Key Takeaways
- B-80 production came online, driving a step-change in revenue: 45 days of continuous production from both wells lifted standalone revenue to ₹106.37 crores from ₹81.69 crores in Q2, though oil sales have not yet begun and gas offtake remains on a best-endeavours basis.
- Operating leverage is visible but still building: Consolidated EBITDA nearly doubled QoQ to ₹81.37 crores, yet fixed operating costs and one-off charges (ForEx loss, Digboi provision) weighed on expenses; management states the cost structure is mostly fixed, so continuous production is the key to better net realizations.
- The B-80 separator bottleneck is the critical unresolved constraint: A single test separator limits oil well output, and management declined to commit to a repair timeline, citing past missed deadlines and safety constraints with 54 personnel onboard.
- The Dirok Phase 2 pipeline is the long-term independence play: Construction has begun on the difficult forest segment of a 35-km independent pipeline to the Duliajan Marketing Hub, aiming to free Dirok gas evacuation from reliance on Oil India’s infrastructure within 12–18 months.
- What to watch next quarter: Whether the HP separator repair is completed before monsoon, the timing and price of the first B-80 oil parcel sale, and any update on the Kharsang drilling campaign now that the PSC extension is progressing.
B-80: The Quarter’s Step-Change and Its Constraints
- Production milestone achieved: Both the D1 oil well and D2 gas well were brought into simultaneous production during the quarter, contributing ~15% production growth at the operated gross level and 30% growth net to HOEC versus Q2. This marks only three months of continuous production from the field so far.
- Separator bottleneck caps oil output: A single test separator prevents the oil well (C1) from producing at optimum capacity; the HP separator is under repair, but the 80-ton unit must be fixed without a crane and with safety constraints from simultaneous production. Management is exploring options to increase production with existing equipment but declined to give any timeline for resolution.
- Oil inventory builds, revenue deferred: No oil was sold in Q3; crude produced is stored in the FSO facility and reflected as a ₹16.59 crores stock adjustment on a mark-to-market basis. First oil revenue is expected once the parcel size reaches ~200,000–250,000 barrels, with ~50,000 barrels kept as permanent stock. Storage capacity is 900,000 barrels.
- Gas offtake on best-endeavours until April ’24: GSPC began offtake only from 16th November after tying up with consumers; 3.78 mmscm of gas remains in the GAIL network, unsold, with a formal purchase offer made to GAIL. Firm commitment at the contract price of 22.2% of Brent begins 1st April 2024.
- Hose replacement ordered, pre-monsoon execution targeted: Orders have been placed for OCIMF-compliant floating and under-buoy hoses after technical assessment; manufacturing is underway outside India. Production stoppage during replacement is expected to last only 1–2 days.
- Cost structure is predominantly fixed: Fixed operating cost runs ~$140,000/day, of which $98,000 returns to HOEC via subsidiaries, making the effective third-party cost ~$40,000/day. An additional ~$40,000/day was incurred for logistics during the repair period.
Elango: “With a single separator, we are not able to pull the full volume from the oil wells. And while that is set right, you'll be able to see higher volumes from both the wells.”
Dirok: Steady Cash Flow with an Independence Catalyst
- Production and offtake stable: Average gas sales were 3.3 crore scf/day in Q3, broadly in line with Q2’s 3.4 and up from Q1’s 2.5, with seasonal variations and major consumer maintenance the main drags. Current Q4 offtake remains in the 30s (mmscfd), and the same trend is expected to continue barring major customer shutdowns.
- Record revenue driven by pricing: Q3 delivered record-level revenues due to a PPAC price revision to $8.57/MMBTU and ~36–40% of sales commanding a premium price of $9.57/MMBTU (PPAC + $1) via a separate e-auction. The premium volume share is expected to increase once the independent pipeline is operational.
- Phase 2 pipeline construction underway: Work on the 18-inch, 35-km pipeline has begun in the most difficult forest segment, which can only be executed in the current season. The pipeline will connect Dirok gas to the Duliajan Marketing Hub independently of Oil India’s infrastructure, targeting the Guwahati market in 12–18 months via a Numaligarh-Guwahati link under construction.
- Existing wells can deliver more: Current wells have capacity to deliver 4.6 crore scf/day; workover operations are budgeted if needed to enhance capacity, but no new drilling is planned unless demand increases substantially. Production is expected to step up as Northeast grid implementation connects new demand centers.
Elango: “Therefore, irrespective of the scenario, even to evacuate the current production, we thought it would be appropriate to have our independent line so that we are able to target the market without any disruption.”
Financial Position: Cash Flow Sufficiency and Debt Reduction
- Revenue and EBITDA jump: Standalone revenue rose to ₹106.37 crores (Q2: ₹81.69 crores), and consolidated EBITDA rose to ₹81.37 crores (Q2: ₹47.7 crores), driven mainly by 45 days of B-80 production.
- Expenses carried one-off and structural items: Total standalone expenses rose to ₹90.48 crores (Q2: ₹75.12 crores) due to the full operating cost of the FSO for B-80 for two months, ForEx loss and MTM on loans (~₹5.68 crores), and a provision towards Digboi fields.
- Management asserts self-sufficiency: Even at current production and prices, the company can meet all its obligations; the ₹100 crores working capital loan raised from a bank has resolved working capital issues, and no additional equity is needed for organic growth or current obligations. The enabling resolution for an equity raise is a formality.
- Short-term debt to be cleared: ₹123 crores in short-term debt is to be cleared by the end of July.
