Key Takeaways
- Record H1 production, but Q2 sequential dip: Mined metal, refined metal and silver all hit record first-half highs, yet EBITDA fell 17% QoQ as input commodity inflation bit and a fatal acid-tank rupture at Chanderiya disrupted operations.
- Cost guidance revised up on coal pain: Zinc COP guidance lifted to $1,225–$1,275/t for FY2023, driven by input commodity inflation and low domestic linkage coal availability, though management expects some relief from December as imported coal prices ease.
- Strategic hedging delivered a ~₹500 cr gain in Q2, with no significant open position remaining; the gain cushioned the sequential profit decline but is now largely exhausted.
- Government stake sale process accelerating: A banker has been appointed and a roadshow is imminent, with management noting things are moving very fast in the last 15–20 days.
- What to watch next quarter: Whether linkage coal availability improves enough to pull costs down from December, the pace of the fumer commissioning now that Beijing visa clearances have come through, and any concrete newsflow from the government stake sale roadshow.
Production & Operational Performance
- Record H1 across the board: Highest ever mined metal, refined metal and silver production in a first half, driven by consistent MIC flow from mines, better plant availability, better grades, improved recoveries and proactive debottlenecking.
- Sustained 0.1 cr tonne run rate: Over the last 12 months, even after absorbing operational challenges and one-off events, the company is comfortably sustaining over 0.1 crore tonnes on both mined and refined metal.
- Grade improved to 7.4% in Q2 FY2023.
- Chanderiya acid-tank rupture: A sudden rupture of an acid storage tank on August 12, 2022 cost six lives including employees and business partners. The plant is now back in operation after the company preponed planned shutdown work, completed it, and restarted all operations.
- Fumer commissioning held up only by visas: Clearances for visa approval from the Beijing Embassy were granted the day before the call. Everything else is done; only 10–15 days of work remains once experts arrive. If commissioned in Q3, startup is expected in January with ramp-up to capacity by February.
- Volume consistency target: Q3 and Q4 are expected to have almost equal production, summing to ~0.11 crore tonnes, then stepping to 0.12 crore tonnes, removing quarter-wise variation. The 0.12 crore tonne finished goods target for India is expected around end-2024, requiring commissioning of another roaster and possibly a hydro circuit project.
Misra: "No way I can tell you that this is the peak we have achieved, and it will continue like this absolutely no way because then I do not need to be here. If I am here, then we need to have 10% more production every quarter if not every year so we need to go up like that."
Financial Performance
- H1 EBITDA up 40% YoY: Driven by improved metal and silver volume, zinc prices, strategic hedging gains and favorable exchange rates, partially offset by higher costs and lower lead and silver prices.
- Q2 EBITDA down 17% QoQ: Higher revenue was more than offset by increased costs from the prevailing input commodity inflationary environment.
- Q2 net profit up 33% YoY led by higher zinc volume and prices and favorable exchange rates, partially offset by rising input commodity prices and lower lead and silver prices.
- Q2 net profit down 13% QoQ due to lower metal production and lower zinc and silver prices, partially offset by strategic hedging gains and favorable exchange rates.
- Strategic hedging gain of ~₹500 crores booked into revenue from operations in Q2; no significant open position remains. Management did not disclose the price at which hedging was executed.
- Tax rate moving to ~25% from the next financial year as the company shifts to the new regime.
Costs & Margins
- Zinc COP up 12% YoY: Driven by higher input commodity prices, lower domestic coal linkage availability and input commodity inflation, partially offset by higher volume and improved operational efficiencies.
- Linkage coal availability still tight: Improved from 10% in Q1 to around 14% in Q2. Management expects further improvement after monsoon but the quantum is uncertain. Imported coal prices are also declining across Mozambique, South Africa and Indonesia, which should help reduce coal cost from December onwards.
- Cost guidance revised to $1,225–$1,275/t for FY2023, inclusive of higher mine development expenditure to support future volume growth. Management noted the quantum would have been much higher without internal cost reduction measures.
- Shipping costs trending lower across the globe, providing a partial tailwind.
Modi: "As no process improvement can combat such a steep increase in coal cost in the near term. Hence management has taken the considerate call to revise the cost guidance..."
Market Conditions
- Zinc supply-demand largely in balance but macro uncertainty has put LME under pressure. Rising energy prices in Europe have triggered smelter care and maintenance concerns, with 300,000–400,000 tonnes of capacity expected out of circuit. However, Europe also faces demand issues, with auto production under stress due to energy costs.
