Key Takeaways
- Production doubled at key assets, but B-80 and PY-1 remain offline: Kharsang oil and Cambay Palej production both doubled, while Dirok ramped to 2.21 crore SCF/day. However, B-80 crude sales were disrupted by an HPCL quality dispute and PY-1 remains shut in after water ingress, keeping two material assets sidelined.
- Profitability recovery driven by inventory liquidation, not operations: Q2 profitability was boosted by a ₹57.79 crores sale of prior-year HPCL crude stock. Excluding one-time items in both periods, H1 EBITDA was up 20% and profit up 46% YoY, but the underlying operational cash swing of ₹57 crores was largely from that same ₹80 crores HPCL realization.
- A dense catalyst calendar is now funded and contracted: Rig contracts are awarded for B-80 workovers and new wells, a coil tubing contract with SLB is signed for PY-1, and Kharsang has approval to drill 9 more wells. A ₹125 crores credit facility is raised, with management targeting a ₹600–700 crores larger facility to handle offshore eventualities.
- Management targets 11,000 boe/day by mid-2027, scaling to 30,000+ by FY29: The path runs through B-80 workovers (1,000–1,500 bbl/day oil plus gas), PY-1 revival (1.5–2 crore SCF/day), Kharsang drilling, and eventually B-15 and B-174 developments. The B-174 award took 2P reserves past 10.4 crore barrels of oil equivalent.
- What to watch next quarter: Whether B-80 workover rig arrives and delivers the promised 1,000–1,500 bbl/day by early January, whether the DNPL grid connection is completed by December-end unlocking Dirok evacuation, and whether HPCL crude disposal progresses further.
Production & Operational Recovery
- B-80 crude sales stalled on quality dispute: HPCL stopped processing after a few days, citing quality not up to scratch. Arbitration was deferred as the company works toward an amicable settlement; lifting has since started and decent progress made.
- B-80 D2 well watered out: The well reached 93–94% water cut due to water coning, a reservoir management issue management acknowledged. The D1 well continued producing through monsoon, preventing a total shutdown.
- PY-1 shut-in caused permanent damage: The field was producing 5 crore SCF/day but was shut in when buyer GAIL asked to stop production. In a basement granite reservoir, the long shut-in caused water ingress into gas zones, overwhelming them and causing production loss.
- Dirok ramp-up constrained only by evacuation: Production increased from 14–15 to 2.21 crore SCFs/day because Oil India continues to take rich gas. The field can ramp to 0.12 crore standard cubic meters within 1–2 days once the pipeline bottleneck lifts.
- Monsoon reliability improved materially: For the first time, not one day of total production shutdown occurred during monsoon, even with B-80 down. Management plans further subsea infrastructure evaluation, flow line changes, and SPM design improvements for next year.
Baroruchi Mishra: "We requested their core competency to assess our field and they did that, and they have come back with the report that we can still make 1.5 crore to 2 crore SCFs of gas in this field. That is phenomenal..."
B-80: Workover, Drilling & Monetization
- Workover campaign contracted and imminent: Rig LOA given, contract awarded; rig expected on location end of November or early December, a 15-day delay from the original November 15 target. D2 work will shut off the water zone and perforate new plays including a gas cap; D1 gets standard perforation cleanup plus new zones.
- Workover production target: 1,000–1,500 barrels of oil per day and 0.5–0.7 crore SCFs of gas, expected on stream end of December or early January.
- Three new wells to follow workovers: Bathymetric survey done; tubular contracts let out with arrivals mid-December or earlier; integrated service contracts in final negotiations. Wells will be drilled as mud suspension wells through a template without a marshaling platform, allowing testing before committing to superstructure. Drilling finishes by May 15 (rig demobilization deadline for tow insurance).
- Inventory monetization underway: ₹80 crores realized so far from HPCL stock; ~36,103.90 metric tons remain. If both B-80 in-place fresh crude and HPCL crude are liquidated, around ₹250 crores of additional funds could flow in.
- FSO crude disposal: 120,000–130,000 barrels to be disposed of when a replacement tanker is obtained; dry dock expected between January and March next year. Samples given to IOCL with no problems seen, but small barges and vessels remain difficult to secure.
- Reserve risk acknowledged: Management noted that even if B-80 reserves turn out to be half of current estimates, the project still performs well. Regular testing shows zero light content in D1 and D2 wells.
Baroruchi Mishra: "So how wrong can we go? That's the question that we have to answer. Even if I have half that amount, I'm still doing well."
