Key Takeaways
- Production constrained, not broken: Dirok gas output is capped by lack of local demand, not reservoir limits; B-80 oil fell on a brief valve shutdown. Both fields can produce materially more once pipeline connectivity and workovers unlock them.
- Inventory overhang masks revenue: Management is sitting on 390,000 barrels of unsold oil, waiting for ~$75/barrel rather than liquidating at ~$65. That deliberate holdback, plus a B-80 contract restructure, explains much of the consolidated revenue decline.
- Drilling campaign is now live: The first Kharsang well is already producing ~200 bopd, a second is complete, and a 30-well onshore program plus 10 offshore wells across three blocks is underway. The pivot from planning to execution has begun.
- Management refuses all guidance: The company explicitly withdrew its earlier FY26 revenue and EBITDA estimates and declined to give production volume guidance, citing oil price uncertainty and the inherent unpredictability of drilling outcomes.
- What to watch next quarter: Whether the DNPL pipeline connection materialises in Q3 as expected, the pace of Kharsang well hook-ups, and any movement on the PY-3 arbitration or Dirok common-carrier access.
Production: What Moved and Why
- Dirok gas: demand, not reservoir, is the bottleneck. Gas sales fell to 1.56 crore scfd from 1.78 crore scfd QoQ because the field can produce over 5 crore cubic feet per day but offtake is restricted by lack of local demand. If pipeline connectivity to the National Grid is established, production could rise to 35-40 mmscfd comfortably.
- B-80 oil: a valve failure, not a structural decline. Oil production dropped to 60,544 barrels from 88,703 barrels QoQ because a malfunctioning valve required a shutdown for a few days, and small issues arose when reopening. Two wells will undergo workover (re-perforation, zone transfer), each taking ~15 days, to restore intended capacity.
- B-80 gas price moved with imported LNG. Average realised gas price rose to USD 12.09/mmbtu from USD 10.78/mmbtu QoQ but fell sharply from USD 15.86/mmbtu YoY; pricing in the Western region now tracks imported LNG.
- Cambay NB-1 revived after 15 years. After securing environmental clearance, a workover operation brought the well back online at ~0.1 mmscfd, a small but symbolically important restart.
Jeevanandam: "See, the issue is actually, which is a burning issue, it has to be sorted out because any pipeline which is existing in the country, which they wanted to use it, they will be using it, right? So, we cannot get a fact actually whether it will not be done or something like it will be done. It is taking time. That's all."
The Inventory and Contract Decisions
- 390,000 barrels of oil held back deliberately. Management is waiting for a better price, targeting ~$70-75/barrel, and states it is not in urgent need to liquidate at current ~$65 levels. If sold, revenue would have moved up; the holdback is a timing choice, not a demand failure.
- B-80 contract restructured for survival. The charge to subsidiaries moved from a day rate (payable irrespective of production) to a rate per barrel of oil equivalent produced. Management framed this as "mutually assured survival": without the MOPU, B-80 cannot survive; without the FSO, the MOPU cannot survive. The change has no impact on consolidated HOEC because one side charges revenue and the other side is cost.
- AEPL dues are accruing interest. AEPL has not paid cash calls; INR 45.90 crores in interest has accrued on outstanding dues, accepted as a liability by AEPL and part of the consideration adjustment for the B-80 stake acquisition.
Jeevanandam: "It is actually a concept of mutually assured survival. We don't want to get into the concept of mutually assured destruction of insisting the same day rate."
Drilling Campaign: Onshore Has Begun, Offshore Awaits Rig
- Kharsang: one well per month, producing within 30 days. The first well was drilled, tested, completed and hooked up by 31 March 2025, producing ~200 bopd. The second well is complete and awaiting testing. Each new well adds ~200 barrels within ~30 days of drilling. Management is exploring adding a second rig within 3-4 months.
- Environmental clearance secured for 43 wells. Approval obtained on 28 February 2025 for 40 development wells and 3 exploration wells in Kharsang, plus one deep well testing Lower Girujan, Tipam and Barail formations.
- North Balol and Cambay next in line. A drilling contract has been awarded for 2 development wells in North Balol; after that, preparation begins for 2 wells in Asjol.
- Offshore timeline hinges on PY-1 first. Management targets receiving the Petro Vietnam report by end-June 2025, then plans to drill 3 wells. If the report confirms drilling from an existing platform (no new tangibles needed), the first well could commence this financial year. B-80 drilling of 3 new wells waits until after the monsoon.
- B-15: a 30-month ambition from a standing start. The block has two ONGC discoveries; HOEC must drill 4 offshore wells, test, determine oil type and facilities, then do economics. Management is targeting production within 30 months, but the 5-6 year norm for discovery-to-development makes this an aggressive goal.
The Dirok and Gas Market Problem
- Gas is stranded without grid access. Dirok has no offtake because local demand is insufficient; connectivity to the National Grid via the Eastern grid is needed to sell gas to the Western region where demand exists. The pipeline exists but using it as a common carrier is unresolved.
- DNPL line: volume uptake expected from Q3. Management expects the DNPL line connection to enable offtake, but hedged the timeline heavily, noting that every prior commitment has proven unreliable.
- North-East Gas Grid operational in FY26. Once operational, it should augment capacity and alleviate the demand constraint, but the timing is outside HOEC's control.
- Dirok drilling waits on grid connectivity. Management will immediately start drilling the North Dirok well and other development wells only when full grid connectivity to the National Grid is established. Existing wells can do 3.5-4 crore cubic feet; reaching 40-70 requires new wells.
