- Record production, record profit: Refined metal production hit a Q2/H1 record, driving net profit up 35% YoY to INR2,327 crores on 22% revenue growth.
- Costs fell to a 4-year low: Zinc cost of production dropped 6% YoY to $1,071 per ton, the lowest Q2 in four years, powered by better coal, operational efficiencies and renewable energy.
- A fatal safety incident mars the quarter: Two lives were lost in an underground mine in August, a setback management called "depressing" and is answering with new control measures and a review.
- The 0.2 crore ton expansion is now a live project: A consultant confirmed feasibility, and a global mining contractor is expected to be fixed by end-November, turning a long-dated ambition into an execution story.
- What to watch next quarter: Whether the fumer ramp-up stays on track for Q4, the pace of renewable energy share build toward the 23–25% exit target, and any movement on the government discussions around the company's bifurcation.
Safety & Operations
- Fatal incident at Sindesar Khurd: On August 19, 2024, a jumbo machine inadvertently entered an open stope, killing two employees. An in-depth investigation followed, and management committed to implementing robust control measures and reviewing current safety protocols.
- Record production despite the incident: Mined metal production rose 2% YoY and refined metal production rose 8% YoY, both the highest ever for a second quarter and first half.
- Pyro plant ran on lead mode: The plant was switched to lead mode to capture strong silver prices. Returning to zinc-only production would require more distillation columns to maintain SHG-grade premiums, so the plant will stay in a mixed zinc-plus-lead mode toward year-end after recovering silver locked in WIP.
- Fumer ramp-up hit by technical snags: Chinese experts could not get visas, forcing remote troubleshooting. The last 3–4 months of operation gave enough learning to fix design inefficiencies and early equipment failures; full ramp-up to the designed 33 tons of silver is still targeted by Q4 FY25.
Misra: "It is depressing to encounter such incidents in spite of a constant emphasis on inculcating a culture of safety-first across every corner of our business."
Costs & Margins
- Cost of production hit a 4-year low: Q2 zinc COP before royalty fell to $1,071 per ton, down 6% YoY and 3% QoQ. The half-year COP of $1,089 per ton is also the lowest in four years. Drivers were higher volume, better linkage coal availability, softened coal and input commodity prices, operational efficiencies, and better acid price realizations.
- EBITDA margin crossed 50%: At INR4,164 crores, EBITDA rose 33% YoY and 6% QoQ, the highest in six quarters, with a 450 bps YoY margin expansion.
- Renewable energy is structurally lowering power cost: Renewable power share moved from 8% to 14%, reducing cost by $9 per ton YoY. A third 25-year round-the-clock power delivery agreement with Serentica takes total RE capacity to 530 MW, equivalent to 70% of operational power requirement, and locks in a flat rate with no inflation. Management expects to exit Q4 at a 23–25% renewable share.
- Hedging gains added INR60 crores: The strategic hedging program was expanded to silver, with over 83 metric tons sold forward for H2 at an average price of $32.26 per troy ounce.
Modi: "With the increase in share of our renewable energy power as a part of third PDA with Serentica, as a group captive scheme, our major cost bucket of power would be predictable as it is a 25-year flat rate without any inflation."
Growth Projects
- 0.2 crore ton mine expansion is now in motion: A consultant report confirmed the mines can be developed for a 0.2 crore ton run rate and the project is feasible. Management is now inviting discussions with global mining contractors and expects to fix one by end-November for mine development. The exact percentage split across mines was not disclosed.
- Bamnia Kalan progressing: Boundary work is 90% complete and portal construction is starting, with all statutory approvals in place. Reaching the ore body is targeted around Q4 FY26.
- New roaster and fertilizer plant on schedule: The 160,000-ton Debari roaster is targeted for final commissioning by Q4 FY25. The 510,000-ton Hindustan Zinc Fertilizer plant is targeted for Q2 FY26, with start expected around Q3 FY26.
- Next-year capacity floor set: Management committed to at least 0.12 crore tons of capacity next financial year.
