Key Takeaways
- Record production, cost down, profit up: Mined and refined metal hit 9-month highs, zinc COP fell 5% YoY, and PAT jumped 32% YoY on an 18% revenue gain, all driven by operational efficiencies and better prices.
- Silver guidance cut, Fumer restarting: FY25 silver production guided down to 700–710 tons after a strategic Fumer shutdown and SK Mine sequencing changes; the plant resumed in January and is expected to hit 60–70% of design capacity in Q4.
- Renewable energy is the cost story: Two PPAs signed, a third imminent, targeting 70% renewable power from 15% today, which management says will deliver a ~$30/ton COP reduction over two years.
- Expansion is incremental, not one big bang: Contractors for mine deepening start in April, a new roaster commissions mid-February, and a 250 KTPA smelter order is being finalized, all feeding a phased 1.2→1.45→0.2 crore ton capacity path.
- What to watch next quarter: Whether the Fumer plant actually reaches 60–70% design capacity, the pace of renewable energy ramp-up toward the 18–20% Q4 exit, and any board-approved details on the 1 crore ton tailings recycling plant.
Production & Operational Performance
- Record mined and refined metal: Highest-ever production on a 9-month basis, driven by better plant availability and operational parameters; a maintenance shutdown cost ~5–6 KT of refined metal sequentially.
- Silver production miss: FY25 guidance lowered to 700–710 tons from 750–775 tons due to the Fumer facility shutdown in Q3 and changes in mine sequencing at SK Mine from geotechnical situations.
- Fumer restart underway: Strategic maintenance shutdowns, taken because of visa challenges for Chinese partners since COVID and operational issues, concluded in January; both furnaces running, design inefficiencies in the coal mill addressed with new equipment.
- Fumer Q4 target: Expected to reach 60–70% of design capacity this quarter; produced only 5 tons of silver equivalent over 6–7 months at ~30% design capacity.
- SK Mine geotechnical risk: Management says issues may still arise but a solid mechanism with international experts is in place and no big challenge is seen.
- Market share: Increased to 77% in India.
Arun Misra: "Since COVID, we have been facing challenges in getting visa for our Chinese partners and we were facing some operational challenges as well. Therefore, we took strategic maintenance shutdowns which have been concluded in January and the plant operations have been resumed."
Cost Reduction & Margins
- Zinc COP down 5% YoY: Driven by improved metal grades, better domestic coal availability, increased renewable energy usage, higher acid realization, softened coal and input commodity prices, and operational efficiencies.
- Renewable energy is the main lever: Every 2% increase in renewable energy saves $1/ton; moving from 15% to 70% renewable power is expected to deliver ~$30/ton COP reduction over two years, accounting for roughly 80% of the cost reduction toward the $1,000/ton design target.
- Renewable ramp slower than planned: Q3 renewable component was 15% of total power; Q4 exit now expected at 18–20%, not the 25% previously guided.
- Volume absorption: Higher production volumes also contribute to fixed cost absorption on the path to $1,000/ton.
- Full-year COP guidance maintained: $1,050–$1,100/ton, expected to deliver toward the lower band.
Sandeep Modi: "Every 2% increase in the renewable energy will save one dollar and as we have signed the two power delivery agreement with Serentica and the third power delivery agreement is going to be signed, so we will be almost 70% secured from the renewable power through the renewable energy and from 15% to 70% that is around 55% increase will have a $30 cost reduction in the next two years."
Expansion Projects
- Phased capacity path: From 0.12 crore tons to 0.14 crore tons by FY27 or max FY28, then to 0.2 crore tons; management will announce expansion projects periodically rather than as one large project.
- Mine deepening contractors: Two Australian and one Peruvian contractor almost finalized, expected to start mining in April, adding more volume to next year's ore production.
- New roaster: 160 KTPA roaster commissioning in mid-February, supporting confidence in hitting Q4 production targets of ~316 KT mined metal and ~290 KT refined metal.
- Smelter expansion: Order being finalized for 250 KTPA of metal production capability at the smelter site; planning to start next year.
- Tailings recycling plant: 1 crore ton annual capacity from Rampur Agucha mine tailings at 2–2.5% zinc grade; technology being finalized with samples sent to Australia; expected to be one-of-its-kind globally.
- DAP fertilizer plant: Commissioning in Q4 FY26, no revenue expected in FY26; full-scale EBITDA potential ₹400–₹450 crore, revenue potential ₹2,000–₹2,500 crore.
- HZL Alloy subsidiary: Achieved annualized EBITDA run-rate of ₹150 crores against ~₹200 crores investment, on track for payback of less than two years.
Arun Misra: "You won't hear one project of 0.2 crore tons. You'll hear expansion projects being announced every now and then of some sure first two steps are two mining contractors engaged in mines for deepening the mines and 250 KTPA order placement for expansion of smelters. That will be followed by many such steps."