Jeevanandam: "We are expecting the DNPL line to be get connected and because you see, every time I commit something, I may be wrong, I will be either way incorrect. So we expect that it should be at least.. the volume uptake should take place from the third quarter."
Legal and Regulatory Overhangs
- PY-3: arbitration underway, 21% interest asserted. HOEC has held a 21% participating interest since 1994 and invested ~INR 385 crores. ONGC is operating the block exclusively; HOEC has issued a legal notice and is pursuing arbitration. Management was firm on not relinquishing the interest but could not confirm or deny whether ONGC has treated the stake as sold.
- Ring-Fenced PSC: paid but not yet signed. HOEC paid INR 9 crores for the Ring-Fenced PSC along with the Palej field; the formal PSC with the Government of India is yet to be signed.
- B-80 remaining 40%: no impairment, fair value upside expected. The remaining 40% of B-80 on the books will not be impaired; management expects a fair value increase once approval comes through.
Jeevanandam: "I don't know about the press releases by ONGC, but the fundamental fact is we are holding 21% of the investment and all the investments below the ground belongs to us forward to the value of up to 21%. If any above the value which comes out of it and they are taking it right now there is a legal notice have been issued, and we will continue to pursue our participating interest in the block. We are not going to let it go just like that."
Financial Position
- Standalone revenue jumped on B-80 consolidation. Revenue rose to INR 142.61 crores from INR 77.64 crores QoQ, mainly due to the 100% participating interest in B-80 and the transfer of 25% participating interest in Kharsang. Standalone EBITDA rose to INR 148.32 crores from INR 16.57 crores, helped by a reduction in operating charges of facilities pertaining to previous quarters.
- Consolidated revenue fell sharply on lower offtake and price. Revenue declined to INR 59.58 crores from INR 156.12 crores QoQ and INR 459.12 crores from INR 830.27 crores YoY; oil was sold during the previous year but not this quarter. Consolidated EBITDA fell 24% mainly due to low Dirok offtake, lower gas prices and lower B-80 production.
- Net debt is zero; drilling funded from internal accruals. Management intends to keep debt at ~INR 200-250 crores, not more than 10% of market cap, and may raise debt for offshore operations at lower interest rates.
- B-80 acquisition cost: ~INR 315-320 crores. Management gave a range rather than a precise figure when asked what was paid for the 40% stake acquired from AEPL.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| DNPL line volume uptake | Gas offtake begins via DNPL pipeline connection | Q3 FY26 |
| Kharsang drilling pace | One well per month; exploring second rig | Ongoing; second rig possible in 3-4 months |
| B-80 workover | Two wells, ~15 days each, ~30 days total stoppage | After monsoon in Western region |
| B-80 new wells | Drill 3 new wells | After monsoon |
| PY-1 drilling decision | Receive Petro Vietnam report, determine platform vs subsea | By end-June 2025 |
| Dirok North well | Drill one well to Barail formation | Q4 FY26, subject to rig availability and grid connectivity |
| B-15 production | Develop two ONGC discoveries, drill 4 wells | Target within 30 months |
| Oil inventory sale | Sell 390,000 barrels held in stock | When price reaches ~$70-75/barrel |
| Debt ceiling | Keep debt at ~INR 200-250 crores | Ongoing |
| PY-3 interest | Pursue arbitration to enforce 21% participating interest | No specified timeline |
Key Metrics
| Metric | Q4 FY25 |
|---|---|
| Standalone revenue | ₹142.61 cr, vs ₹77.64 cr in Q3 FY25 |
| Consolidated revenue | ₹59.58 cr, vs ₹156.12 cr in Q3 FY25 |
| Standalone EBITDA | ₹148.32 cr, vs ₹16.57 cr in Q3 FY25 |
| Consolidated EBITDA | ₹61.86 cr, vs ₹77.69 cr in Q3 FY25 |
| Consolidated PAT | ₹51.16 cr, vs ₹43.32 cr in Q3 FY25 |
| FY25 standalone revenue | ₹343.88 cr, vs ₹569.64 cr in FY24 |
| FY25 consolidated revenue | ₹459.12 cr, vs ₹830.27 cr in FY24 |
| FY25 consolidated EBITDA | ₹249 cr, vs ₹326 cr in FY24 |
| FY25 standalone PAT | ₹147.47 cr, vs ₹85 cr in FY24 |
| Dirok gas sales volume | 1.56 crore scf/day, vs 1.78 crore scf/day in Q3 FY25 |
| Dirok gas price realized | $8.45/mmbtu, vs $8.25/mmbtu in Q3 FY25 |
| B-80 oil production | 60,544 barrels, vs 88,703 barrels in Q3 FY25 |
| B-80 gas production | 0.44 Bcf, vs 0.69 Bcf in Q3 FY25 |
| B-80 gas price realized | $12.09/mmbtu, vs $10.78/mmbtu in Q3 FY25 |
| Oil inventory (B-80) | ~390,000 barrels in stock, awaiting better price |
| Net debt | Zero, company is net debt-free |
| FY26 revenue guidance (per analyst) | ₹1,000 cr with 50% EBITDA margin, stated in prior call (per an analyst's math) |
| B-80 acquisition cost (40% stake) | ₹315–320 cr range, awaiting government approval |
| Kharsang first well production | ~200 barrels of oil/day, commenced 31 March 2025 |
| PY-1 new gas price (GAIL term sheet) | ~$6.75/mmbtu on GCV, vs prior $3.66/mmbtu |
| North-East capex outlay (next 2 years) | ₹250 cr |