Key Takeaways
- Production disrupted, revenue surged on inventory sale: EBITDA fell to Rs. 25 crores from Rs. 35 crores QoQ as monsoon shut B-80 for 37-38 days, but standalone revenue jumped to Rs. 321.51 crores on the sale of 417,000 barrels of stored crude to HPCL.
- The Northeast gas grid is the single biggest catalyst: The Duliajan-Numaligarh pipeline connection, expected by end of Q3 FY26, can immediately triple Dirok revenue with no demand constraint, unlocking a field with a cost of production below $0.75 per MMBTU.
- A drilling-heavy strategy is now fully funded: Rs. 250 crores of debt secured, earmarked for offshore, plus an 'IND A' rating reaffirmed; management targets 6,000 BOEPD by FY27 and will not borrow more.
- HPCL receivable is a live friction: Rs. 259 crores booked but unpaid after a contamination claim; management insists the COSA transfers all title and risk at the FSO flange and expects amicable resolution, not arbitration.
- What to watch next quarter: Whether the DNPL line receives its PESO license and PNGRB common carrier declaration, whether HPCL pays, and whether Kharsang's sixth well is brought under control and put onto oil production.
Production & Operational Performance
- B-80 monsoon shutdown: Production was disrupted from mid-June to the first week of August 2025, causing gas revenue to fall to Rs. 22.94 crores from Rs. 38.58 crores QoQ on lower volumes (229 MMSCF vs 370 MMSCF).
- B-80 current decline: Production is now dwindling around 600-700 barrels of oil and about 0.5 crore cubic feet of gas per day, a level that will persist until workover and three development wells are completed after the next monsoon.
- B-80 workover delayed: The D1 well workover has been pushed to Q4 FY26 because tree running tools must be mobilized after supplier mergers disrupted availability.
- Kharsang ramp: Five wells now on production, delivering about 900 barrels per day total (125-150 barrels per well on average), up from an initial 350 barrels per day.
- Sixth well well-control event: While perforating the gas zone, the well encountered a gas flow-out; management calls it a "blessing in disguise" because it proved substantial gas volumes, and the issue is insured with a Rs. 2 crores deductible already accepted.
- Dirok offtake constraint: The field can produce up to 5 crore scfd but remains capped by limited customer demand; the run rate stays flat until the Duliajan-Numaligarh grid connection opens.
- Umatara progress: IOCL has drilled the first development well to 3,900 meters and expects to complete it within a month.
Ramasamy Jeevanandam: "It is a blessing in disguise. Now we proved there is a substantial volume of gas available for monetization."
Northeast Gas Grid & Dirok Catalyst
- The DNPL-IGGL linkage: The IGGL line from Guwahati to Numaligarh is already commissioned. The DNPL line from Duliajan to Numaligarh has mechanical work completed but awaits a PESO license and PNGRB common carrier declaration. Once connected, gas offtake can increase immediately by at least 0.1 crore cubic meters per day, then by another 0.1 crore cubic meters.
- Timeline expectation: Management expects the DNPL connection by end of Q3 FY26, some offtake improvement from Q4 FY26, and full operational flow from Q1 FY2026-27.
- Dirok revenue impact: Once the DNPL line connects, revenue from Dirok can triple immediately using existing wells, with no demand constraint because the country imports more than 1 TCF of gas through LNG.
- Dirok cost advantage: Cost of production is less than $0.75 per MMBTU, giving the field a wide margin even at modest gas prices.
- Dirok resource scale: Management estimates at least 400 BCF of gas in Dirok, to be authenticated by a third party after three additional development wells are drilled.
- Capacity build-out: Three more development wells planned in Dirok, plus further drilling in North Dirok; a 2,000-HP rig is being sourced to drill a well to the Barail formation.
Ramasamy Jeevanandam: "The timeline as we discussed and whatever the knowledge we gathered by talking to the people, it should be end of this quarter. And some offtake improvement will take from the fourth quarter by all probability by considering the delays in the past and other things, it should be fully operational from the first quarter of FY2026-27."