Market & Demand Outlook
- Global zinc deficit: Refined zinc market forecasted to remain in deficit in 2025 with significant demand increase, partly offset by increased European production.
- Global silver deficit: Deficit expected in refined silver market with growing industrial use from renewable energy and automotive sectors.
- India demand leadership: India expected to lead steel demand growth, underpinned by expanding infrastructure and construction, and to become the third largest zinc consumer globally.
- Clean energy tailwind: Management sees zinc and silver as indispensable in the global shift toward clean energy, with demand for both expected to rise significantly.
Financial & Corporate Updates
- Revenue and profit: Q3 revenue up 18% YoY on better zinc and silver prices and a strong dollar, marginally offset by lower lead and silver volume and lead prices; PAT up 32% YoY.
- EBITDA: Up 28% YoY, in line with strong volume, higher realization, and lower COP.
- Supreme Court mining cess: An ultra-conservative provision of ₹83 crore was made last quarter; no new demands received; management says it may reverse in subsequent quarters.
- Royalty to parent: ~₹650 crores for the full year, paid in advance.
- Government OFS: 1.5% stake sale completed.
- Demerger: Discussions paused while the government was busy with the OFS; management will revisit if nothing else happens.
- Dividend policy: No change; 5% of opening net worth or 30% of profit.
- CAPEX: Current year: $200 million growth CAPEX, $375 million maintenance CAPEX; next year's guidance in process pending board approval, no annual guidance given for the next two years.
Sustainability & Safety
- Global sustainability leader: Recognized as top performer among 248 metals and mining companies in the S&P Global Corporate Sustainability Assessment 2024.
- Climate Action Report: First company in the metals and mining sector to release a 4th edition Climate Action Report; on track to achieve decarbonization target by 2050.
- Safety: Zero fatalities recorded in the quarter.
- Tailings recycling: The 1 crore ton plant is framed as a sustainability initiative, applying reuse-and-recycle principles to produce additional zinc without new mining.
Arun Misra: "This is something will make our process more sustainable. It's a reuse and recycle principle and also produce additional zinc from the tailings that we have. We don't have to mine it."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Mined metal production | ~316 KT needed to achieve full-year guidance | Q4 FY25 |
| Refined zinc production | ~290 KT needed to achieve full-year guidance | Q4 FY25 |
| Cost of production | $1,050–$1,100/ton, toward lower band | FY25 |
| Silver production | 700–710 tons | FY25 |
| Fumer plant performance | 60–70% of design capacity | Q4 FY25 |
| Renewable energy mix | 18–20% of total power | Q4 FY25 exit |
| Renewable energy COP reduction | ~$30/ton reduction from 15%→70% renewable | Over next two years |
| Capacity expansion | 1.2→0.14 crore tons | By FY27 or max FY28 |
| Mine deepening contractors | Start mining | April 2025 |
| New roaster commissioning | 160 KTPA roaster | Mid-February 2025 |
| DAP fertilizer plant commissioning | Plant operational | Q4 FY26 |
| DAP fertilizer plant EBITDA | ₹400–₹450 crore full-scale | Post-commissioning |
| Tailings recycling plant details | Technology freeze, CAPEX, payback disclosed | After next board meeting |
Key Metrics
| Metric | Q3 FY25 |
|---|---|
| Revenue from operations | ₹8,614 cr, highest ever 3rd Quarter, up 18% YoY |
| EBITDA | ₹4,539 cr, highest ever 3rd Quarter, up 28% YoY |
| EBITDA margin | ~53%, 10-quarter best, up 400 bps YoY |
| Profit after tax | ₹2,678 cr, up 32% YoY |
| Effective tax rate | 24% |
| Zinc cost of production (excl. royalty) | US$1,041 per ton, 15-quarter lowest, down 5% YoY |
| Mined metal production | 265,000 tons, up 3% sequentially |
| Refined metal production | 259,000 tons, slightly down sequentially due to maintenance |
| 9-month mined metal production | 784,000 tons, highest ever |
| 9-month refined metal production | 783,000 tons, highest ever |
| Silver production guidance (FY25) | 700–710 tons, revised from 750–775 tons due to Fumer shutdown and mine sequencing |
| Fumer silver production (annual expected) | ~32 tons, post-resumption of operations |
| Market share (India) | 77% |
| Free cash flow pre-CAPEX | ₹2,628 cr in Q3, ₹9,664 cr on 9-month basis |
| CAPEX spent (growth and sustaining) | ₹1,024 cr in Q3 |
| Renewable energy share in power mix | 15% |
| Hedging gain (9 months, locked in P&L) | ₹58 cr, with ~₹64 cr remaining in OCI to flow in Q4 |
| Hindustan Zinc Alloy Pvt Ltd Q3 EBITDA | ₹43 cr, PAT of ₹31 cr |
| Dividend delivered in FY25 | ₹12,000 cr, almost equivalent to full-year PAT |