | Mid-FY27 |
| Data centre passive solutions | Development complete, exports begin | Around January 2026 |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue | ₹1,043.34 cr, vs ₹871.02 cr in Q1 FY26 and ₹1,093.61 cr in Q2 FY25 |
| EBITDA | ₹203.37 cr, vs ₹42.93 cr in Q1 FY26 and ₹171.82 cr in Q2 FY25 |
| EBITDA margin | 19.49%, vs 4.93% in Q1 FY26 and 15.71% in Q2 FY25 |
| PAT | ₹71.92 cr, vs -₹29.30 cr in Q1 FY26 and ₹73.33 cr in Q2 FY25 |
| PAT margin | 6.89%, vs -3.36% in Q1 FY26 and 6.71% in Q2 FY25 |
| Revenue growth guidance | ~20% for FY26, maintained |
| Order book | ₹9,981 cr as of Sep 30, 2025, vs ₹10,480 cr in previous quarter |
| Telecom products segment revenue share | 51.43%, vs 66.35% in Q1 FY26 and 46.46% in Q2 FY25 |
| Telecom products EBITDA margin | 23.7% |
| Export share of telecom products | 26% (also stated as 28% in same response) |
| Optical fibre capacity | 2.8 cr fkm per annum achieved |
| OFC capacity utilization | 90% |
| OFC realization per fibre km | ~₹950, up ~₹100 from ~₹850 per km in Q1 FY26 |
| H1 FY26 export orders secured | >₹650 cr for OFC supply, to be executed by April 2026 |
| Defence revenue expectation, FY26 | ₹200-plus cr |
| Defence revenue expectation, FY27 | >₹500 cr |
| Defence net margin | ~15% generally, range 10–20%; exports up to 20–25% |
| Passive connectivity solutions revenue, FY26 | ~₹400 cr (telcos and data centers combined) |
| Passive connectivity solutions revenue, FY27 | ₹900–1,000 cr expected |
| Debt-equity ratio | 0.35 |
| NFS receivables outstanding | ~₹400 cr, expected to be mitigated by mid-FY27 |
| EPC working capital cycle | ~180 days |
| HTL Ltd defence contract (Indian Army) | ~₹101.82 cr for Tactical OFC and accessories |
| Thermal Weapon Sights order | ~₹50 cr, execution underway at Hosur |
| Hosur facility capex done | ₹15–20 cr; additional ₹50 cr max expected |
| Hosur facility peak revenue capability | ₹400–500 cr per year, excluding BMP-2 program |
| Expected annual maintenance contract (Army) | ~₹170 cr per year, accepted by Indian Army |
| High-fibre-count cable capacity expansion | From 0.17 cr fkm p.a. to 1.9 cr fkm p.a.; total OFC capacity to reach 4.24 cr fkm p.a. by June 2026 |
| Fibre count capability | Up to 1,700 fibre count cables developed; 3,400 count under development |
| Divestment of Nivetti Systems stake | 15.19% stake for ₹52.51 cr |
| ESG rating | 65 (Strong) from ERAIL; 73 from CFC Finlease (Oct 2025) |