Key Takeaways
- Volume-led quarter, price tailwind: Electricity volumes rose 19% in the first nine months, well ahead of the country’s 4.8% demand growth, as low coal and imported coal prices pushed clearing prices down 26% YoY and pulled discretionary demand onto the exchange.
- Green and real-time markets are the growth engine: Green Market volumes surged over 300% YoY and RTM grew 30% YoY, both benefiting from rising renewable capacity and the need to manage intermittency.
- Regulatory pipeline is rich but timing is uncertain: Key products (11-month contracts, Green RTM, carbon credits, coal exchange) are all in various stages of approval or consultation; none carry a firm launch date.
- Market coupling is now a live debate, not a distant risk: CERC’s February order noted coupling 99% with 1% yields no benefit, but shadow pilots are underway and management now frames its defense around customer loyalty, not guaranteed share retention.
- What to watch next quarter: Whether CERC delivers orders on 11-month contracts and Green RTM, any update on the shadow coupling pilot, and whether gas prices ease enough to revive IGX volumes.
Volume Growth: The Price-Led Pull
- Supply-side abundance flipped the market: Ample domestic coal (production up 6.1%, inventory at 19 days) and competitive imported coal at $50/ton drove sell quantum up 62% YoY, which in turn pulled DAM clearing prices down 26% YoY to ₹3.71/unit.
- Low prices pulled replacement demand onto the exchange: When clearing prices fall, distribution companies skip bilateral contracts and buy on the exchange instead. Management calls this effect real but declined to quantify it, saying it is difficult to isolate.
- The 2.5–3x correlation held, then accelerated: Over ten years, exchange volume growth has run at roughly 2.5–3x country demand growth. This year the multiple was higher because the supply-side improvement and government push for power availability amplified the effect.
- Revenue grew slower than volume by ~2.5%: The gap comes from incentives IEX offers to partners in the Term-Ahead Market and REC segments to match competition.
SN Goel: "From 2008 to 2021, there was no regulation for regulation of transaction fees. Exchanges were free to charge a transaction fees which they feel right. And we have been charging this INR0.02 on either sides from 2011 onwards, and we have kept it constant thereafter."
Segment Dynamics: RTM, Green, and the Intermittency Trade
- RTM grew 30% YoY but fell sequentially, and that is seasonal, not structural: Q2 carries more wind and hydro generation, so higher renewable intermittency drives RTM volumes. In Q3 the renewable proportion drops, so RTM declines; collectively, RTM and DAM still grew.
- Green Market volumes rose over 300% YoY to ~250 crore units, driven by regulatory push and compliance demand. A petition for a Green RTM product has been admitted by CERC, with a consultation process now underway.
- Battery storage arbitrage is emerging as a new liquidity source: Storage prices are competitive, and management expects battery storage to improve liquidity during non-solar hours, alongside FDRE and virtual PPA models.
- Virtual PPAs are small but live: Two MNCs have virtual PPAs on the platform, with 300–400 MW already flowing through that structure.
Regulatory Pipeline: Products Waiting on Orders
- 11-month contracts (TAM): Hearings are complete and the order is reserved with CERC. Management’s guess is a 3–4 month wait for launch, with total market potential around 4,000 crore units to be captured in phases.
- Green RTM: The first hearing has happened, the petition is admitted, and the consultation process has started. Management expects a positive signal from CERC in the next 2–3 months, followed by a launch.
- Carbon Credit Certificates: CERC has issued a draft procedure for trading through power exchanges for both obligated and non-obligated entities; trading is expected to start on IEX in the near future.
- Coal exchange: The government reiterated a plan for India’s first coal exchange in CY2025, with a draft cabinet note circulated for interministerial consultations. Details are still being worked out.
- LPSC and DSM rule amendments: Generating stations with long-term PPAs can now offer un-requisitioned power in DAM and RTM, and state government-owned stations are mandated to do so. Proposed DSM amendments linking deviation charges to grid frequency and narrowing solar/wind deviation bands to 10% are expected to increase RTM volumes.
Market Coupling: The Risk Moves from Theory to Simulation
- Shadow pilots are running, but the timeline has slipped: Grid India has been receiving data from IEX for a year and is running simulations. The shadow pilot report was due in July, then January; it is still awaited. CERC will take a view after submission.