HPCL Crude Sale & Receivable
- The transaction: The entire 417,000 barrels of stored crude from B-80 was sold to HPCL under a Crude Offtake Sales Agreement (COSA) signed on 3rd September 2025; title, risk and insurable interest transferred at the FSO flange on 25th September 2025.
- The contamination claim: HPCL raised a chloride content issue three weeks after appropriation. Management states the COSA provides no warranty on quality or product liability, so there is no basis for a consequential claim. A prior parcel sent to IOCL had no issue.
- The receivable: Rs. 259 crores is booked as revenue and reported in the quarterly results but remains unpaid. Management is in discussion, not arbitration, and expects a mutual resolution, framing the ask as "we are small guys and we will always be requesting them to help us."
- Future offtake risk: Management states the dispute has "absolutely nothing to do with this issue on future offtakes" with HPCL or IOCL.
Ramasamy Jeevanandam: "There is no consequential claim for anything under the COSA and second thing, we have sent another parcel to IOCL in the previous occasion. There is no issue thereon."
Drilling Campaign & Growth Projects
- Overall program: 18 shallow wells and three deep wells in Kharsang, four wells in Dirok, two in Greater Dirok, two each in Asjol and Palej (onshore), plus 10 offshore wells: three in PY-1, three in B-80, four in B-15.
- Kharsang plan: Initial phase of nine development wells (seventh now drilling); next phase of nine additional wells plus one deep well; six more locations already released. One or two rigs will operate continuously at Kharsang for a longer period.
- B-15 development: G&G review and development plan progressing; management confident of bringing the field into production within two years, with a minimum facility platform and drilling to follow.
- PY-1 drilling: Based on a PetroVietnam study, the program proposes two in-fill wells, one appraisal well through the existing platform, and one exploration well outside it; first well targeted for FY2027.
- Greater Dirok exploration: Environmental clearance received for Block 19; will apply for a two-year extension to complete the committed work program of drilling two exploration wells.
- Rig sourcing: Management is short-listing another drilling rig (needs a 2,000-HP and a 1,000-HP rig) and has received good responses; worst case, it can fall back to Oil India for one rig.
- Capital outlay: Rs. 250 crores and more expected for Northeast assets over the next two financial years; the Rs. 250 crores term loan already secured is earmarked exclusively for offshore operations.
Ramasamy Jeevanandam: "And no company can do success on oil and gas unless continued drilling activities. So, as we speak, we are in the drilling mode and we will continue to drill and unlock the value..."
Financial Position & Cost Structure
- Consolidated vs standalone profit gap: Consolidated profit was Rs. 2.8 crores against standalone profit of Rs. 19 crores, a ~Rs. 15 crores difference driven by Hindage and Geopetrol subsidiaries (which own the MOPU and FSO) carrying higher operating costs, depreciation of Rs. 4.31 crores and Rs. 4.8 crores respectively, and financial costs, plus inter-company eliminations.
- B-80 cost structure: $30 per barrel of oil equivalent, including FSO and MOPU charges; only variable costs are taken because volume is too low, and owned facilities provide cost mitigation. Gas is a joint product with oil, so no separate gas cost is calculated.
- MOPU and FSO condition: The MOPU was recently renovated with a life of another 10-12 years; the FSO tanker has 10-15 years of life remaining, so no immediate replacement is required.
- Debt ceiling: Management does not want to borrow more than the Rs. 250 crores already secured.
- Balance sheet trajectory: Management expects a strong balance sheet by FY2026-27 that will support all capital programs, with the company moving into monetization mode two years out.
- Return on capital: Even at current oil prices, management estimates post-tax IRR above 21%, with no substantial downside and no impairment expected.
- Hedging stance: Management firmly rejects hedging, believing in a natural hedge because "predicting the oil price is very difficult and in either way you will be wrong."
- Inventory accounting: All unsold production is carried at mark-to-market value based on the balance sheet date price; adjustments flow through increase/decrease in stock and revenue upon sale.
