Key Takeaways
- Volume growth strong, but price cap disrupts: FY22 electricity volume grew 24% YoY, yet a regulator-imposed price cap in April 2022 halted price discovery and pushed buyers to alternate platforms, creating near-term uncertainty.
- Green Market surges 5x: Green Market volume grew 530% YoY to 4.945 BU, establishing a material new growth vertical alongside the conventional power market.
- IGX deconsolidation masks gas potential: IGX ceased to be a subsidiary in January 2022, so consolidated revenue captured only ₹28 lakh, while the majority of IGX volume picked up after that date and the business faces high gas price headwinds.
- Regulatory pipeline is full, execution is the unlock: Long-duration contracts, ancillary markets, gross bidding, and the National Open Access Registry all sit with CERC; management expects several to commence in FY23, but timing is not in IEX's control.
- What to watch next quarter: Whether the April price cap is lifted as summer supply improves, whether CERC delivers the long-duration contracts order, and whether gas prices moderate enough for IGX volumes to materialize.
April 2022 Price Cap & Market Disruption
- The trigger: Demand rose 11–12% in April on economic activity and an early severe summer, while 9,000–10,000 MW of generation went offline because imported coal cost ₹9–10/unit and gas/LNG cost ₹25+/unit, pushing exchange prices to ₹18–20.
- The intervention: CERC capped exchange prices at ₹12/unit under a Government of India direction under Section 107; IEX was not consulted before the order.
- The consequence: Price discovery stopped on the exchange, and buyers shifted to alternate platforms; management describes this as a short-term phenomenon and expects improvement after 10 May as wind generation adds 150–200 MU and hydro generation picks up.
- Duration unknown: Management understands the cap is interim, only for the deficit period, and will be removed when the situation improves, but received no specific communication from CERC on timing.
SN Goel: "The capping of the price in the efficient market led to no price discovery on the exchange platform. And this has led to buyers shifting on the alternate platforms. This is something which has happened now, but I believe this is a phenomenon, for a short period."
Volume Growth & Market Share Ambition
- FY22 conventional power volume grew 24% YoY to 90.618 BU, with new segments RTM, GDAM, and GTAM contributing 24% of total volume.
- Green Market volume grew 530% YoY to 4.945 BU, a 5x increase; management is interacting with IPPs and public sector green generators and sees policymakers and regulators as open to market-based renewable instruments.
- Open Access volumes fell to ~8% of total volume in FY22 because the clearing price was very high at ₹4.40/unit, making Open Access unviable in most states; volume would increase if the clearing price falls to ₹3.2–3.5/unit, but that depends on supply improvement.
- FY23 growth outlook: Management sees 35–40% growth as difficult given the high base, but believes "reasonable growth of 20–25% should be possible," dependent on market conditions; notes that the exchange's share of total generation is only ~7% against a government vision of 25% for the short-term market in the next 3–4 years.
- REC market dependency: FY22 volume was ~60 lakh certificates; FY23 expectation of ~80–90 lakh certificates is reasonably confident but depends on state participation and their financial condition.
SN Goel: "Our market share out of the total generation today is only about 7%. And Government of India vision is to take this short-term market to 25% in the next 3, 4 years… base is definitely high, and to achieve growth of 35-40% is definitely going to be difficult, but I'm sure a reasonable growth of 20-25% should be possible to achieve."
Regulatory Pipeline: Products Awaiting CERC Action
- Long-duration contracts: IEX applied for delivery contracts up to 365 days; the hearing is held, public consultation is done, and the order is reserved, with a high chance of launch in May or June 2022.
- Gross Bidding: Application filed with CERC; CERC is yet to approve and is looking for more public discussions and comments; IEX is talking to states during policy advocacy to build participation readiness.
- Ancillary Market: CERC has notified Tertiary Ancillary Services through exchange, but the date of starting is yet to be notified by the regulator.
- National Open Access Registry: CERC approved the procedure, with implementation expected from 30 April 2022; management expects it will streamline the Open Access process and give a boost to the spot market, though the potential opportunity is difficult to quantify.
- Transaction fee approval: CERC directed IEX to file a separate application for transaction fees, which will be dealt with for all three exchanges together; management is "reasonably sure" of getting approval of 2 paise on either side as specified in CERC regulation, which has been industry practice for 11 years.
- MBED is dormant: Management declined to discuss MBED, stating the Ministry of Power issued a small document to CERC but CERC is not taking any action.
SN Goel: "I think we should stop discussing about MBED now. Nothing is happening in MBED. That's the only thing I can say. Ministry of Power has issued a small document to CERC for further taking action and CERC is not taking any action on that."
IGX & the Gas Market
- Consolidation impact: IGX segmental revenue in consolidated books was only ₹28 lakh because IGX ceased to be a subsidiary effective mid-January 2022 and became an associate; the majority of IGX volume picked up after that date and was not consolidated.
- Q4 EBITDA improved to ~₹1.8 cr from ₹1.14 cr in Q3.
- Gas price is the binding constraint: Historical gas prices of $5–6/MMBtu have risen above $30, making gas unaffordable for Indian consumers; management sees prices falling to $10–12 as the threshold for good transactions on IGX.
- Structural impediments persist: Non-uniform GST across states prevents uniform contracts; PNGRB has initiated tariff rationalization, and the Ministry has decided to create a system operator in the gas sector.
- Government target is to increase gas share in the energy bucket from 6% to ~15% by 2030, which will require resolving GST, tariff, and system operator issues.