- Lead prices saw significant volatility in H1, attributed to a strengthening US dollar, higher energy costs, rising global interest rates, the Russia-Ukraine war and resulting pessimism for base metal demand. Lead prices expected to remain subdued for the rest of the year as the global auto sector faces production constraints.
- Indian domestic demand stable: Zinc demand supported by robust growth in infrastructure, pipes and alloy segments. Lead demand strong domestically on the back of excellent automotive demand ahead of the festive season, with the industrial battery segment also robust. The Indian secondary lead market remains tight due to poor availability and limited imports.
- Silver demand uptick seen in light of the upcoming festive season and the lowering of prices.
Strategic Initiatives & Projects
- Group captive renewable power investment: The company has invested 30% of the board-approved ₹350 crores for a 26% equity stake in Serentica, a group company into RE power production. This secures continuity of RE power supply that will replace about 40–45% of the company's power requirements. The entity is expected to commission operations by FY2025 or early Q1 FY2026.
- Pantnagar plant now on 100% green power: Sourcing all its power requirement from renewable hydropower, making it the first Vedanta unit using 100% green power.
- Fertilizer plant progressing: Board approval received, design and pre-feasibility completed by the project team. EPC contractor negotiation underway, with the contractor expected on board by end of the month. Construction to start between the second or third week of November.
- GR to RE transfer: SEBI has approved the transfer from General Reserve to Retained Earnings; NCLT approval is still pending, after which shareholder approval will be required. This is an enabling provision for flexibility in using reserves to reward shareholders.
- Coastal project on hold: The company is not actively working on the coastal project, choosing instead to focus on its own operations: bringing a roaster to increase calcine making capacity and putting up the fertilizer plant.
Capital Allocation & Stake Sale
- Government stake sale accelerating: The government has appointed a banker. The company is in discussion with the government to help in the process. A roadshow with the management team and government is expected very soon; things have been moving very fast in the last 15–20 days.
- Dividend is a board matter: Management noted it is putting up two projects (new roaster and fertilizer plant) and expects to come up with more projects during business planning to make better utilization of cash. When asked about payout ratio, the CEO said his job is to ensure EBITDA and generate cash flows.
- Vedanta's participation in the stake sale: When asked if Vedanta management would be keen to participate, the CEO declined to comment, stating he would not comment on Vedanta's intentions from his Hindustan Zinc seat.
Misra: "The government has appointed the banker and we are in discussion with the government to help them in this process so very soon you would see our team along with government on the road show so things are moving very fast in the last 15 to 20 days time."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume delivery | Confident to deliver project volumes for FY2023 with increasing quarter-wise uniformity | FY2023 |
| Zinc COP | $1,225–$1,275 per ton, inclusive of higher mine development expenditure | FY2023 |
| Project capex | $125–$150 million | FY2023 |
| Tax rate | ~25% under new regime | From next financial year |
| Silver production | Better guidance by a big margin; H2 expected much better than H1 | FY2023 |
| Fumer commissioning | Startup in January, ramp-up to capacity by February, if commissioned in Q3 | Q3/Q4 FY2023 |
| 0.12 cr tonne finished goods target | Requires commissioning another roaster and possibly a hydro circuit project | Around end-2024 |
| Group captive RE commissioning | Serentica entity to begin operations | FY2025 or early Q1 FY2026 |
| Net-zero | In line with commitment | By 2050 |
Key Metrics
| Metric | Q2 FY23 |
|---|---|
| Revenue | Not explicitly stated for Q2; H1 FY23 revenue was a historic high |
| EBITDA | ₹4,387 cr, up 32% YoY, down 17% sequentially |
| Net profit | ₹2,680 cr, up 33% YoY, down 13% sequentially |
| Strategic hedging gain | ₹500 cr in Q2; no significant open position remains |
| Zinc cost of production (before royalty) | $1,259 per metric tonne, up 12% YoY, almost flat sequentially |
| Zinc COP in INR terms | Up 21% YoY and 3% sequentially |
| Effective tax rate | ~32% for Q2; full-year guidance unchanged at 32% |
| Mined metal and refined metal run rate | Sustaining over 0.1 crore tonne over last 12 months |
| Ore grade | 7.4%, improved from prior quarters |
| Capital mine development | ~13 km |
| Revenue mine development | ~13 km |
| Linkage coal availability | ~14%, improved from 10% in Q1 |
| Domestic market share | 79% |
| NCD repayment | ₹700 cr paid in Q2; ₹2,100 cr remaining, due September 2023 |
| Group captive scheme investment in Q2 | ₹105 cr invested; total board-approved equity is ₹350 cr, 30% invested so far |