Assam Gas: Dirok, Evacuation & the Grid Connection
- Dirok production rising with offtake: Volumes increased to 2.21 crore SCFs/day because Oil India continues to take rich gas at current prices. Assam Gas Company takes ~20% and has price sensitivity, but the impact is limited to 10–20% of volumes.
- DNPL pipeline bypass is the critical path: NRL is putting a bypass line connecting DNPL to the national gas grid. Spur line material was delivered to NRL premises early last month. NRL will buy gas from the national grid, depressurize DNPL completely, flush with nitrogen, then allow conventional tie-in. The hot tap alternative was abandoned after AGCL bids came in high and T.D. Williamson quoted a 4–5 month schedule.
- Grid connection timeline: December-end still stands; best case mid-December or early December. Spur line completion expected November, then 15–20 days for remaining work.
- Post-grid gas realization: HOEC will be allowed to sell on the national gas grid at prices definitely higher than APM; management hopes for $9–$11 per MMBTU average. NRL will become a reseller or consumer; if NRL cannot take gas due to price, HOEC can sell at the gas exchange.
- Dirok reserves transitioning: 1P condensate reserves already produced; the company is moving into 2P territory which is now becoming 1P.
Baroruchi Mishra: "This has 3,000 psi header pressure. That tells you about the potential of this hydrocarbon system."
PY-1 Revival: Intervention, Compressors & the Take-or-Pay Condition
- Coil tubing intervention contracted: A firm contract with SLB is signed; the work was delayed because coil tubing units could not be mobilized before monsoon. The intervention is expected to increase production from PY-1.
- PetroVietnam assessment validates the resource: The completed report says 1.5–2 crore SCFs of gas is still achievable from the field.
- Rented compressors pursued for offtake: Quotes obtained for rented compressors to boost PY-1 gas pressure from 10 bar to 63 bar for an IOCL connection. Compressors have a 2-year lead time, so the rented option is being pursued.
- Two new wells planned, but only after a firm gas sales contract: Drilling would start middle of next year, but management will not award contracts until there is a clear line of sight or a heads of agreement. The condition precedent is a take-or-pay contract with IOCL or GAIL. Management gives a P50 chance of signing such an agreement next year, citing the cost of rented compressors and the need for Board approval.
- IOCL and GAIL both showing interest: IOCL confirmed they will take all molecules produced; GAIL is also showing interest and new buyers may come in.
Baroruchi Mishra: "If I don't have a firm gas sales contract, take-or-pay contract and I spend USD2 crore-USD2.5 crore drilling these wells, and then I have to shut them down. I'll be back to square one, what happened 20 or 15 years ago when these wells came on stream."
Kharsang, Cambay & Other Assets
- Kharsang oil production doubled from prior levels. Approval received to drill 9 more wells; tubulars ordered, rig awarded, drilling expected January or early February. The target is 1,200–1,400 barrels per day gross after these wells, up from 680–700.
- Kharsang deep potential: Two deep wells with large gas and oil potential are planned for Q3 next year, in discussion with partners. A 24-km gas pipeline survey to the Assam pipeline is about to start, with completion within 18 months; local gas sales to tea gardens also being pursued.
- Cambay Palej production doubled. Cambay North Balol had a belt guide installed, increasing production modestly. Sucker rod pumps are planned for North Balol. The company is teaming up with GSPC and engaging third parties for enhanced oil recovery.
- North Dirok drilling starts January or February next year; management says by many reckonings it is almost as big as the current Dirok field.
- Block B-19: Holds 127–130 Bcf of gas with upsides; mild disputes with government and local villages on compensation being sorted; drilling hoped to start middle of next year.
- Palej R2 PSC extension is imminent with MoPNG; bank guarantee issues being sorted; hope to have extensions in place by January.
Funding, Capital Discipline & the Balance Sheet
- ₹125 crores credit facility raised for B-80 workover capex; total raised ₹179 crores including this facility. Management is looking at a higher facility of ₹600–700 crores, with total potentially reaching ₹1,000 crores including what is already obtained, to handle offshore drilling eventualities.
- Peak expenditure in the next 3–4 months: Management emphasized the importance of having certain cash reserves or access to cash during this period.
- Cash conversion is the top priority: The focus is on stronger cash conversion from existing production assets to fund the development portfolio internally. H1 FY27 operational cash surplus was ₹39 crores vs negative ₹18 crores in H1 FY26, a ₹57 crores swing largely from HPCL stock realization of ₹80 crores.
