Key Takeaways
- Record Q2 on cost and output: Highest-ever Q2 mined metal and EBITDA, with zinc cost of production hitting a 5-year Q2 low of $994/ton, pulling the full-year cost target down to ~$1,000.
- Silver is the active upside lever: Management is diverting mine resources and contractor incentives to attack high-silver stopes in H2, aiming to capture elevated prices; FY27 volume is now guided to a 700–750 ton range.
- Growth capex is locked and loading: INR 16,000 crores of projects are fully contracted, with EPC partners finalized for the 250 Ktpa metal expansion and the 1 crore ton tailings plant; phasing is ~20% this year, ~50% next.
- The demerger is still alive but unscheduled: Management reiterated its belief in the process but offered no timeline, saying only “we will take it up wherever it is required.”
- What to watch next quarter: Whether the Chanderiya debottlenecking completes on time, the pace of the Q4 cost exit toward $950–975, and any concrete silver volume outperformance in H2.
Production & Cost Performance
- Mined metal: Achieved the highest-ever Q2 and H1 mined metal production, with the mining rate at 7.4%, slightly below Q1 but above the internal expectation of 7%.
- Cost breakthrough: Zinc COP of $994/ton was the lowest Q2 and H1 in five years, driven by higher by-product realization, softened input commodity prices, and increased renewable energy consumption. H1 COP was $1,002/ton.
- Renewable energy impact: Renewable power share reached 19%, reducing power costs; every 2% increase in renewable energy lowers total cost by $1.5 per ton. Softening coal costs also helped.
- Depreciation mechanics: Depreciation declined sequentially because mine development per meter was down, reducing amortization; depreciation itself increased as the new roaster and debottlenecking capex were capitalized.
- Volume enablers: The new 160,000-ton Debari roaster creates calcine availability that lets other roasters shut for maintenance; Dariba Cell House was debottlenecked from 200 to 210 kiloamps, with Chanderiya debottlenecking planned this month, together adding 25 KT of annual zinc capacity.
- Roaster 6 delay: Management noted the company could have reached 0.11 crore tons this year if Roaster 6 commissioning had not been delayed.
Misra: “No, no, we are running the plant still on zinc-lead mode because what we are doing is we are slightly tweaking the strategy from the earlier strategy of our silver we run only on lead mode. What we are doing, we are running on zinc plus lead mode, but we are consuming most of the concentrate, which is coming from SK Mine, which is rich in silver.”
Silver: Strategy & Ramp-Up
- H2 resource shift: Management diverted resources from other mines to SK Mine and incentivized contractors and workmen to attack high-silver stopes in H2, aiming to maximize the advantage of elevated silver prices while they last.
- Plant mode choice: The plant runs on zinc-plus-lead mode rather than pure lead mode because silver grade is currently ~90 ppm, so pure lead mode would not yield as much benefit as it did earlier.
- FY27 volume target: Management walked back the earlier 800-ton target, stating “it may not be 800 ton, but surely from 700 ton on an average to 750 ton looks possible.”
- FY26 confidence: Management is confident of reaching the revised silver guidance of 680 tons for the current year.
- Hedging position: Current hedge book stands at 131 tons of silver at $37 per troy ounce, alongside 87 KT of zinc at $2,872 per ton.
Financial Performance
- Earnings: Highest-ever Q2 EBITDA of ₹4,467 crores and PAT of ₹2,649 crores; revenue of ₹8,549 crores rose 10% QoQ, driven by higher commodity prices, a stronger dollar, and higher by-product realization, partly offset by lower production.
- Margin: Sustained an industry-leading EBITDA margin of ~52%.
- Net debt/cash outlook: Management expects net debt or net cash to be flat by the end of FY26; pre-growth capex should be $1.1 billion to $1.2 billion.
- Capex phasing: Of the total INR 16,000 crores capex, ~20% falls this year, ~50% next year, and the remainder in FY28.
Growth Projects & Timeline
- Projects contracted: EPC partners have been finalized for the 250 Ktpa integrated metal capacity expansion and the 1 crore ton per annum zinc tailing reprocessing plant, India's first such facility.
- Debottlenecking: Dariba Cell House debottlenecking is complete; Chanderiya debottlenecking is on schedule for Q3 FY26 completion, together unlocking 25 KT of annual zinc capacity.
- Lead-silver recovery plant: A new plant using hot acid leaching technology is expected by Q4 FY26.
- Major project timelines: The 250 Ktpa integrated metal capacity expansion is expected by Q2 FY29; the 1 crore ton zinc tailing reprocessing plant by Q4 FY28.
- Volume ambition: Next year the company is positioned to achieve more than 0.11 crore tons of metal, a milestone delayed from this year only by the Roaster 6 commissioning slip.