- 9-month revenue mix: Dirok contributed ₹182 crores, B-80 ₹68 crores, PY-1 ₹6.15 crores, and Cambay ₹4.3 crores, underscoring Dirok’s role as the current anchor asset.
Jeevanandam: “Even with the current level of production and the prices, the company can meet all its obligations.”
Portfolio Progress: PY-1, Kharsang, and Cambay
- PY-1 PSC extension secured, drilling plan taking shape: A 10-year PSC extension has been secured after resolving outstanding issues with the government. A geological model is complete, locations are identified, and material sourcing (6–9 months) is underway. The first well of a 3-well, ~$50 million success-based program will be drilled after the East Coast monsoon ends. Gas pricing for any new discoveries will be renegotiated at the best market price.
- Kharsang PSC extension progressing, drilling to follow: The field development plan is approved, and remaining cost-recovery issues have been partly resolved with the balance referred to the Dispute Resolution Committee. The formal PSC amendment for a 10-year extension is under process. Once executed, the operator will propose a drilling campaign; workover jobs will precede drilling to increase production. An update is expected next quarter.
- Cambay assets await government action: Final execution of the ring-fenced PSC for the R2 area is still awaited from the government. Environmental clearance is progressing for a future drilling campaign in three marginal fields; Palej currently produces ~80 bbl/day, while North Balol and Asjol need cluster drilling and are a lower priority than B-80 and PY-1.
- PY-3 participation undecided: HOEC holds a 21% stake and will decide on participation once a development plan is received, based on commercial value.
What Management Would Not Commit To
- B-80 separator repair timeline: Management explicitly declined to give any timeline, citing past missed commitments and safety constraints with 54 people onboard. The contractor’s pace was characterized as a push-pull: “For us, it is always yesterday. But he is saying it is always tomorrow.” Completion is hoped for before monsoon but is not guaranteed.
- Revenue or earnings guidance: Management declined to provide any revenue growth outlook for the next financial year.
- Monthly production reporting: The company will continue reporting production only on a quarterly basis, citing its small scale (~12 wells).
- New separator purchase: An analyst’s suggestion to order a new separator to expedite the fix was dismissed; management believes the existing unit can be repaired.
- Reserves reassessment: A year-end exercise will begin from 31st March, but B-80 has minimal production data so far, offering no supportive data for reanalysis yet.
Elango: “Really, we don't want to give any time line because in the past, whatever timeline we gave, we were not able to meet that. All we can assure you is we are doing everything we are listening at every option to achieve it as soon as possible.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| B-80 gas contract pricing | Firm commitment at 22.2% of Brent begins | 1st April 2024 |
| B-80 first oil sale | First offtake when stock reaches ~200,000–250,000 barrel parcel size | No date; dependent on production rate |
| B-80 hose replacement | Floating and under-buoy hoses replaced; 1–2 day production stoppage | Pre-monsoon |
| Dirok Phase 2 pipeline | 35-km independent pipeline to Duliajan Marketing Hub | 12–18 months |
| PY-1 first well drilling | 3-well program begins after material sourcing (6–9 months) | Post-East Coast monsoon |
| Short-term debt clearance | ₹123 crores repaid | By end of July |
| Kharsang drilling campaign update | Operator to propose plan after PSC extension execution | Next quarter |
Key Metrics
| Metric | Q3 FY23 |
|---|---|
| Consolidated revenue | ₹171.56 cr, vs ₹125.79 cr in Q2 FY23 |
| Standalone revenue | ₹106.37 cr, vs ₹81.69 cr in Q2 FY23 |
| Consolidated EBITDA | ₹81.37 cr, vs ₹47.7 cr in Q2 FY23 |
| Consolidated PAT | ₹37.33 cr, vs ₹17.71 cr in Q2 FY23 |
| Standalone PAT | ₹15.92 cr, vs ₹6.57 cr in Q2 FY23 |
| B-80 field revenue | ₹30.96 cr, vs ₹10.34 cr in Q2 FY23; 45 days of continuous production |
| Dirok revenue | ₹74.25 cr (gas ₹65.62 cr, condensate ₹8.65 cr), up ~₹11.7 cr QoQ |
| B-80 gross production | ~1,700 barrels of oil in Q3 (per analyst's math from slide) |
| B-80 current oil flow | 1,400 barrels per day, gas at 11.5 mmscfd; constrained by single test separator |
| Dirok average gas sales | 3.3 crore standard cubic feet per day, vs 3.4 in Q2 and 2.5 in Q1 |
| Dirok wells demonstrated capacity | 4.6 crore standard cubic feet of gas per day |
| PPAC notified gas price | $8.57 per MMBTU, effective 1st October 2022 |
| Dirok premium gas price | $9.57 per MMBTU, about 36% of Q3 Dirok gas sales sold at this price |
| B-80 gas price realized | $13.55 per MMBTU in November, $14 in December, $18 in January; 22.2% of Brent from 1st April |
| Oil stock | 142,000 barrels held, valued at ₹16.59 cr mark-to-market; first offtake planned at 250,000 barrels |
| B-80 operating cost | $140,000 per day total; $98,000 returns to HOEC via subsidiaries, effective third-party cost $40,000 per day |
| Consolidated expenses (incl. DDA) | ₹124.16 cr, vs ₹105.71 cr in Q2 FY23; includes ForEx loss and MTM of ₹5.68 cr |
| Short-term debt | ₹123 cr, to be cleared by end of July; long-term debt ₹231 cr |