- IGX stake divestment: PNGRB regulations require IEX to bring down its stake in IGX to 25% within 5 years of approval (by December 2025); management considers an IPO the best option for divesting 25% equity, though the final decision depends on market conditions 3.5 years down the line.
SN Goel: "The biggest problem, what we are facing in the gas market today is very high gas price. And unfortunately, the prices are so high that they are unaffordable for the Indian consumers. And the gas price which used to be $5-6 are today more than $30."
Balance Sheet & Liquidity
- Trade payables increased to ₹635 cr from ₹87 cr because of higher volumes and higher electricity prices trading at ₹14–15/unit; management describes this as temporary and expects normalization when prices settle.
- Cash balance increased to ₹225 cr at year-end because of the need for liquidity to meet payout obligations given higher prices, price volatility, and year-end banking holidays.
- Exchange fee stance: Management does not intend to ask for an upward revision of exchange fees.
Technology & Adjacent Initiatives
- API-based automated bidding launched for the Real-Time Market, with plans to commence for DAM, GDAM, and REC segments soon.
- API for market data launched to enable automatic data fetching across market segments.
- Web platform launched for digital onboarding, anytime-anywhere access to the trading system, and market data insights.
- Value-Added Services introduced for renewable generators, offering generation forecasting solutions from empaneled service providers.
- Carbon trading market: IEX is interacting with BEE, the Ministry of Environment, and the Ministry of Power to launch a unified carbon trading market merging EScerts and RECs with a multiplication factor to convert into carbon credits.
- Cross Border Electricity Market: IEX is consistently in touch with stakeholders in Bangladesh and is positive they will join the market shortly, working towards building an integrated South Asian power market.
Guidance & Commitments
| Commitment | Specifics | Timeline |
|---|---|---|
| Long-duration contracts launch | Delivery contracts up to 365 days in both electricity and renewable energy | By end of first quarter 2023; order reserved, high chance May/June 2022 |
| New market segments commencement | Ancillary Markets, Capacity Markets, Gross Bidding Contracts, National Open Access Registry | Optimistic about commencing in FY23 itself |
| Price cap removal | Cap understood to be interim, only for the deficit period | When supply situation improves; management expects improvement after 10 May 2022 |
| REC FY23 volume | ~80–90 lakh certificate transactions | FY23, dependent on state financial conditions |
| Transaction fee approval | 2 paise on either side as per CERC regulation | To be dealt with for all three exchanges together; no timeline given |
| IGX stake divestment to 25% | IPO considered best option as of now | By December 2025; final decision depends on market conditions 3.5 years out |
| Gas market transactions on IGX | Good transaction volumes expected if gas prices fall to $10–12/MMBtu | Conditional on gas price moderation from current $30+ |
Key Metrics
| Metric | Q4 FY22 |
|---|---|
| Standalone revenue | ₹128 crore, +25% YoY |
| PAT | +27% YoY, margin of 63% |
| FY22 standalone revenue | ₹478 crore, +34% YoY |
| FY22 PAT | ₹302 crore, +42% YoY, margin of 63% |
| FY22 dividend payout | 200% of face value (₹1 interim + ₹1 final), total outgo ~₹180 crore, 60% of net profit |
| Total volume | 27.032 BU, +21% YoY (23.659 BU conventional, 1.123 BU Green, 22.49 lakh REC certificates) |
| FY22 total volume | 102 BU, +37% YoY |
| FY22 conventional electricity volume | 90.618 BU, +24% YoY |
| FY22 Green Market volume | 4.945 BU, +530% YoY |
| FY22 REC market volume | 60.78 lakh certificates (6.078 BU), plus 2.86 lakh ESCERTs |
| FY22 new segments contribution | 24% of total volume (RTM, GDAM, GTAM) |
| IGX Q4 transaction fees | ₹5.6 crore |
| IGX Q4 EBITDA | ~₹1.5 crore |
| IGX Q4 total volume | 0.7 crore MMBtu (71,41,000) vs 0.01 crore MMBtu in Q4 FY21 |
| FY22 Open Access volume share | ~8% of total volume, clearing price ₹4.40/unit |
| FY23 REC volume expectation (IEX) | ~80–90 lakh certificates |
| IEX REC market share FY22 | 75%+ |
| FY22 Cross Border Electricity volume | ~1.05 BU (part of conventional DAM) |
| FY22 national peak demand | 201 GW, +6% YoY |
| FY22 electricity consumption | 1,370 BU, ~7.8% YoY |
| Total installed generation capacity | 399 GW, renewable 157 GW (~39%) as of 31 Mar 2022 |
| April 2022 demand increase | 11–12% YoY |
| Exchange price cap | ₹12/unit, imposed by CERC under government direction, expected interim |
| Bilateral market size for long-duration contracts | ~50–60 BU |
| CERC trading margin for traders | ₹0.07/unit |
| Exchange transaction fee | ₹0.02/unit on either side, industry practice for 11 years |
| FY22 total generation market share of IEX | ~7% |
| Government short-term market target | 25% in next 3–4 years |
| IGX FY22 PAT | ~₹1.8 crore, achieved financial breakeven |
| IGX FY22 total volume | 1.2 crore MMBtu (1,21,51,150) vs 0.02 crore MMBtu in FY21 |
| FY22 ESCERTs cumulative trade | 2.86 lakh ESCERTs (286 MU) |
| Trade payables | ₹635 crore vs ₹87 crore last year, driven by higher volumes and prices |
| Cash balance increase | ₹225 crore at year-end vs ~₹46 crore, for liquidity and payout obligations |