Strategic & Corporate Updates
- ICMM membership: Hindustan Zinc became the first Indian company to join the International Council on Mining and Metals, the first new member since 2021, joining an exclusive global league of 26 companies.
- Nifty inclusion: The stock was included in the Nifty 100 and Nifty Next 50 indices effective September 30, 2025.
- Demerger stance: Management still believes demerger is the right process but offered no timeline, stating only “we will take it up wherever it is required.”
- Zinc International acquisition ruled out: Management explicitly closed the door, noting that Zinc International is expanding to become a 0.1 crore ton player itself while Hindustan Zinc is growing from 0.1 to 0.2 crore tons, leaving “no more capacity to absorb any further zinc capacity from any other part of the world.”
- Sustainability milestones: Released the FY2025 sustainability reporting suite including TNFD and Climate Action Reports; signed an MOU to deploy 100 EV trucks for concentrate movement, India's first commercial-scale initiative of its kind; and committed ₹85 crores over three years to develop the Rajasthan Heritage Corridor.
Misra: “acquisition of Zinc International is really out of the question because that is separately trying to expand and they will become 0.1 crore ton player by themselves. And we are also trying to grow from 0.1 crore ton to 0.2 crore ton. So right now, we have no more capacity to absorb any further zinc capacity from any other part of the world.”
Cost & Margin Outlook
- FY26 cost guidance revised down: Full-year COP guidance lowered to ~$1,000 per ton, well ahead of the earlier FY27 target.
- Q4 exit rate: Management expects COP to exit Q4 around $950 to $975 per ton.
- Renewable energy pathway: Targeting 25% renewable energy share by FY26 exit, with a 70% target by FY28.
- Margin expansion signal: The company stated the cost trajectory could drive incremental margin expansion in coming quarters.
- Commodity outlook: Zinc prices are expected to remain in a resilient trading band; lead is underpinned by battery and industrial demand; silver is seen as potentially sustaining further gains.
Misra: “So what we have done in H2, we have diverted resources from other mines to SK Mine and also we have incentivized the contractors and workmen who are working there, to ensure that we attack those stopes with high silver quantity and produce them in H2 so that we get the maximum advantage of silver till the time the prices are high.”
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Full-year zinc COP | ~$1,000 per ton (revised down) | FY26 |
| Q4 COP exit rate | $950 to $975 per ton | Q4 FY26 |
| Silver production | 680 tons (revised guidance) | FY26 |
| Silver production range | 700 to 750 tons | FY27 |
| Renewable energy share | 25% | FY26 exit |
| Renewable energy share | 70% | FY28 |
| Growth capex | $350 million to $400 million | FY26 |
| Chanderiya debottlenecking | Completion, adding to 25 KT annual zinc capacity | Q3 FY26 |
| Lead-silver recovery plant | Commissioning with hot acid leaching technology | Q4 FY26 |
| 250 Ktpa integrated metal capacity expansion | Completion | Q2 FY29 |
| 1 crore ton zinc tailing reprocessing plant | Completion | Q4 FY28 |
| Net debt / net cash | Flat by year-end | FY26 |
Key Metrics
| Metric | Q2 FY26 |
|---|---|
| Revenue from operations | ₹8,549 cr, highest-ever Q2, up 10% QoQ |
| EBITDA | ₹4,467 cr, highest-ever Q2, up 16% QoQ |
| EBITDA margin | ~52%, industry-leading |
| Profit after tax | ₹2,649 cr, up 19% QoQ |
| Zinc cost of production (excl. royalty) | $994 per ton, 5-year Q2 low, better by 7% YoY |
| H1 EBITDA | ₹8,328 cr, up 3% YoY |
| H1 PAT | ₹4,883 cr, up 5% YoY |
| H1 zinc COP (excl. royalty) | $1,002 per ton, 5-year H1 low, better by 8% YoY |
| Return on capital employed | ~65%, trailing 12 months, record |
| FY26 refined metal guidance | 1,075 ± 10 thousand tons, revised down |
| FY26 silver guidance | 680 ± 10 tons, revised down |
| FY26 zinc COP guidance | ~$1,000 per ton, revised down from earlier, ahead of FY27 target |
| Refined metal production | 246,000 tons |
| Saleable silver production | 144 metric tons |
| Silver grade | ~90 ppm, current |
| Renewable energy proportion | 19%, exit target 25% by FY26 |
| Domestic coal proportion | 58% in Q2, 52% in H1 |
| Growth capex guidance FY26 | $350 mn to $400 mn |
| Maintenance capex FY26 | ~$40 mn |
| Zinc hedged position | 87 KT at avg $2,872 per ton |
| Silver hedged position | 131 tons at avg $37 per troy ounce |
| Mining rate | 7.4%, vs 7.53% in Q1 and 7.3% YoY |
| H1 contribution to National Exchequer | ~₹8,400 cr, of which ₹2,500 cr to Rajasthan |