Market & Pricing
- Management is bullish on zinc demand: Lower interest rates, improved manufacturing activity, and constricted supply growth underpin the outlook. India is forecast to grow GDP at 7%, with steel production expected to triple to over 30 crore tons per annum by 2030, and domestic zinc demand strong enough to make India the third-largest zinc consumer by 2026.
- Domestic market share jumped: Primary zinc market share in India rose to 78% from 71% a year ago.
- Silver poised for stronger growth: Improving customer sentiment and expected industrial demand support a bullish silver market view. Silver already contributes around 40% of overall segment results.
- Zinc price seen as stable near $3,000: Management does not expect a big change before December, citing the Fed rate cut already done and US election results expected by early January.
Misra: "I have been very consistent in saying zinc balanced stable price is $3,000. So I don't expect a big change anywhere before December."
Capital Allocation & Structure
- Net debt target of INR2,000 crores by March: Management expects to end the fiscal year with net debt around that level. On a steady-state basis, the company will always be net cash, but the 0.2 crore ton expansion may involve some debt depending on project IRRs.
- No dividend action yet: The Board did not discuss dividend in its minutes, and no intimation was given. The usual sequence where Hindustan Zinc declares first, followed by Vedanta, has not started.
- Company bifurcation still under discussion: Talks with the government on separating silver and zinc businesses are ongoing. Management stated nothing is on the back burner and it will happen when both sides agree. The government's disinvestment effort is also continuing.
- Zinc smelter in Gujarat is off the table: Management explicitly ruled it out when asked.
Modi: "On a steady basis, we will always be net cash. But as we go for the 0.2 crore ton of the -- this expansion, we may look for the some debt equity, depending upon our project IRRs being a very, very high basis."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Refined metal production | Guidance unchanged; confident of achieving it, aiming for high end | FY25 |
| Cost of production | Confident of meeting cost guidance alongside metal guidance | FY25 |
| Renewable energy share | Exit at 23–25% of operational power | Q4 FY25 |
| Fumer ramp-up | Full ramp-up to designed 33 tons of silver | Q4 FY25 |
| Debari roaster commissioning | 160,000-ton roaster final commissioning | Q4 FY25 |
| Fertilizer plant start | 510,000-ton DAP/NPK plant to start | Q3 FY26 (around) |
| Bamnia Kalan ore body | Reach ore body | Q4 FY26 (around) |
| Mine expansion contractor | Fix global contractor for 0.2 crore ton development | End-November 2024 |
| Net debt | Around INR2,000 crores | March 2025 |
| Next-year capacity | At least 0.12 crore tons | FY26 |
Key Metrics
| Metric | Q2 FY25 |
|---|---|
| Revenue from operations | ₹8,252 cr, up 22% YoY and 2% QoQ |
| EBITDA | ₹4,164 cr, up 33% YoY and 6% QoQ |
| EBITDA margin | Over 50%, highest in last 8 quarters, up 450 bps YoY |
| Net profit before exceptional items | ₹2,389 cr, up 38% YoY and 2% QoQ |
| Net profit after exceptional items | ₹2,327 cr, up 35% YoY |
| Zinc cost of production before royalty | $1,071 per ton, down 6% YoY and 3% QoQ; lowest Q2 cost in 4 years |
| Mined metal production | 256,000 tons, up 2% YoY |
| Refined metal production | 262,000 tons, up 8% YoY |
| Silver production | 184 tons, up 2% YoY and 10% QoQ |
| Domestic primary zinc market share | 78%, up from 71% in Q2 FY24 |
| Precious metals segment contribution | ~40% of overall segment results |
| Renewable power share | 14%, up from 8% in Q1 FY25; expected to exit Q4 at 23–25% |
| Zinc hedge position (outstanding) | 99 Kt for remaining FY25 at average $3,008 per ton |
| Silver hedge position (H2 FY25) | 83 metric tons at average $32.26 per troy ounce |