- CERC’s February order contained a notable observation: The regulator stated that if one exchange has 99% market share, coupling 99% with 1% will not lead to any benefit. It ordered simulations across different market segments (DAM-DAM, RTM-RTM, RTM with SCED).
- The timeline varies sharply by segment: DAM-DAM and RTM-RTM coupling require software development and testing. RTM coupled with SCED needs an entirely different algorithm, logic definition, and complex physical and financial settlement; management estimates this could take 2+ years.
- Management has shifted its defense framing: It no longer claims it will maintain market share under coupling. Instead, it points to customer-centric activities to ensure loyalty and says it should be able to retain a significant market share.
SN Goel: "If you look at the order of CERC dated sixth of February in that order itself, CERC has mentioned that if one of the exchange has a 99% market share. And as common sense, will say, coupling 99% with 1% will not lead to any benefit."
IGX and Adjacent Businesses: Waiting on Gas Prices
- IGX volumes rose sharply to 1.62 crore MMBtu from 84 lakh MMBtu a year ago, but the business remains challenged by high gas prices at $14–$15/MMBtu, up from $12 in Q2 due to winter and geopolitical issues.
- The bull case rests on a 2026–27 price break: Management expects gas prices to fall to $8–$9 when new liquefaction terminals under construction come online, which would boost gas consumption and IGX volumes. Until then, the outlook is difficult.
- Coal exchange and ICX are early-stage: ICX made a profit but management did not disclose the figure. For coal trading, management said nothing has started and there is no clarity.
- Management declined to project revenues for IEX or its subsidiaries for FY26/FY27, calling it difficult at this stage.
SN Goel: "It is expected that in 2026-27, there are many liquefaction terminals which are under construction in the countries where gas is available, and that will increase the gas supply in the world. And gas prices are expected then to come down to almost about $8, $9."
Market Structure and Competitive Position
- Electricity market share held at ~84%; REC share at ~60%. Management attributes stability to customer-centric activities and the fact that all major participants are already registered and trading on the platform.
- Transaction fee visibility improved: CERC has approved the fee structure, and management believes the approval should hold good for at least five years, noting that such approvals do not happen every day.
- Contract for Differences remains stuck on bankability: Generators are unwilling to set up capacity without a PPA because banks will not lend without one. Alternate models like virtual PPAs are being worked out with the government and renewable generators.
SN Goel: "I don't think we have ever said that in case of coupling we will be able to maintain the market share. What we always say is that even in case of coupling, we are doing a lot of customer-centric activities to ensure customer loyalty, and we should be able to retain a significant market share."
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Volume growth target | 15–20% growth, contingent on Indian economy growing at 7–8% and power demand at 6–7% | Ongoing, based on annual performance |
| Green RTM launch | Positive signal from CERC expected, then product launch | Next 2–3 months for signal, then launch |
| 11-month contracts launch | Order reserved with CERC; launch to follow | 3–4 months (management estimate) |
| Gas price relief for IGX | Prices expected to fall to $8–$9/MMBtu as new liquefaction terminals come online | 2026–27 |
| Transaction fee durability | CERC-approved fee structure expected to hold | At least 5 years |
| Market coupling (RTM-SCED) | Algorithm definition, software development, settlement design required | Could be 2+ years |
Key Metrics
| Metric | Q3 FY25 |
|---|---|
| Consolidated revenue | ₹160.5 cr, up 13.7% YoY from ₹141.2 cr |
| Consolidated PAT | ₹107.3 cr, up 16.9% YoY from ₹91.8 cr |
| IEX standalone PAT | ₹103 cr, up 15.5% YoY |
| IGX standalone PAT | ₹8.3 cr, up 13% YoY from ₹7.4 cr |
| Interim dividend | ₹1.50 per share, 150% of face value |
| Electricity volumes | 3,050 crore units, up 16% YoY |
| Electricity volumes, 9M FY25 | 8,900 crore units, up 19% YoY |
| RTM volumes | ~930 crore units, up 30% YoY |
| Green Market volumes | ~250 crore units, up over 300% YoY |
| RECs traded | 26.5 lakh certificates, up 31% YoY |
| IGX traded volume | 1.62 crore MMBtu, vs 84 lakh MMBtu in Q3 FY24 |
| Day Ahead Market average price | ₹3.71 per unit, down ~26% YoY |
| IEX electricity market share | ~84% |
| IEX REC market share | ~60% |
| Open access customer proportion, 9M FY25 | ~13% of volumes, vs lower last year when prices were higher |