Key Takeaways
- Record quarter, safety shadow: Revenue, EBITDA and PAT all hit records on strong production and prices, but a fatality at Rajpura Dariba mine overshadows operational achievements.
- Cost leadership reinforced: Zinc COP (ex-royalty) fell to a 5-year low of $940/ton, driven by higher domestic coal use, softer coal prices and record production.
- Silver is the profit engine: Saleable silver production rose 10% QoQ to 158 tons, and the precious metal portfolio now contributes 44% of profits.
- Balance sheet flipped to net cash: Strong cash generation moved the company from net debt of ₹2,547 cr to net cash of ₹329 cr in one quarter.
- What to watch next quarter: Whether the fumer plant delivers its promised Q4 improvement, progress on regulatory clearances for the 2x growth projects, and any FY27 silver volume target.
Safety Incident
- Fatality at Rajpura Dariba: An employee was lost at the Kailash section during the quarter, triggering a detailed investigation and urgent corrective and preventive measures across the organization.
Misra: "Such incidents are truly heartbreaking, particularly as we continue to strengthen our safety-first culture."
Operational Performance
- Record mined and refined metal: Highest-ever Q3 mined metal production since the underground transition at 276,000 tons, and record Q3 refined metal at 270,000 tons, supported by debottlenecking and roaster commissioning.
- Silver production rising: Saleable silver hit 158 tons, up 10% sequentially, helped by operational efficiency and recovery improvements; the graphite pre-float process commissioned at Agucha mill adds further recovery capacity.
- Fumer plant recovering: The fumer ran at 60% capacity utilization after earlier shutdowns, adding about 3 tons of additional silver over nine months; management expects better operation in Q4 now that shutdowns are cleared.
- Debottlenecking complete: Higher current in electrowinning at Dariba and Chanderiya is now stabilized, adding 25,000 tons per annum of refined metal capacity.
- Q4 production outlook: Management expects Q4 production to exceed Q3, citing cleared shutdowns, more equipment availability and favorable ambient conditions.
Cost Structure
- 5-year low COP: Zinc COP (ex-royalty) reached $940/ton, the lowest quarterly figure since the underground transition, and the lowest Q3 COP ever achieved.
- Power cost the big lever: 58% domestic coal utilization, lower imported coal prices and growing renewable energy share drove the cost reduction, more than offsetting higher mine development costs and inflation.
- RE power trajectory: Renewable energy share exiting at 25% as wind capacity comes online, targeting 35-40% next year and 70% the year after, delivering an estimated $20-25/ton saving or ₹250-300 cr annually.
- Other expenses rose on brand fees: Other expenses increased ~$150/ton YoY, primarily because brand fees are linked to turnover at 3% and rise with higher revenue.
- Sustained COP range: Management expects zinc COP (ex-royalty) to settle between $950 and $1,000/ton on a sustained basis.
Silver Strategy & Pyro Mode
- Zinc-lead mode stays for now: The company is running pyro in lead-plus-zinc mode because zinc prices at $3,200-3,300/ton make zinc production highly profitable; switching fully to lead mode only makes sense when zinc falls to $2,000-2,200/ton and silver is around $30/oz.
- Joint product constraint: Zinc and lead are joint products from mining; running zinc-lead mode piles up lead concentrate, while lead mode piles up zinc concentrate. The company does not intend to become a concentrate seller as a business model.
- Lead concentrate sale was opportunistic: Lead concentrate from the RD mill had poor grade, so selling it rather than overburdening the smelter was a tactical decision when lead-silver prices were attractive.
- Silver capacity expansion ahead: The Pantnagar refinery can handle 800 tons; management sees need for another 600-700 tons of capacity, either by expansion there or a new 600-ton facility at an existing location. Lead smelting capacity will double from 200 kt to 400 kt, automatically lifting silver output.
- FY27 silver guidance withheld: Management declined to provide a targeted silver volume for FY27, saying only that Q4 will bring more silver and the company should be closer to the revised FY26 guidance of 680 ±10 tons.
Misra: "If I just go into lead mode, we do that when the zinc prices are, say, $2,000 or $2,200 a ton and the silver prices are around $30 a troy ounce, then it makes a heavy sense not to produce so much of zinc, but produce more of silver... So right now, with the zinc prices, there is no reason that why we should convert everything to lead mode only."
Hedging & Price Outlook
- Hedging is margin-locking, not price-playing: The company hedges 10-20% of volume consistently, a practice followed for the last three years, to lock in margins when prices exceed business plan or consensus levels.
