Novelis: The Quarter's Engine

Ahuja: "We keep looking at it... it's a continuous process of review."

Copper: Record Quarter, Specific Drivers

Pai: "It's certainly not higher TC/RCs because TC/RCs were not that high because we bought concentrate which were more richer in gold."

Alumina: A Strategic Growth Pivot

Pai: "The cost of production of alumina that we can achieve, there is a very healthy return on these investments, so which is why we are doing it."

India Aluminum: Downstream Ramp, Upstream Resilience


Capital Allocation & Balance Sheet

Pai: "We don't believe that this is a time to take a forward position. So what we did for FY '25 is that we actually hedged around 5% taking a zero collar... we hedge for insurance, not to take a forward look."

Guidance & Commitments

CommitmentSpecificsTimeline
Aditya alumina refinery, Phase 1First 1-million-ton capacity onlineWithin 36 months
Third-party alumina sales step-upHigher volumes from brownfield expansionQ3 and Q4 FY24
Bay Minette commissioning600 Kt facility operationalLate calendar year 2025
Silvassa downstream rampFull 30 Kt extrusion capacity contributingNext year (FY25)
Sambalpur FRP plant170 Kt facility startupEnd of next year; volume impact the year after
Novelis full-year capex$1.6 bn to $1.8 bn, likely lower endFY24
India capex₹4,000 crores to ₹4,500 croresFY24
Chakla coal mine box cutMine development milestoneOctober 2024
Renewable power projects50 MW solar/wind commissioned; 100 MW hybrid COD beginsQ1 FY25; December 2024 onwards
ODS phaseoutAll sites ozone-depleting substance freeFY26
Water positivity, all minesAll mine clusters water positive2025
Contractor safety softwareDigital safety system implementedMarch 2024

Key Metrics

MetricQ2 FY24
Consolidated revenue₹54,169 cr, up 2% QoQ
Consolidated business segment EBITDA₹6,896 cr, up 14% QoQ
Consolidated reported EBITDA₹6,096 cr, flat QoQ
Consolidated PAT₹2,196 cr, down 11% QoQ
Consolidated net debt-to-EBITDA1.66x as of September 2023
Consolidated net debt₹37,613 cr; India operations ₹1,174 cr, Novelis ₹36,439 cr
Novelis shipments933 Kt, up 6% QoQ; beverage can shipments up 12% sequentially
Novelis EBITDA$484 million, up 15% YoY
Novelis EBITDA per ton$519 per ton, up 8% sequentially from $479
India upstream aluminum shipments334 Kt, down 2% QoQ
India upstream aluminum EBITDA₹2,074 cr, up 7% sequentially; EBITDA per ton $751, up 9% sequentially
India upstream aluminum EBITDA margin26.3%, higher than last quarter
India downstream aluminum shipments94 Kt, up 15% QoQ
India downstream aluminum EBITDA₹171 cr, up 16% QoQ
Copper metal shipments134 Kt (record high), up 13% QoQ; CCR volumes 100 Kt, up 2% sequentially
Copper EBITDA₹653 cr (all-time high), up 23% QoQ
India aluminum hedging for H2 FY24~11% hedged at $2,755 per ton
India aluminum hedging for FY25~5% hedged via zero collar, bottom at $2,200 and ceiling at $2,517
Coal cost change Q1 to Q2Down 15% sequentially
Cost of production change Q2 vs Q1Down 6% sequentially
Coal sourcing mixLinkage 53%, e-auction 40%, own mines 5%, import and others 2%; linkage materialization nearly 90%
Alumina third-party sales volume138 Kt
Alumina realization (Metal Bulletin price)$337 per ton
Aluminum net realizationINR199 per kg
India capex guidance for FY24₹4,000 cr to ₹4,500 cr
Novelis capex guidance$1.6 bn to $1.8 bn, most likely at the lower end
Aditya alumina refinery capex (first 0.1 crore tons)Slightly below ₹6,000 cr, expected in next 36 months
Long-term debt prepaid in India operations₹2,120 cr during Q2
LTIFR in India (H1 FY24)0.18, improvement over H1 last year
Renewables capacity achieved150 MW, 50% of 300 MW target by 2025
Aluminum-specific GHG emissions (H1 FY24)19.58 tons CO2 per ton of aluminum
Waste recycled and reused (H1 FY24)80% of total waste; bauxite residue 108%, ash 103%
Freshwater consumption (H1 FY24)10.4 cubic meters per ton of metal, down from 18.5 in H1 FY23
Mine clusters with water positivity5 as of September 2023, up 3 in Q2
Clayton plant closure cost$20 mn to $25 mn (per management guidance)
India copper market demand201 Kt, up 7% YoY and 3% QoQ; domestic producer share close to 72%
Global aluminum price average in Q2$2,154 per ton, versus $2,258 in prior quarter; quarter-to-date around $2,200
India domestic aluminum demand Q2 FY240.13 crore tons, growth 10% YoY and 13% sequentially