Ramasamy Jeevanandam: "Even at this price, our return should be more than 21% IRR, post-tax, right? So, we do not find substantial downside in this and nothing will happen to the Company."
PY-3 Dispute & Other Updates
- PY-3 tribunal: HOEC holds a 21% interest in the PY-3 block. The counterparty sought exclusive operation claiming a 9-month redevelopment timeline but completed only a portion. HOEC is challenging the exclusive operation as null and void and seeking to return to the block. The matter has been referred to the International Court of Justice; an arbitrator has been appointed and a schedule framed.
- India Ratings reaffirmation: The 'IND A' rating was reaffirmed for the Rs. 500 crores bank loan facility.
- Kharsang gas monetization: Management will discuss with the government and partners about laying an additional line for gas evacuation and a gas processing facility; no specific timeline was given.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| DNPL pipeline connection | PESO license and PNGRB common carrier declaration; offtake improvement begins | End of Q3 FY26; fully operational Q1 FY27 |
| Dirok revenue | Threefold increase from existing wells once DNPL line connects | Immediately upon connection |
| Production target | At least 6,000 BOEPD own production | FY27 |
| B-80 workover | D1 well workover using tree running tools | Q4 FY26 |
| B-80 development wells | Three development wells drilled from a platform | After next monsoon |
| B-15 development | Field brought into production | Within two years |
| PY-1 first well | Drilling program commenced | FY2027 |
| Northeast drilling | Complete drilling to commercialize discovered resources | Within two years |
| Debt ceiling | Will not borrow more than Rs. 250 crores | Ongoing |
| HPCL receivable | Resolution through discussion, not arbitration | No date; management expects mutual settlement |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Consolidated revenue | ₹325.31 cr, compared to ₹85.5 cr in Q1 FY26 |
| Standalone revenue | ₹321.51 cr, compared to ₹83.48 cr in Q1 FY26 |
| Consolidated EBITDA | ₹25.15 cr, compared to ₹35.02 cr in Q1 FY26 |
| Standalone EBITDA | ₹28.81 cr, compared to ₹27.24 cr in Q1 FY26 |
| Consolidated PAT | ₹2.83 cr, compared to ₹11.35 cr in Q1 FY26 (excluding exceptional item of ₹32.52 cr in Q1) |
| Standalone PAT | ₹19.04 cr, compared to ₹15.69 cr in Q1 FY26 (excluding exceptional item of ₹32.52 cr in Q1) |
| B-80 crude oil sale revenue | ₹258.78 cr, included in B-80 total revenue of ₹281.72 cr |
| B-80 oil production | 31,468 barrels, compared to 48,406 barrels in Q1 FY26 |
| B-80 gas production | 0.23 BCF (229 MMSCF), compared to 0.37 BCF (370 MMSCF) in Q1 FY26 |
| B-80 average gas price realized | $10.62 per MMBTU, compared to $11.41 per MMBTU in Q1 FY26 |
| Dirok gas sales volume | 0.34 BCF (339 MMSCF), compared to 0.49 BCF (490 MMSCF) in Q1 FY26 |
| Dirok condensate production | 5,858 barrels, compared to 8,893 barrels in Q1 FY26 |
| Dirok gas price realized | $7.8 per MMBTU, compared to $7.56 per MMBTU in Q1 FY26 |
| Kharsang production | ~900 barrels per day, up from 350 barrels per day of initial production |
| Cambay gas production | 0.33 MMSCFD, same as previous quarters |
| HPCL crude sale receivable | ₹259 cr, payment yet to be received |
| Secured debt capital | ₹250 cr, term loan for capex; management does not intend to borrow more |
| India Ratings bank loan rating | IND A reaffirmed for ₹500 cr bank loan |
| B-80 cost of production | $30 per barrel of oil equivalent, including FSO and MOPU charges |
| Dirok cost of production | Less than $0.75 per MMBTU |
| Target production level FY27 | At least 6,000 barrels of oil equivalent per day |