- Current hedge position: Hedging covers mostly April to October; decisions on the remaining five months will be taken near February-March, with no commitment to increase the 8% currently hedged despite silver at $93/oz.
- Silver price view withheld: Management declined to give price cues on silver, citing extreme volatility and geopolitical tensions that make any comment unreliable.
- Zinc price range: Management sees zinc in a $3,000-3,200/ton range, with a possible small surplus in calendar year 2026.
Modi: "Hedging is not for the purpose of this playing with the prices, it is more about having the locking-in margin when it is more than business plan or consensus prices... I just want to make it clear, because it's being heard that hedging is being done at the right price. No, there is no right price."
Growth Projects
- 2x projects underway: EPC partners locked in for the 250,000 tpa integrated zinc smelter at Debari and the tailings reprocessing plant at Rampura Agucha; groundwork including ground clearing and construction setup has started.
- Regulatory clearances pending: The tailings project still requires regulatory approvals before full construction can proceed.
- Timeline: Both projects targeted for completion by the second half of FY27.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Refined metal production | Deliver as committed, supported by debottlenecking and roaster commissioning | FY26 |
| 2x growth projects completion | 250,000 tpa zinc smelter at Debari and tailings reprocessing plant at Rampura Agucha | H2 FY27 |
| Sustained zinc COP (ex-royalty) | $950 to $1,000 per ton | Sustained |
| Strategic hedging | 10-20% of volume hedged consistently | Ongoing |
| Q4 production | Better than Q3, driven by cleared shutdowns and favorable conditions | Q4 FY26 |
| Silver guidance | Closer to 680 ±10 tons | FY26 |
| Renewable energy share | Exit FY26 at 25%, then 35-40% next year, 70% the year after | FY26 / FY27 / FY28 |
| Lead smelting capacity | Expand from 200 kt to 400 kt, automatically increasing silver output | No date (growth project linked) |
Key Metrics
| Metric | Q3 FY26 |
|---|---|
| Revenue | ₹10,980 cr, up 28% QoQ and 27% YoY |
| EBITDA | ₹6,087 cr, up 36% QoQ and 34% YoY |
| EBITDA margin | 55% |
| Profit after tax | ₹3,916 cr, up 48% QoQ and 46% YoY |
| 9-month revenue | ₹27,300 cr, record |
| 9-month EBITDA | ₹14,415 cr, record |
| 9-month PAT | ₹8,799 cr, record |
| Zinc cost of production, excluding royalty | $940 per ton, 5-year lowest, down 10% YoY and 5% QoQ |
| Sustained zinc COP guidance | $950 to $1,000 per ton |
| Mined metal production | 276,000 tons, best ever Q3 since underground transition |
| Refined metal production | 270,000 tons, highest ever Q3 |
| Saleable silver production | 158 tons, up 10% QoQ |
| Silver sold through concentrate | 21 tons |
| Total silver production plus concentrate sold | 472 tons |
| Free cash flow before growth capex and RE investment | ₹3,413 cr |
| Net cash position at end-December 2025 | ₹329 cr, versus net debt of ₹2,547 cr at end-September 2025 |
| Zinc hedge quantity squared off in Q3 | 47 kt |
| Silver hedge quantity squared off in Q3 | 55 tons, at $37 per troy ounce |
| FY27 zinc hedged | 66 kt at $3,170 per ton |
| FY27 silver hedged | 56 tons at $58 per troy ounce |
| RE power share | 20% in Q3, targeting 25% exit rate |
| Domestic coal utilization | 58% in Q3 |
| Ore grade | 7.3% in Q3, versus 7.4% in same quarter last year |
| Maintenance capex | $90–100 million for Q4, ~$400 million full year |
| Growth capex invested in Q3 | ₹500 cr |
| Sustaining capex invested in Q3 | ₹800 cr |
| Debt maturity in Q4 | ₹1,300 cr |
| Precious metal portfolio profit contribution | 44% |
| Fumer capacity utilization | 60% |
| Silver added through fumer in 9 months | 8 tons |
| Debottlenecking capacity addition at Dariba and Chanderiya | 25,000 tons per annum |
| Mine development | 15 km in 9 months, versus 14 km last year |
| Market cap at December 2025 end | ~₹260,000 cr, versus ₹195,000 cr at March 2025 end |
| 9-month shareholder returns | 35%, outperforming Nifty 100 and Nifty Metal indices |
| Contribution to national exchequer in 9 months | over ₹13,000 cr, of which ₹4,000 cr to Rajasthan |