- Strategic partnerships considered for PY-1: Management is open to a strategic partner at the project level at the right price and percentages, subject to Board approval. Various commercial constructs are being explored to ease capex pressure, but equity dilution at the HOEC level may not be opted for.
- Management declined to give EBITDA/PAT margin guidance by asset, citing multiple variables including profit petroleum tranches and gas/oil prices. An analyst was advised to do first-pass calculations based on volumes and an operating cost range of $20–$30 on a company basis.
Baroruchi Mishra: "That puts a lot of challenge on us and expectations from the shareholder community to fast monetize these reserves because out of the 10.4 crore barrels of oil equivalent, we have not produced more than 5 or 6. So there is an opportunity for us to run as if there is no tomorrow."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| B-80 workover production | 1,000–1,500 bbl/day oil + 0.5–0.7 crore SCF/day gas | End Dec / early Jan |
| B-80 new wells drilling finish | 3 wells drilled; rig demobilized for tow insurance | By 15 May |
| B-80 new wells on stream | Producing from new wells | June 2028 |
| DNPL grid connection | Spur line tie-in to national gas grid | Dec-end; best case mid-Dec |
| Kharsang drilling start | 9 wells | Jan / early Feb |
| Kharsang gas pipeline | 24-km pipeline to Assam pipeline | Within 18 months |
| North Dirok drilling start | Exploration/appraisal well | Jan / Feb next year |
| PY-1 coil tubing intervention | SLB contract signed; increase production | Post-monsoon (underway) |
| PY-1 new wells | 2 wells, contingent on take-or-pay contract | Mid next year (P50 chance of contract) |
| B-15 development on stream | Adding 3,000–3,500 boe/day | June 2028 |
| B-174 drilling start | Development drilling | October 2028 |
| Production target | 11,000 boe/day net HOEC | Mid-2027 |
| Production target | 22,000 boe/day net HOEC | FY28 |
| Production target | 30,000–32,000 boe/day net HOEC | FY29 |
| Palej R2 PSC extension | PSC extensions in place | January |
| B-80 FSO crude disposal | 120,000–130,000 barrels sold | Between Jan and Mar next year |
Key Metrics
| Metric | Q2 FY27 |
|---|---|
| Consolidated revenue | ₹151.78 cr, +25% QoQ from ₹117 cr |
| EBITDA | ₹37.51 cr, more than doubled QoQ from ₹21 cr; margin 24.71% (Note: CFO stated EBITDA more than doubled from ₹21 cr to ₹46 cr on page 9) |
| Profit before tax | ₹38 cr, tripled QoQ from ₹12.5 cr |
| Profit after tax | ₹19.03 cr |
| H1 FY27 revenue | ₹275.78 cr, vs ₹405 cr in H1 FY26 which included a one-time ₹258 cr HPCL sale |
| H1 FY27 EBITDA | ₹63.18 cr, up 20% YoY from ₹56 cr (Note: CFO stated EBITDA up 20% from ₹56 cr to ₹67 cr on page 10) |
| H1 FY27 PAT | ₹25.10 cr, up 46% from adjusted profit of ₹17.18 cr in H1 FY26 |
| H1 operating cash surplus | ₹39 cr, vs negative ₹18 cr in H1 FY26; swing of ₹57 cr (Note: CFO also stated H1 operating cash was ₹18.23 cr on page 10) |
| Net debt | ₹44.90 cr, net debt to EBITDA at 0.71x |
| Gross debt | ₹211.11 cr |
| Cash and cash equivalents | ₹166 cr at September-end consolidated |
| B-80 HPCL inventory monetized in H1 | ₹80 cr realized, with approximately 36,103.90 metric tons remaining |
| B-80 HPCL stock revenue in Q2 | ₹57.79 cr added to revenue |
| Dirok gas realization | $7.8–$8 per MMBTU in Q2; currently $12 per MMBTU, linked to Indian crude basket |
| Dirok production | 2.21 cr SCFs per day, up from 14–15 range in prior quarters |
| Net production target | 11,000 boe/day by mid-2027; 22,000 by FY28; 30,000–32,000 by FY29 |
| 2P reserves | 10.4 cr boe, crossed 10 cr with award of B-174 |
| B-80 workover target | 1,000–1,500 bbl/day oil and 0.5–0.7 cr SCFs/day gas post-workover |
| B-80 capex | $60 mn ($45 mn wells + $15 mn workover), unchanged from last quarter |
| Loan raised for workovers | ₹125 cr, part of ₹179 cr total raised including credit facilities |
| Crude awaiting disposal in FSO | 120,000–130,000 barrels in B-80 field |